| 1 | Desilting of existing mala from Presidency Bridge to Managalivegu bridge under AE circle III HNK | S.SHIVASHANKAR | 05-06-2008 | 30 days | 10-07-2008 | 17/11/2008 | 79187 | 57151 | 0 | 57151 | 239 |
| 2 | desiliting of silt from cullage drain from H.No 11-23-1063, to Masid and other places in L.B Nagar Ward No 2 | Suresh Kumar.S | 21-04-2008 | 30 days | 10-07-2008 | 24/12/2008 | 72859 | 58296 | 0 | 58296 | 240 |
| 3 | desiliting at the Ex Box Drain from H.No 16-10-672 to Khammam road wgl | Suresh Kumar.S | 02-04-2008 | 30 days | 10-07-2008 | 24/12/2008 | 69786 | 52435 | 0 | 52435 | 241 |
| 4 | CC ROAD FROM 25-2-101 TO 25-2-111, 25-3-21/1 TO LANE AND EP.NO. HPK 32/11 to HPK 32/12 in ward no. 34 | Kumaraswamy. B | 22-11-2007 | 45 days | 10-07-2008 | 12/01/2009 | 177892 | 148634 | 0 | 148634 | 242 |
| 5 | Laying of WBM road from H.No. 2-8-665 to 2-8-670/4 at Excise Colony Hnk in Div.No.38 | Srinivas Tallapelli | 15-02-2008 | 30 days | 10-07-2008 | 27/11/2009 | 125372 | 104585 | 0 | 104585 | 243 |
| 6 | Formation of Gravel at beside of Petrol Bunk at Kashibugga Main Road, Warangal | DAYAKAR.G | 20-05-2008 | 30 days | 11-07-2008 | 20/11/2009 | 27996 | 23314 | 0 | 23314 | 244 |
| 7 | L/o cc road at srinagar colony at div.no.37 | Sanjeev. G | 25-02-2008 | 45 days | 14-07-2008 | 25/05/2009 | 359298 | 301044 | 0 | 301044 | 245 |
| 8 | Laying of C.C. Road from E.P.No.Man/4/01 to H.No.1-8-430 & H.No.1-8-431 to E.P.No.BSW 32 at Balasamudram Hnk. | Naresh Kumar.D | 06-12-2007 | 90 days | 15-07-2008 | 13/11/2008 | 658420 | 580657 | 0 | 580657 | 246 |
| 9 | Laying of CC Road from H.No.4-1-147 to 4-1-148 & 4-2-111 to 4-2-110/A at Kothuru, HNK W.No.45 | Naresh Kumar.D | 05-01-2008 | 60 days | 16-07-2008 | 03/11/2008 | 255944 | 227514 | 0 | 227514 | 247 |
| 10 | Construction of compound wall at Shanpoor gravel yeard at Ursu, Harijanawada, Wgl in W.No.11 | Sadanandam. B | 26-01-2008 | 45 days | 16-07-2008 | 26/02/2009 | 203751 | 182523 | 0 | 182523 | 248 |
| 11 | C.C drain from 2-1-653 to 2-1-695 at Gopalpuram Road, Hnk Ward No.42 | Laxmi Narayana.D | 03-03-2008 | 30 days | 21-07-2008 | 29/11/2008 | 0 | 103840 | 0 | 103840 | 250 |
| 12 | C/o Section ICC Drain from EP No. BNS7 to 1-9-987 at Julywada W.No.30 | Laxmi Narayana.D | 05-03-2008 | 45 days | 21-07-2008 | 12/01/2009 | 157017 | 124292 | 0 | 124292 | 251 |
| 13 | Construction of Section I CC Drain from E.P.No.40 VNN 6 to 2-9-35/5 at Vikasnagar, HNk in D.No.37 | Laxmi Narayana.D | 15-02-2008 | 30 days | 21-07-2008 | 10/06/2009 | 153898 | 116821 | 0 | 116821 | 252 |
| 14 | L/o WBM road and Const. of CC Drain from H.No. 16-3-498/3 to Ex-Culvert at Ekashila Nagar, Warangal inWard No. 15 | Ajay Dalitha LCCS Warangal | 08-08-2008 | 75 days | 25-07-2008 | 09/04/2009 | 649421 | 565611 | 0 | 565611 | 253 |
| 15 | Arresting of Leakages in Ward No.7 to 11 in Wgl | G.Sreedhar | 03-07-2008 | 15 days | 03-08-2008 | 27/04/2009 | 99540 | 93033 | 0 | 93033 | 254 |
| 16 | Laying of C.C. Road from H.No.1-7-752 to 1-7-799 at Shanthi nagar Hanamkonda in Ward No.29 | Laxmi Narayana.D | 12-02-2008 | 45 days | 05-08-2008 | 20/11/2008 | 277764 | 241158 | 0 | 241158 | 255 |
| 17 | Widening of CC Road from 5-4-87 to 5-4-104 at Ambala Road Hnk, in D.V 47 | M/s Mitra Constructions | 05-10-2007 | 60 days | 13-08-2008 | 07/02/2008 | 541810 | 470562 | 0 | 470562 | 256 |
| 18 | LAYING OF CC ROAD FROM5-9-163 TO EP NO KNR 4 AT SIKHWADA HNK DIV NO 46 | M/s Mitra Constructions | 26-10-2007 | 30 days | 13-08-2008 | 27/09/2008 | 114157 | 102256 | 0 | 102256 | 257 |
| 19 | Laying of CC Road from 5-9-105 to ICICI Bank Main Road at Kishanpura, HNK in W.No.46 | M/s Mitra Constructions | 04-09-2007 | 45 days | 13-08-2008 | 27/09/2008 | 268674 | 240003 | 0 | 240003 | 258 |
| 20 | Construction of CC Drain from H.No.11-20-590 to Burrial ground at Padmanagar, Wgl in Div.No.1 | HLCCS-Rangampet | 25-06-2009 | 30 days | 15-08-2008 | 08/06/2009 | 117311 | 102957 | 0 | 102957 | 259 |
| 21 | L/O BT ROAD FROM HNO.2-7-506 TO OPP HNO 2-7-1246 AT EXCISE COLONY HNK DIV .NO.39 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 02-02-2008 | 45 days | 20-08-2008 | 24/01/2009 | 498266 | 443067 | 0 | 443067 | 260 |
| 22 | Construction of CC Drain Pipe Line at Beside Raipura Park, HNK Ward No.50 | Manohar.M | 12-02-2008 | 30 days | 23-08-2008 | 19/02/2008 | 39036 | 34239 | 0 | 34239 | 261 |
| 23 | Laying of C.C Road from 2-4-11 to 2-4-13 and Construction of C.C Drain from 2-4-14 from 45 at Ramnagar | Manohar.M | 25-11-2007 | 45 days | 23-08-2008 | 31/10/2008 | 176845 | 157771 | 0 | 157771 | 262 |
| 24 | Construction of Cc Drain Section-I JPN 15/3 to JPN 15 and DSM 16/2 at Vishwakarma Street, Yellamma Bazar, Warangal | Ravi kumar.P | 28-11-2007 | 30 days | 27-08-2008 | 08/11/2009 | 150722 | 118383 | 0 | 118383 | 263 |
| 25 | C/O CC DRAIN FROM EPNO. CMS 5 TO CMS 5/1 & UPTO 2-5-410 BEHIND CHOTI MASID | Ravi kumar.P | 15-04-2008 | 30 days | 28-08-2008 | 27/09/2008 | 91093 | 81678 | 0 | 81678 | 264 |
| 26 | C/o compoundwall at Rangasaipet Grave yard opp. Raman public School Rangasaipet W.No. 10 | Shiva Constn. | 07-06-2006 | 60 days | 02-09-2008 | 03/12/2008 | 396999 | 318861 | 0 | 318861 | 265 |
| 27 | C/o of Compound Wall at Medarakunta Burrial Ground at Jakkalodi Road Rangasaipet W.No.11 | Mallaiah. A | 04-02-2008 | 75 days | 02-09-2008 | 26/12/2008 | 662835 | 591525 | 0 | 591525 | 266 |
| 28 | Construction of Section I C.C Drain from H.No.2-6-1049 to 1058 at K.L.N Reddy Colony HNK Ward No.38 | Suresh Kumar.S | 18-12-2007 | 30 days | 05-09-2008 | 18/11/2008 | 87175 | 76435 | 0 | 76435 | 267 |
| 29 | Construction of Section I CC drain from EP No. SP87/A/4 to 23-1-23/3 at Shayampet HNK in W.No.28 | Laxmi Narayana.D | 01-03-2008 | 30 days | 05-09-2008 | 20/11/2008 | 87755 | 76613 | 0 | 76613 | 268 |
| 30 | L/o WBM Road from H.No. 2-1-541 to 2-11-511 at Vidyaranyapuri, HNK in Div.No.43 | Laxmi Narayana.D | 29-12-2007 | 30 days | 05-09-2008 | 05/12/2008 | 44928 | 36672 | 0 | 36672 | 269 |
| 31 | Laying C.C.Road from Ex-C.C. Road to E.P.No.MGR - 1 at SrinivasNagar Colony, Warangal in Div.No.51 | Sri Venkateshwara Constructions | 31-03-2008 | 30 days | 06-09-2008 | 31/10/2008 | 81394 | 72068 | 0 | 72068 | 270 |
| 32 | Laying of CC Road patches contruction of RCC Slab Culvert and Construction of section I CC Drain at Ram Nagar, Ward No.22 | Venkateshwarlu P. | 29-11-2007 | 45 days | 09-09-2008 | 31/01/2009 | 166000 | 127542 | 0 | 127542 | 271 |
| 33 | CONSTRUCTION OF 380MM SIZE DRAIN FROM H.NO.11-25-692, TO 685 AT KOTHAWADA, WARANGAL | MSR CONSTRUCTIONS | 08-03-2008 | 30 days | 10-09-2008 | 05/11/2008 | 103938 | 81934 | 0 | 81934 | 272 |
| 34 | L/o CC Road from 22-8-162 to 165 at 148 to 151 at Doctors Colony | MSR CONSTRUCTIONS | 2-10-2007 | 30 days | 10-09-2008 | 07/11/2008 | 151643 | 122513 | 0 | 122513 | 273 |
| 35 | L/o WBM road from 11-29-60 to 11-24-135 at Prudvi Nagar Wgl | MSR CONSTRUCTIONS | 07-03-2008 | 30 days | 10-09-2008 | 07/11/2008 | 161479 | 123023 | 0 | 123023 | 274 |
| 36 | L/o CC Road from H.No. EP No. 23/8 to WPW 23/06 at Waddepally HNk | MSR CONSTRUCTIONS | 26-10-2007 | 60 days | 10-09-2008 | 07/11/2008 | 493087 | 429686 | 0 | 429686 | 275 |
| 37 | Desilting of Suvarage Drain from 11-24-116 to 80 feet Road Junctionto H.No.11-28-21/1 at Kothawada WGL | Suresh Kumar.S | 04-06-2008 | 30 days | 10-09-2008 | 15/11/2008 | 84963 | 79497 | 0 | 79497 | 276 |
| 38 | Desilting from existing box drain from 11-23-1083/1 to 11-23-214 at LB Nagar Wgl | Suresh Kumar.S | 27-06-2008 | 30 days | 10-09-2008 | 17/11/2008 | 19939 | 18175 | 0 | 18175 | 277 |
| 39 | Laying of C.C Road and Construction of C.C Drain at Laxminagar, Kareemabad Warangal in Ward No.14 | M/s ADLCMA CO-Op society. | 26-02-2008 | 75 days | 11-09-2008 | 16/03/2009 | 500000 | 439500 | 0 | 439500 | 279 |
| 40 | Construction of Compound Wall at H.No.11-22-768 at BN Rao Colony, Wgl | Sathyanarayana.B | 21-07-2008 | 30 days | 16-09-2008 | 16/06/2008 | 92567 | 80618 | 0 | 80618 | 280 |
| 41 | Laying of C.C. Road of from H.No.17-5-160 to Exist C.C. Road at | Venkateshwarlu P. | 18-02-2007 | 45 days | 16-09-2008 | 21/10/2008 | 179957 | 147293 | 0 | 147293 | 281 |
| 42 | Laying of C.C Road from 7-7-219 to 7-7-221 to 7-7-221 to 7-8-95 to 7-8-96 from H.No. 6-3-165 to EX C.C Road Near Machili Bazar, HNK. Ward No.27 | Suresh Kumar.S | 28-08-2006 | 30 days | 16-09-2008 | 19/12/2008 | 140486 | 122059 | 0 | 122059 | 282 |
| 43 | Laying of CC Road from 16-3-398 to Masjid at Perukawada, Wgl W.No.15 | M/s. ASHOKA DALITHA CIVIL AND SANITATION LCWM C & S LTD., | 08-02-2008 | 60 days | 16-09-2008 | 04/02/2009 | 446443 | 395325 | 0 | 395325 | 283 |
| 44 | laying of cc road and contrction of section 2 drain rccslab colvert from 10-13-122 to main and 10-13-52 to 10-13-55 at laxmipuram warangal ward 22 | S.SHIVASHANKAR | 19-08-2009 | 30 days | 16-09-2008 | 19/03/2009 | 150119 | 132902 | 0 | 132902 | 284 |
| 45 | Laying of CC Road from St. Francis School to H.No; 25-8-7 at Bhavaninagar, Kazipet, Ward No. 33 | Gidde Narsaiah | 18-08-2008 | 60 days | 16-09-2008 | 15/09/2009 | 472505 | 387856 | 0 | 387856 | 286 |
| 46 | Laying of CC Road from 11-1-47 to 11-1-153 at SRT Colony, Wgl W.No.56 | Sathyanarayana.B | 15-04-2008 | 30 days | 18-09-2008 | 19/11/2008 | 94039 | 84039 | 0 | 84039 | 287 |
| 47 | Laying of CC Road from 1121-101 to 11-21-196 at Kashibugga, Wgl W.No.3 | Sathyanarayana.B | 16-07-2008 | 45 days | 18-09-2008 | 19/11/2008 | 183750 | 160698 | 0 | 160698 | 288 |
| 48 | L/o WBM road at teacher Colony Hnk | M/s. P.W.L.C.Coop.Society, Laxmipuram | 28-01-2009 | 60 days | 18-09-2008 | 15/06/2009 | 245957 | 206403 | 0 | 206403 | 289 |
| 49 | Construction of Section I & II CC Drains in Shivanagar, W.No.17 | Shiva Constn. | 04-06-2006 | 60 days | 22-09-2008 | 23/12/2008 | 656312 | 481270 | 0 | 481270 | 290 |
| 50 | Construction of C.C Road from 5-11-1225 to 5-11-1272, 5-11-1207 and HNK 1215 at Pochamma kunta, HNK in Div.No.44 | M/s Mitra Constructions | 05-11-2007 | 45 days | 23-09-2008 | 07/02/2009 | 272268 | 241906 | 0 | 241906 | 291 |
| 51 | Laying of WBM Road from existing BT road to school of Kothagadda East Fort Wgl W.No. 09 | Laxmi Narayana.D | 26-02-2008 | 30 days | 25-09-2008 | 12/01/2009 | 83498 | 67455 | 0 | 67455 | 292 |
| 52 | C/O RR MASONARY AND COSTING OF EXCAVATED EARTH FROM EM DRESSES TO SBI WARANGAL OLD BEET BAZAR | Ravi kumar.P | 18-06-2006 | 30 days | 26-09-2008 | 19/12/2008 | 99500 | 89483 | 0 | 89483 | 293 |
| 53 | Construction of C.C Drain from H.No.16-10-1212 to 1200 at Shivanagar, Warangal Ward No.17 | Shiva Constn. | 03-06-2008 | 60 days | 30-09-2008 | 04/11/2008 | 336938 | 247966 | 0 | 247966 | 294 |
| 54 | C/o CC Drain from H.No. 2-4-355 to existing box drain and internal drains in ram nagar police colony HNK Div. 41 | Shiva Constn. | 04-04-2006 | 60 days | 30-09-2008 | 03/12/2008 | 514000 | 384509 | 0 | 384509 | 295 |
| 55 | C/O SECTION1 CC DRAIN FROM SECTIONN2 DRAINS FROM 16-4-1435 TO 1437, 16-4-1461 TO 1466 AND 16-4-823 TO 805 AT SHIVANAGAR WGL DIV 16 | Shiva Constn. | 17-06-2008 | 30 days | 30-09-2008 | 17/12/2008 | 205705 | 152794 | 0 | 152794 | 296 |
| 56 | C/O SECTION 2 CC DRIAN FROM 16-4-965 TO 16-4-980 AT SHIVANA GAR WGL DIV 16 | Shiva Constn. | 17-06-2008 | 30 days | 30-09-2008 | 17/12/2008 | 134213 | 98667 | 0 | 98667 | 297 |
| 57 | C/O SECTION1 CC DRAIN FROM 17-5-115 TO 17-5-123,AND 17-5-145 TO EPNO KWT 7/5 AT URUS AT KAREEMA BAD DIV 12 | Shiva Constn. | 04-06-2006 | 45 days | 30-09-2008 | 17/12/2008 | 220000 | 163637 | 0 | 163637 | 298 |
| 58 | C/O SECTION 2 CC DRIAN FROM 16-4-269/1 TO FORT ROAD RUDRAMABA NAGAR WGL DIV NO 16 | Shiva Constn. | 04-06-2006 | 60 days | 30-09-2008 | 17/12/2008 | 363304 | 266394 | 0 | 266394 | 299 |
| 59 | Formation of gravel Road at Mysaiah Nagar Wgl in W.No.17 | G.Sreedhar | 21-08-2008 | 15 days | 03-10-2008 | 29/11/2008 | 74946 | 62313 | 0 | 62313 | 300 |
| 60 | L/O WBM ROAD FROM HNO.2-8-329 TO 2-8-329/7 AT VIJAYAPAL COLONY HNK | M/s. P.W.L.C.Coop.Society, Laxmipuram | 05-06-2008 | 45 days | 03-10-2008 | 24/01/2009 | 223852 | 190921 | 0 | 190921 | 301 |
| 61 | L/o CC road from H.NO.2-9-583/3 to 2-09-574/1 at Sri Laxmi Nagar Colony Hnk Div.37 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 01-03-2008 | 45 days | 03-10-2008 | 15/06/2009 | 332563 | 290414 | 0 | 290414 | 302 |
| 62 | Providing of SPS to CRC Building at Nakkalagutta | Chandra Mohan.P | 03-04-2008 | 15 days | 13-10-2008 | 10/11/2008 | 31982 | 29156 | 0 | 29156 | 303 |
| 63 | Construction of Section I CC Drain from 19-9-220/1 to 19-9-224/1 and 19-9-220 to 19-9-217 at Nandikunta, Rangasaipet, in Ward No.11 | M/s ADLCMA CO-Op society. | 01-08-2008 | 30 days | 14-10-2008 | 20/04/2009 | 136312 | 120871 | 0 | 120871 | 304 |
| 64 | Gravel filling of pound of Burrial Ground Vaijpai Colony, HNK | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 12-06-2008 | 30 days | 15-10-2008 | 22/04/2009 | 75029 | 57428 | 0 | 57428 | 305 |
| 65 | Laying of WBM Road from H.No.3-9-50 to End and H.No.3-9-47/1 to End of Reddy Colony, Hanamkonda in Div No.48 | Laxmi Narayana.D | 26-10-2007 | 30 days | 16-10-2008 | 20/11/2008 | 59978 | 49772 | 0 | 49772 | 306 |
| 66 | Consturction of 300 mm size drain from 15-4-85/1 to 15-4-98 at Pothana Nagar, Wgl in W.No.26 | Laxmi Narayana.D | 08-03-208 | 30 days | 16-10-2008 | 20/11/2008 | 87000 | 76341 | 0 | 76341 | 307 |
| 67 | Laying of C.C. Road from H.No.15-2-248 to 15-2-249 at Ramgampet, Warangal. | Laxmi Narayana.D | 18-03-2008 | 30 days | 16-10-2008 | 20/11/2008 | 65560 | 57778 | 0 | 57778 | 308 |
| 68 | DESILTING OF SILT FROM DRAIN FROM H.NO.8-2-127 AT OLD BEET BAZAR FOR C/O RR MASONARY | Ravi kumar.P | 18-06-2006 | 30 days | 16-10-2008 | 19/12/2008 | 94700 | 84917 | 0 | 84917 | 309 |
| 69 | RESTOATION OF EXISTING DAMAGED DRAIN BY C/O CC DRAIN AT LAXMI NAGAR W.NO.14 | GORRE AMARNATH | 12-08-2008 | 30 days | 16-10-2008 | 17/02/2009 | 92000 | 82309 | 0 | 82309 | 310 |
| 70 | | | | | | | 14573677 | 12339362 | 0 | 12339362 | 16765 |
| 71 | Construction of Drain and CC Road from 11-27-1 to 11-27-75 at Kothawada in Ward No.53 | Laxmi Narayana.D | 09-10-2007 | 30 days | 16-10-2008 | 26/02/2009 | 146819 | 115889 | 0 | 115889 | 311 |
| 72 | formation of gravel road of ambedkar nagar fort road warangal | Sri Venkateshwara Constructions | 21-08-2008 | 15 days | 17-10-2008 | 01/11/2008 | 64569 | 53710 | 0 | 53710 | 313 |
| 73 | formation gravel road of bhagath nagar SRR thota, Warangal Div.no.18 | Sri Venkateshwara Constructions | 21-08-2008 | 15 days | 17-10-2008 | 01/11/2008 | 44650 | 37124 | 0 | 37124 | 314 |
| 74 | Restoration of Existing Damaged Drain by Construction of CC Drain Wgl in Ward No.12 | Mandala Suresh | 20-08-2008 | 30 days | 30-10-2008 | 19/03/2009 | 100353 | 89984 | 0 | 89984 | 316 |
| 75 | Laying of CC Road from 5-11-793 to 5-11-789/3 at Sagara Colony, HNK W.No.44 | G. Sathyanarayana | 15-09-2008 | 45 days | 01-11-2008 | 23/06/2009 | 204530 | 185297 | 0 | 185297 | 317 |
| 76 | Attendingof petty water supply works in AE circle No.II | Chandra Mohan.P | 20-11-2007 | 30 days | 05-11-2008 | 17/11/2008 | 70206 | 81968 | 0 | 81968 | 318 |
| 77 | L/o 110 mm dia HDPE pipeline from 1-2-230 to 1-2-290 at Rahmath nagar, Kazipet | Chandra Mohan.P | 20-11-2007 | 30 days | 05-11-2008 | 17/11/2008 | 44946 | 41912 | 0 | 41912 | 319 |
| 78 | L/o 140 mm & UDPE pipeline from 25-08-6161 to 25-8-628 at Shanthi nagar Kazipet | Chandra Mohan.P | 01-07-2008 | 30 days | 05-11-2008 | 19/11/2008 | 76688 | 69903 | 0 | 69903 | 320 |
| 79 | Supply and delivery of 6 S.O.J under A.E Circle I, Kazipet | Chandra Mohan.P | 12-04-2008 | 30 days | 05-11-2008 | 19/11/2008 | 49565 | 45176 | 0 | 45176 | 321 |
| 80 | Laying of C.C Road near Pochamma Temple at Pochamma Kunta, HNK | Naresh Kumar.D | 12-06-2008 | 30 days | 05-11-2008 | 08/12/2008 | 98860 | 87680 | 0 | 87680 | 322 |
| 81 | Laying of c.C. Road and Section - I C.C. Drain H.No.5-11-1003 to 5-11-100 Pochammakunta, Hnk | Naresh Kumar.D | 12-06-2008 | 30 days | 05-11-2008 | 08/12/2008 | 37545 | 33323 | 0 | 33323 | 323 |
| 82 | Restoration of 200 mm dia HDPE pipeline at Opp. Solar Tailors Deshaipet Road Wgl. | Chandra Mohan.P | 15-07-2008 | 30 days | 05-11-2008 | 10/12/2008 | 41897 | 38222 | 0 | 38222 | 324 |
| 83 | Repairs to central deviders at Naidu Petrol PUmp Junction at Wgl | Chandra Mohan.P | 15-07-2008 | 30 days | 05-11-2008 | 10/12/2008 | 70752 | 34992 | 0 | 34992 | 325 |
| 84 | repairs to existing central dividers at naidu petrol pump | Chandra Mohan.P | 30-06-2008 | 30 days | 05-11-2008 | 11/12/2008 | 38000 | 34992 | 0 | 34992 | 326 |
| 85 | Arresting of Leeakeges in Various Locations in Div.No.12 to 14 and 19, 25 and 2 at Kareemabad, Wgl | Chandra Mohan.P | 25-07-2008 | 30 days | 05-11-2008 | 11/12/2008 | 50000 | 45571 | 0 | 45571 | 327 |
| 86 | Laying of 200 mm HDPE pipe Line and Filling of S.V.S at Behind REC Bus Stop | Chandra Mohan.P | 02-08-2008 | 30 days | 05-11-2008 | 11/12/2008 | 86703 | 79025 | 0 | 79025 | 328 |
| 87 | engage of lasour for alge andngrossin bhdrakali wgl | Chandra Mohan.P | 12-11-2007 | 15 days | 05-11-2008 | 07/01/2009 | 19925 | 18632 | 0 | 18632 | 329 |
| 88 | Arresting of leakages on 900 mm dia and 600 mm dia pipeline at Desaipet road Autonagar, Warangal. | Chandra Mohan.P | 05-01-2008 | 30 days | 05-11-2008 | 12/01/2009 | 37924 | 34645 | 0 | 34645 | 330 |
| 89 | GRAVEL FORMATION AND FILLING FOR POT HOLES INTERNAL ROADS AT RAHAMATH NAGAR KAZIPET | Kumaraswamy. B | 25-07-2008 | 30 days | 05-11-2008 | 12/01/2009 | 39893 | 33151 | 0 | 33151 | 331 |
| 90 | filling of fut holds with gravel and awary dust at somidi village on he occationof pochamma festivals | Kumaraswamy. B | 23-08-2008 | 30 days | 05-11-2008 | 12/01/2009 | 39000 | 31666 | 0 | 31666 | 332 |
| 91 | Restoration of damaged existing road by formation of gravel road from H.no.12-8-213/4 to road end of Santhoshmatha Wgl in ward no. 19 | M/S SAI KRUPA ENTERPRISES | 20-08-2008 | 30 days | 05-11-2008 | 04/03/2009 | 69732 | 57932 | 0 | 57932 | 333 |
| 92 | Gravel formation from H.No.1-1-123 to E.P.Ro TCK 12/6 at Kapornaik thanda Kzp in Ward (36) | Kumaraswamy. B | 02-08-2008 | 30 days | 05-11-2008 | 23/03/2009 | 83419 | 69320 | 0 | 69320 | 334 |
| 93 | Removal of Alge and Race from Bhadra Kali SS Tank at Wgl | Chandra Mohan.P | 19-05-2008 | 30 days | 05-11-2008 | 11/06/2009 | 75540 | 70754 | 0 | 70754 | 336 |
| 94 | Providing and placing of syntax tanks at Mini Municipal Corporation, Kazipet | Kumaraswamy. B | 20-08-2008 | 30 days | 05-11-2008 | 16/06/2009 | 57675 | 52301 | 0 | 52301 | 337 |
| 95 | Laing of WBM Road from H.No.2-10-284 to H.No.2-10-361 at Teachers Colony Phase-II Hanamkonda in Div.No. 37 | VCR ASSOCIATES | 21-04-2008 | 30 days | 05-11-2008 | 25/10/2009 | 250300 | 179905 | 0 | 179905 | 338 |
| 96 | Construction of Compound wall and room at Rangasaipet Reservoir Rangasaipet Warangal in Ward No.10 | P. Lavakusha Reddy | 24-08-2006 | 60 days | 05-11-2008 | 09/11/2009 | 399210 | 344590 | 0 | 344590 | 339 |
| 97 | C/o Sec-I & II CC drains in Shivanagar W.No.17 | Mallaiah. A | 26-02-2008 | 30 days | 06-11-2008 | 27/12/2008 | 656312 | 481270 | 0 | 481270 | 340 |
| 98 | Construction of CC Drain and Laying of CC Road at Kareemabad Wgl in Ward No.13 | Mallaiah. A | 28-02-2008 | 75 days | 06-11-2008 | 28/03/2009 | 615847 | 552356 | 0 | 552356 | 341 |
| 99 | Laying of C.C. Road from 1123 - 2383/1 to 11-23-2388 at Navayuga Colony, Warangal In Ward No.2 | DAYAKAR.G | 19-08-2008 | 30 days | 06-11-2008 | 09/04/2009 | 138826 | 124259 | 0 | 124259 | 342 |
| 100 | L/o WBM Road from Annapurna complex to Anganwadi Drain V.Nagar Colony Kareembad Wgl in W.No. 15 | Mallaiah. A | 28-02-2008 | 30 days | 06-11-2008 | 21/05/2009 | 154138 | 130546 | 0 | 130546 | 343 |
| 101 | L/o CC road from EP.No.65 to H.No. 10-13-33 at laxmipuram, Warangal ward. 22 | Komuraiah.S | 26-08-2008 | 30 days | 10-11-2008 | 31/12/2008 | 99478 | 87766 | 0 | 87766 | 344 |
| 102 | Construction of CC Road from Opp: 11-3-79 to 11-1-289 and WBM Road and Construction of CC Drain in SRT Colony, Wgl D.No.6 | Komuraiah.S | 12-03-2008 | 60 days | 10-11-2008 | 14/05/2009 | 492220 | 434827 | 0 | 434827 | 345 |
| 103 | PROCURMENT OF TREE GUARDS IN WGL COPPORATION LIMIT | Sadanandam. B | 28-08-2008 | | 11-11-2008 | 24/07/2008 | 137500 | 128577 | 0 | 128577 | 346 |
| 104 | Laying of C.C. Road from Rangaiah Taddy shop to Railway gate at Kareembad, wgl | Sri Venkateshwara Constructions | 11-10-2007 | 60 days | 12-11-2008 | 10/12/2008 | 279644 | 242017 | 0 | 242017 | 347 |
| 105 | laying of cc road from H no 16-1-670/1 at srr thota wgl ward no 18 | Sri Venkateshwara Constructions | 17-09-2008 | 75 days | 12-11-2008 | 10/12/2008 | 564534 | 479231 | 0 | 479231 | 348 |
| 106 | Laying of WBM Road and C.C Road from 16-3-461 to 498 and 16-3-504 to 511 and 16-3-985 to Landry Shop and 16-3-1052 to 1048 and Div.No.15 | Preethi Const. | 20-08-2008 | 90 days | 12-11-2008 | 31/12/2008 | 758291 | 631300 | 0 | 631300 | 349 |
| 107 | Laying of CC Road from 11-19-142 to 11-19-128 at Kashibugga, Wgl W.No.3 | Sri Venkateshwara Constructions | 26-08-2008 | 60 days | 12-11-2008 | 15/01/2009 | 338499 | 290145 | 0 | 290145 | 350 |
| 108 | contrution of section1 cc drain from H. NO 14-6-26 to 14-6-191 and 14-6-42 to 14-6-185 opp 14-6-20 to 14-6-137 at nizam pura warangal ward no 23 | Sri Venkateshwara Constructions | 19-08-2008 | 45 days | 12-11-2008 | 07/03/2009 | 205248 | 167915 | 0 | 167915 | 351 |
| 109 | C/o of SEC- 1 and II CC Drain from 16-4-1290 to Ex-Transformer at other placer Bhupesh Nagar Warangal in Ward No. 16 | Preethi Const. | 16-07-2008 | 75 days | 12-11-2008 | 27/04/2009 | 500720 | 385913 | 0 | 385913 | 352 |
| 110 | Construction of CC Drain and Laying of CC Roads at Kareemabad, W.No.14 | Sri Venkateshwara Constructions | 20-08-2008 | 75 days | 12-11-2008 | 24/07/2009 | 536359 | 429291 | 0 | 429291 | 353 |
| 111 | CONSTRUCTIONOF 300 MM SIZE DRAINGES FROM H.NO.11-25-517 TO 11-25-433 AT KOTHAWADA, WGL WARD NO.52 | Sri Venkateshwara Constructions | 28-07-2008 | 45 days | 13-11-2008 | 21/12/2008 | 165000 | 131702 | 0 | 131702 | 354 |
| 112 | Construction of CC Drain 300 mm size from EP No. P KM 14/1 to 11-26-167 at Kothawada, Wgl W.No.51 | Sri Venkateshwara Constructions | 28-07-2008 | 45 days | 13-11-2008 | 24/12/2008 | 185000 | 148055 | 0 | 148055 | 355 |
| 113 | Laying of C.C Drain from H.No.25-6-358 to 25-6-363 at Vishnupuram | Naresh Kumar.D | 02-11-2007 | 30 days | 14-11-2008 | 29/11/2008 | 126277 | 102798 | 0 | 102798 | 356 |
| 114 | Laying of C.C Road from 5-11-743 to Static Tank at HNK | Naresh Kumar.D | 05-11-2007 | 45 days | 14-11-2008 | 31/12/2008 | 270804 | 233276 | 0 | 233276 | 357 |
| 115 | Restoration of Existing damaged drain by construction of CC drain of Bakshima halla W.No.13 | Srinivas. B | 12-08-2008 | 30 days | 14-11-2008 | 04/03/2009 | 97000 | 85106 | 0 | 85106 | 358 |
| 116 | Restoration of Existing Damaged Road by formation of gravel road at 18-3-51 to 255 at Harijanawada Ward.No.13 | Srinivas. B | 20-08-2008 | 30 days | 14-11-2008 | 04/03/2009 | 97781 | 81243 | 0 | 81243 | 359 |
| 117 | Construction of C.C Drain from H.No.2-1-493 to 4-1-495/1 at 100 feet road | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 02-08-2008 | 30 days | 14-11-2008 | 22/04/2009 | 52594 | 46985 | 0 | 46985 | 361 |
| 118 | Laying of CC Road and Drain from 2-1-788 to 2-1-789/1and 2-1-794 to 2-1-801 at Laskhar Singara, Hanamkonda | Ramesh.B | 07-03-2008 | 75 days | 14-11-2008 | 16/10/2009 | 169958 | 147073 | 0 | 147073 | 363 |
| 119 | Laying of C.C Road from H.No.2-12-310/2 to 2-12-315/1 at Vidyaranyapuri, HNk in Div.No.43 | Naresh Kumar.D | 21-01-2008 | 65 days | 14-11-2008 | 03/12/2009 | 262615 | 229858 | 0 | 229858 | 364 |
| 120 | Construction of Section -II CC Drain from 3-5-44 to 3-5-66 at Gudi Bandal, Hanamkonda in Division no.47 | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 28-08-2008 | 30 days | 14-11-2008 | 10/12/2009 | 47937 | 43069 | 0 | 43069 | 365 |
| 121 | impervious coatto the 300 hp and 75 hp pump houses roof slab at kuc filter bed, HNK. | M/S SAI KRUPA ENTERPRISES | 29-03-2008 | 30 days | 15-11-2008 | 07/01/2009 | 67297 | 60875 | 0 | 60875 | 366 |
| 122 | filling of potholder with gravel at bhavani nagar on shanthi nagar on occation of pochamma festival ward no 33 | Kumaraswamy. B | 20-08-2008 | 30 days | 15-11-2008 | 12/01/2009 | 40571 | 33713 | 0 | 33713 | 367 |
| 123 | Laying of HDPE Pipe Line from 19-1-146 to Kapuwada at Rangasaipet, Wgl in W.No.11 | Suresh Kumar.S | 18-10-2008 | 60 days | 15-11-2008 | 24/01/2009 | 381000 | 325504 | 0 | 325504 | 368 |
| 124 | C/O SEC I & II CC DRAINS AND F/O GRAVEL ROAD FROM 19-6-10 TO KMM MAIN ROAD AT RANGASHIPET W.NO.10 | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 20-08-2008 | 30 days | 15-11-2008 | 24/03/2009 | 80495 | 70518 | 0 | 70518 | 369 |
| 125 | Uprooting the Ex-160mm dia HDPE pipe line and laying and jointing at Rudramamba Nagar Warangal in Ward No.16 | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 20-08-2008 | 15 days | 15-11-2008 | 17/07/2009 | 15000 | 12517 | 0 | 12517 | 370 |
| 126 | RESTOR ACTION OF EXISTING DAMAGED DRAIN BY C/O OF CC DRAINS BAKKIWADA WGL | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 20-08-2008 | 30 days | 15-11-2008 | 31/08/2009 | 99148 | 88975 | 0 | 88975 | 371 |
| 127 | Development of Burrial Ground in Ward No.6 at Labour Colony, Warangal | SATISH KUMAR . N | 20-08-2008 | 75 days | 17-11-2008 | 15/07/2009 | 547485 | 484319 | 0 | 484319 | 372 |
| 128 | Formation of Gravel Road and WBM Roads at W.No.13 | P. Lavakusha Reddy | 28-07-2008 | 30 days | 19-11-2008 | 18/07/2009 | 453515 | 362565 | 0 | 362565 | 373 |
| 129 | C/O CC DRAIN FROM HNO 5-11-1362 TO 5-11-1395 AT SAGAR COLONY WARD NO 44 | Srinivas. B | 30-08-2006 | 45 days | 20-11-2008 | 31/12/2008 | 218712 | 179180 | 0 | 179180 | 374 |
| 130 | Construction of Section II CC Drain from 2-7-1009 to 2-7-1008/2 at Kanakadurga Colony, HNK, D.No.39 | Sampath Rao.K | 28-06-2008 | 30 days | 21-11-2008 | 12/06/2009 | 26988 | 23710 | 0 | 23710 | 375 |
| 131 | Construction of Compound wall and burning plat form arround the burrial ground at For Warangal petrol pump, Warangal in Ward No. 10 ( General Budget) | MSR CONSTRUCTIONS | 24-08-2007 | 75 days | 21-11-2008 | 07/07/2009 | 441385 | 369255 | 0 | 369255 | 376 |
| 132 | Laying of CC Road and construction of Section-I CC Drain from H.No. 19-11-46 to 19-11-73 and 19-11-33 to SPK 24/4 at Shambunipet, Warangal in Div.No.10 | MSR CONSTRUCTIONS | 29-08-2007 | 75 days | 21-11-2008 | 20/11/2009 | 311355 | 283364 | 0 | 283364 | 377 |
| 133 | Laying of CC Road from Opp: 2-7-1233 to 2-7-1238 at Excise Colony, Hanamkonda in Div. no. 39 | Sanjeev. G | 08-06-2008 | 45 days | 22-11-2008 | 29/08/2009 | 255589 | 209278 | 0 | 209278 | 378 |
| 134 | Laying of CC & WBM Road from H.No. 2-6-1070/1 to 2-6-1099/2, 2-6-1075, 2-6-1076 at KLN Reddy colony Hanamkonda in Div.No.38 | Sanjeev. G | 05-06-2008 | 31 days | 22-11-2008 | 23/11/2009 | 661120 | 552136 | 0 | 552136 | 379 |
| 135 | C/o Section II CC Drain at Vambay Scheme Houses Kashikunta Wgl W.No.11-13-15 | MSR CONSTRUCTIONS | 28-07-2007 | 75 days | 25-11-2008 | 12/01/2009 | 745047 | 585759 | 0 | 585759 | 380 |
| 136 | Laying of CC Road from 16-10-14 to 16-10-72 at Shivanagar, Wgl W.No.17 | P. Jagadeeshwr Rao | 13-04-2006 | 60 days | 25-11-2008 | 25/04/2009 | 583890 | 498904 | 0 | 498904 | 381 |
| 137 | C/O SECTION - I CC DRAIN FROM HNO. 1- 7-753 TO 1-7-654 AT SHANTHI NAGAR HNK DIV.NO.29 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 20-08-2008 | 45 days | 27-11-2008 | 13/03/2009 | 158141 | 137107 | 0 | 137107 | 382 |
| 138 | 40 CC ROAD FROM HNO.2-5-340 TO HNO 2-5-242 AT NAKKALA GUTTA BEHIND CULVER ROAD HNK W.NO. | M/s. P.W.L.C.Coop.Society, Laxmipuram | 20-09-2008 | 60 days | 27-11-2008 | 13/03/2009 | 258727 | 231164 | 0 | 231164 | 383 |
| 139 | L/O WBM ROAD FROM HNO. 23-6-111 TO 23-6-129/40 AT DARGA COLONY HNK DIV.NO.28 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 12-08-2008 | 60 days | 27-11-2008 | 13/03/2009 | 579960 | 463749 | 0 | 463749 | 384 |
| 140 | L/O CC ROAD FROM HNO.1-8-143 TO APNO 29 BSMQ90 AT BALASAMUDRAM HNK W.NO.40 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 15-10-2008 | 60 days | 27-11-2008 | 13/03/2009 | 407875 | 364464 | 0 | 364464 | 385 |
| 141 | Laying of WBM Road from H.No.1-7-885/4 to 1-7-885/9 at Nandi Hills, HNK Div No.29 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 20-08-2008 | 60 days | 27-11-2008 | 13/03/2009 | 388764 | 310106 | 0 | 310106 | 386 |
| 142 | Laying of CC Road from H.No. 10-10-126 to 14-8-209/1 and Construction of RCC culvert in various places in Ward.No.22 | Komuraiah.S | 27-08-2008 | 60 days | 27-11-2008 | 20/11/2009 | 404932 | 361478 | 0 | 361478 | 387 |
| 143 | Laying of WBM Road from H.No. 2-8-573/1/3 to EP.No.ING 13/10/6, H.No. 2-8-688 to 2-8-689 at Indira Nagar, Hanamkonda in Div.No. 38 | Sanjeev. G | 15-07-2008 | 60 days | 27-11-2008 | 24/11/2009 | 248389 | 198936 | 0 | 198936 | 388 |
| 144 | C/o CC DRAIN from 11-29-233 to 11-29-227 at Rammanthapuri Wgl W.No.53 | Shiva Constn. | 04-06-2008 | 30 days | 28-11-2008 | 21/05/2009 | 154992 | 115644 | 0 | 115644 | 389 |
| 145 | Construction of Pipe Culverts and 300mm size CC Drain from 11-28-251/1 to 246 and 11-28-263 to 267 at Thummalakunta, Warangal W.No.53 | M/s Dalitha Labour Contract Co-operatice Society, Wgl | 28-07-2008 | 60 days | 01-12-2008 | 07/09/2009 | 341198 | 300015 | 0 | 300015 | 391 |
| 146 | Laying of WBM Road from EP no. LSP 26/1 to 2-2-31 and 2-2-32 to 471 at Rajaji Nagar, Hanamkonda in Ward.No. 42 | M/s Dalitha Labour Contract Co-operatice Society, Wgl | 17-09-2008 | 60 days | 01-12-2008 | 23/11/2009 | 328772 | 277290 | 0 | 277290 | 392 |
| 147 | Laying of WBM Road from Opp: 2-8-328 to 2-8-320/2 at Vijaypal Colony, HNK | Sanjeev. G | 20-09-2008 | 30 days | 03-12-2008 | 16/06/2009 | 210641 | 169709 | 0 | 169709 | 393 |
| 148 | Construction of CC Drain from EP No. BES 6/12 to 2-8-573/1/3 at Indiranagar, HNK D.No.38 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 03-08-2008 | 60 days | 03-12-2008 | 30/06/2009 | 459992 | 400532 | 0 | 400532 | 394 |
| 149 | sleeping of puthold work at duga shivar on occaction of ramzan festival ward no 31 | Kumaraswamy. B | 29-09-2008 | 30 days | 11-12-2008 | 12/01/2009 | 20509 | 17062 | 0 | 17062 | 395 |
| 150 | Gravel filling on the occasion of bathukamma festival at bodagutta kazipet W.No. 32 | Kumaraswamy. B | 07-11-2008 | 30 days | 11-12-2008 | 19/03/2009 | 43077 | 35836 | 0 | 35836 | 396 |
| 151 | Filling pot house with gravel at Edgah Kazipet on Occassion of Ramzan festival in W.No.35 | Kumaraswamy. B | 30-09-2008 | 30 days | 12-12-2008 | 05/01/2009 | 14853 | 12357 | 0 | 12357 | 397 |
| 152 | Construction of 300 mm and 380 mm side CC Drain from 11-24-285 to 494 & 11-24-229 to 374 at Pochamma maindan, Harijanawada, Wgl | HLCCS-Rangampet | 28-07-2008 | 60 days | 17-12-2008 | 24/02/2009 | 329609 | 276059 | 0 | 276059 | 399 |
| 153 | Construction of Section I and II CC Drain from 17-10-62 to 17-10-68, 17-10-78 and other places Ursu, Kareemabad, Wgl in Ward No.12 | Mandala Suresh | 20-08-2008 | 60 days | 17-12-2008 | 19/03/2009 | 425000 | 326684 | 0 | 326684 | 400 |
| 154 | Construction of Section I CC Drain at Fort Wgl East Fort, Wgl in Ward No.9 | Mandala Suresh | 20-08-2008 | 60 days | 17-12-2008 | 06/04/2009 | 303201 | 238195 | 0 | 238195 | 401 |
| 155 | Dismentalling of collapsed old building at beside Municipal Office, Warangal | Naga Raju T | 20-10-2008 | 30 days | 17-12-2008 | 11/04/2009 | 85000 | 75388 | 0 | 75388 | 402 |
| 156 | Laying of WBM Road and Construction of Section I CC drain from 16-3-1088/1 to 16-3-1057 at Ambedkar Nagar, W.No.15 | M/s Sri Nagamaiah WLCPSSS LTD | 20-08-2008 | 60 days | 17-12-2008 | 06/05/2009 | 311961 | 271880 | 0 | 271880 | 403 |
| 157 | L/o cc Road from 16-1-147 to 138 and 16-1-430 existing culvert and 16-1-33 to 16-1-26/1/19 SRR Thota Wgl Div.No.18 | M/s Sri Nagamaiah WLCPSSS LTD | 20-08-2008 | 75 days | 17-12-2008 | 21/05/2009 | 545702 | 488129 | 0 | 488129 | 404 |
| 158 | C/o CC Drain from 2-7-976 to 2-7-669 on Excise colony main Road at Hanamkonda in Div.No.39 | Sampath Rao.K | 16-07-2008 | 75 days | 17-12-2008 | 12/06/2009 | 988408 | 705534 | 0 | 705534 | 405 |
| 159 | Laying of CC Road and C/o of CC Culvert at Karimabad. | M/s Sri Nagamaiah WLCPSSS LTD | 20-08-2008 | 60 days | 17-12-2008 | 19/07/2009 | 532761 | 469988 | 0 | 469988 | 406 |
| 160 | Construction of RCC Slab Culvert at Pochamma temple, Sakarasikunta, Warangal in Ward no.18 | Komuraiah.S | 23-08-2008 | 75 days | 18-12-2008 | 08/06/2009 | 657317 | 588392 | 0 | 588392 | 407 |
| 161 | Leveling of Ground at Various Locations in Div No.30 for the accession of Bathukamma Festival | Ravinder Rao A | 09-10-2008 | 30 days | 23-12-2008 | 06/10/2009 | 34000 | 28023 | 0 | 28023 | 408 |
| 162 | GRAVELWBM ROAD FROMSDM LHS 26/1 | Chandra Mohan.P | 13-08-2008 | 30 days | 24-12-2008 | 21/04/2009 | 94232 | 79839 | 0 | 79839 | 409 |
| 163 | Levelling the ground at various locations in Div.No.37 for the Occassion of Bathukamma Festival | Ravinder Rao A | 05-10-2008 | 30 days | 24-12-2008 | 26/05/2009 | 29104 | 24212 | 0 | 24212 | 411 |
| 164 | Laying of CC Road from 5-11-1362 to 5-11-1395 at Pochammakunta Hanamkonda in Ward.No.44 | Srinvias P | 28-08-2008 | 45 days | 24-12-2008 | 15/09/2009 | 253000 | 224039 | 0 | 224039 | 412 |
| 165 | Construction of Boundary pillars from Warangal Municipal Corporation open places in Warangal at Shivangar, Ursu and Kareemabad Ward No. 12,17 and 18 (10% open spaces Budget) | Ravi kumar.P | 05-11-2007 | 60 days | 24-12-2008 | 20/10/2009 | 50147 | 45749 | 0 | 45749 | 413 |
| 166 | CONTRUCTION OF DETAINING WALL AT LGHLSH 26/1 AT RAJALINGAM HNK | Chandra Mohan.P | 13-08-2008 | 30 days | 29-12-2008 | 21/04/2009 | 86383 | 76618 | 0 | 76618 | 414 |
| 167 | L/o CC Road from H.No. 11-22-822/13 to & 21 and 11-22-823 at Madinaveedi Wgl Div.No.3 | Sathyanarayana.B | 20-08-2009 | 75 days | 02-01-2009 | 13/04/2009 | 467907 | 400569 | 0 | 400569 | 415 |
| 168 | Laying of CC Road from K & M 50/2/3 to 11-22-821 and 11-21-99 at Kashibugga, Wgl in Div No.3 | Sathyanarayana.B | 30-10-2008 | 60 days | 12-01-2009 | 28/02/2009 | 414827 | 355135 | 0 | 355135 | 417 |
| 169 | Laying of CC Road from H.No.1-8-452 to 1-8-450 at Balasamudram Hanamkonda in Ward.No.40 | Chandra Mohan.P | 30-07-2008 | 30 days | 12-01-2009 | 26/10/2009 | 136613 | 118265 | 0 | 118265 | 418 |
| 170 | Laying of CC Road from H.No. 2-8-582 to EP No. ING 13/8/1 and H.No.2-8-493 to EP No. ENG 15 at Indira Nagar, Hanamkkonda in Div.No.38 | Chandra Mohan.P | 27-10-2008 | 45 days | 12-01-2009 | 26/10/2009 | 179372 | 158429 | 0 | 158429 | 419 |
| 171 | L/o of CC Road and WBM Road from 7-2-17 to 95 Machilibazar, HNK | Rajendra Prasad | 29-07-2008 | 105 days | 16-01-2009 | 22/06/2009 | 983690 | 847136 | 0 | 847136 | 420 |
| 172 | L/o of CC Road and WBM Road from 6-4-135 to 127 at Machilibazar, HNK | Rajendra Prasad | 29-07-2008 | 105 days | 16-01-2009 | 22/06/2009 | 945652 | 815275 | 0 | 815275 | 421 |
| 173 | Laying of Metal Road Chinthal W.No.7 | MSR CONSTRUCTIONS | 17-10-2008 | 60 days | 17-01-2009 | 10/06/2009 | 476000 | 373938 | 0 | 373938 | 422 |
| 174 | Construction of Section -I and II CC Drain and Laying of CC Road at Kareemabad, Warangal in Ward.No.14 | V. Yadagiri | 08-11-2009 | 60 days | 17-01-2009 | 29/09/2009 | 483992 | 430841 | 0 | 430841 | 423 |
| 175 | Laying of CC Road from H.No.1-9-957 to 1-9-1080/1 at Postal Colony Hanamkonda in Div.No.30 | M/s M/s WLCCS Ltd., Prakash Reddypet (V. Srinivas) | 09-01-2009 | 45 days | 21-01-2009 | 09/02/2009 | 243993 | 217678 | 0 | 217678 | 424 |
| 176 | Laying of RCC slab on existing box drain at H.No. 11-23-602 at LB Nagar Warangal in Ward.No.3 | DAYAKAR.G | 28-11-2008 | 30 days | 23-01-2009 | 20/11/2009 | 97552 | 87859 | 0 | 87859 | 425 |
| 177 | L/o CC road from 11-23-1997 l3 to Jyothi Balamandir School at Lb Nagar Warangal ward (2) | MSR CONSTRUCTIONS | 12-08-2008 | 60 days | 24-01-2009 | 25/04/2009 | 493522 | 430320 | 0 | 430320 | 426 |
| 178 | L/o CC Road from 11-23-1306 to 1364 and 11-23-1516 to 1509 at Lb nagar warangal ward (2) | MSR CONSTRUCTIONS | 12-08-2008 | 25 days | 24-01-2009 | 25/04/2009 | 658008 | 573540 | 0 | 573540 | 427 |
| 179 | Filling of gravel road and leveling the ground at Sahnthi Nagar in W.No.1 Warangal | DAYAKAR.G | 28-11-2008 | 45 days | 25-01-2009 | 25/11/2009 | 22676 | 18864 | 0 | 18864 | 428 |
| 180 | laying of CC Road from EP No.TBS 36 TO H.No.2-6-96 at Shanthi Nagar, Hanamkonda in division no.38 | Ch. Ramapathi Rao | 20-08-2008 | 45 days | 27-01-2009 | 11/04/2009 | 185553 | 160333 | 0 | 160333 | 429 |
| 181 | C/o of Brick Mansonary and C/o of Section I CC Drain at 15-6-2005 Static Tank Papaiahpet Wgl in Ward No.25 | S.SHIVASHANKAR | 12-02-2009 | 30 days | 27-01-2009 | 24/06/2009 | 172000 | 153745 | 0 | 153745 | 430 |
| 182 | Laying of CC Road from 5-4-107 to 5-4-33 at Bommathiwada, Hanamkonda in Ward No. 47 | MSR CONSTRUCTIONS | 30-09-2008 | 45 days | 27-01-2009 | 09/10/2009 | 168373 | 150579 | 0 | 150579 | 431 |
| 183 | Laying of WBM Road from H.No. 2-8-31/2 to 2-8-255 at Waddepally, Hanamkonda in Div.No.38 | Ch. Ramapathi Rao | 20-08-2008 | 45 days | 27-01-2009 | 26/11/2009 | 152583 | 122475 | 0 | 122475 | 432 |
| 184 | laying of cc road from H. 11-22-531 to 98 at kashibugga warangal in div no 5 | Sathyanarayana.B | 28-08-2008 | 5 days | 28-01-2009 | 25/02/2009 | 508487 | 435319 | 0 | 435319 | 433 |
| 185 | Laying of C.C. Road from Opp Kazipet SR to H.No.25-4-391 at Vishnupuri Kazipet in Ward No.35 | Kumaraswamy. B | 09-01-2009 | 30 days | 28-01-2009 | 20/03/2009 | 91854 | 81913 | 0 | 81913 | 434 |
| 186 | Gravel filling on the occassion of Bathukamma festival at bund kazipet | Kumaraswamy. B | 07-10-2008 | 30 days | 28-01-2009 | 20/03/2009 | 48850 | 40640 | 0 | 40640 | 435 |
| 187 | Laying WBM road from H.no.24-7-289 to 24-07-269 at Ramakrishna Colony Kazipet | Kumaraswamy. B | 20-08-2008 | 45 days | 28-01-2009 | 20/03/2009 | 147000 | 112236 | 0 | 112236 | 436 |
| 188 | Laying of WBM Road from Punnami Guest house to H.No.1-1-76 at Chaitanyapuri Kazipet Div.No.36. | Kumaraswamy. B | 28-07-2008 | 45 days | 28-01-2009 | 31/03/2009 | 149734 | 112623 | 0 | 112623 | 437 |
| 189 | L/O C.C ROAD CD C/O CC DRAIN FROM 25-6-225 TO 25-6-223 AND 238 AND 25-6-265 TO END OF LANE AT VIDYA NAGAR KAZIPET DIV.NO.35 | Kumaraswamy. B | 20-08-2008 | 45 days | 28-01-2009 | 23/05/2009 | 274000 | 231551 | 0 | 231551 | 439 |
| 190 | LAY OF CC ROAD FROM 1-6 -2 TO 25-6-266 AND 25-6-295 AT ARYA NAGAR KAZIPET,DIV. NO.35 | Kumaraswamy. B | 28-08-2008 | 60 days | 28-01-2009 | 23/05/2009 | 346000 | 291771 | 0 | 291771 | 440 |
| 191 | ARRESTING OF LEAVINGS IN VARIOUS OCCATION UNDER AE CIRCLE NO.I KAZIPET IN WARD NO.31 TO 36 | Kumaraswamy. B | 22-11-2008 | 30 days | 28-01-2009 | 23/05/2009 | 59287 | 54049 | 0 | 54049 | 441 |
| 192 | Laying of WBM Road from H.No.23-6-124/2 to E.P.No.HRS/8/10/S at Durga Colony, HNK | M/s. P.W.L.C.Coop.Society, Laxmipuram | 02-07-2008 | 60 days | 28-01-2009 | 15/06/2009 | 241482 | 204148 | 0 | 204148 | 442 |
| 193 | Laying of WBM Road at Bank Colony Hanamkonda | M/s. P.W.L.C.Coop.Society, Laxmipuram | 03-07-2008 | 60 days | 28-01-2009 | 15/06/2009 | 161932 | 137806 | 0 | 137806 | 443 |
| 194 | Laying of CC Road and construction of CC Drain from 25-4-445 to 534 and construction of CC Drain from 25-4-346 to Somidi Road, Kazipet in Div.No.35 | Kumaraswamy. B | 20-08-2008 | 30 days | 28-01-2009 | 28/07/2009 | 420701 | 372867 | 0 | 372867 | 444 |
| 195 | Laying of WBM Road from 25-8-686 to Pochamma Temple and 25-8-630/2 to 25-8-23/2 at Bhavani Nagar, Kazipet in Div.No.33 | Kumaraswamy. B | 20-08-2008 | 30 days | 28-01-2009 | 28/07/2009 | 220003 | 182998 | 0 | 182998 | 445 |
| 196 | Laying of WBM Road and Construction of CC Drain from H.No. 1-2-227 to 1-2-290 at Rahmath Nagar, Hanamkonda in Ward.No.36 | Kumaraswamy. B | 25-07-2008 | 45 days | 28-01-2009 | 28/07/2009 | 151686 | 129249 | 0 | 129249 | 446 |
| 197 | Laying of CC Road from 25-8-346 to 25-9-7 and 25-8-175 to 25-8-156 at Bapuji Nagar (South), Kazipet in Div.No.33 | Kumaraswamy. B | 20-08-2008 | 45 days | 28-01-2009 | 28/07/2009 | 155698 | 137599 | 0 | 137599 | 447 |
| 198 | Laying of CC road from 25-8-616/1 to 628 and 25-8-623 to 680 at Shanthinagar, Kazipet in Div.No.33 | Kumaraswamy. B | 20-08-2008 | 30 days | 28-01-2009 | 28/07/2009 | 167037 | 147143 | 0 | 147143 | 448 |
| 199 | Laying of CC Roads and Construction of CC Drains in internal lanes at Somidi, Kazipet in Ward.No.34 | Kumaraswamy. B | 03-10-2008 | 60 days | 28-01-2009 | 16/09/2009 | 244779 | 209288 | 0 | 209288 | 449 |
| 200 | Laying of CC Road and Construction of Section-I CC Drain from H.No.24-4-98 to 24-4-92 at Beem Nagar, Darga Kazipet in Div.No.31 | Kumaraswamy. B | 20-08-2008 | 30 days | 28-01-2009 | 16/09/2009 | 135912 | 114364 | 0 | 114364 | 450 |
| 201 | Laying of WBM Road and CC Road at Balasanthawada Internal Lanes Darga Kazipet in Div.No.31 | Kumaraswamy. B | 20-08-2008 | 75 days | 28-01-2009 | 16/09/2009 | 419390 | 342329 | 0 | 342329 | 451 |
| 202 | Dismantling and re-laying of RCC bed blok on suplus wear gap portion at Kapuwada side, HNK | Chandra Mohan.P | 25-02-2009 | 30 days | 28-01-2009 | 19/09/2009 | 38000 | 34382 | 0 | 34382 | 452 |
| 203 | Laying of 200 mm dia HDPE Pipe Line from Balanjaneyaswamy Temple to H.No.7-1-389, Div No.28, Hnk | Ravinder Rao A | 10-09-2007 | 30 days | 04-02-2009 | 08/05/2008 | 98308 | 87583 | 0 | 87583 | 453 |
| 204 | L/o CC Road from Poola Rangaiah Taddy Shop to Railway GAte at Kareembad Wgl | Sri Venkateshwara Constructions | 09-01-2007 | 45 days | 04-02-2009 | 17/03/2009 | 259663 | 232967 | 0 | 232967 | 454 |
| 205 | L/O OF CC ROAD GRAVEL 16-1-262 TO 373, 16-1-380 TO 386AND 17-2-291/3 AT SRR THOTA WGL | Sri Venkateshwara Constructions | 16-07-2008 | 60 days | 04-02-2009 | 31/03/2009 | 508434 | 438487 | 0 | 438487 | 455 |
| 206 | ENGAGE THE JAB ON THE BASIS IS FOR EXCAVTION AT 80'FT ROAD LIST DISMENTALED BEDSIS 80 ROAD AT LAXMI PURAM | Suresh Kumar.S | 05-12-2008 | 15 days | 04-02-2009 | 31/03/2009 | 42050 | 39321 | 0 | 39321 | 456 |
| 207 | TRANSPORTATION OF DISMENTALLED DEFRIS AND EX CULVERTS SOCIETY ON 80"ROAD AT LAXMI NAGAR | Suresh Kumar.S | 05-12-2008 | 15 days | 04-02-2009 | 31/03/2009 | 35930 | 33598 | 0 | 33598 | 457 |
| 208 | L/O CC ROAD FROM 16-3-1030/2 TO 16-3-1030/10 AT KAREEMABAD ROAD W.NO.15 | Sri Venkateshwara Constructions | 16-07-2008 | 60 days | 04-02-2009 | 06/04/2009 | 153085 | 137090 | 0 | 137090 | 458 |
| 209 | Laying of granite stone to the exesting shubhas chandrabose statue g r gutta wgl | Chandra Mohan.P | 17-07-2008 | 30 days | 04-02-2009 | 19/05/2009 | 66845 | 60939 | 0 | 60939 | 459 |
| 210 | Laying of CC. Road from 11-22-254 at Kashibugga, Wgl | Suresh Kumar.S | 04-06-2009 | 45 days | 04-02-2009 | 04/06/2009 | 407896 | 364647 | 0 | 364647 | 460 |
| 211 | Laying of CC Road from EP No. SNG 4 to 2-9-490 at Sri Nagar Colony, HNK | Ravinder Rao A | 19-01-2008 | 45 days | 04-02-2009 | 16/06/2009 | 141242 | 123126 | 0 | 123126 | 461 |
| 212 | Laying of CC Road from 22-8-192 to 144 at Ward No.53 | M. Anjaneyulu | 28-07-2008 | 60 days | 04-02-2009 | 30/06/2009 | 26200 | 23686 | 0 | 23686 | 462 |
| 213 | C/o of CC Road from H.No.10-13-345 to Weight Bridge at Laxmipuram in Ward No.22 | Komuraiah.S | 25-07-2008 | 90 days | 04-02-2009 | 06/12/2009 | 920000 | 796925 | 0 | 796925 | 464 |
| 214 | Laying of CC Road from H.No.2-9-176/2 to 2-9-166/3 at Vikas Nagar, HNK D.No.37 | Ravinder Rao A | 13-03-2008 | 45 days | 05-02-2009 | 26/05/2009 | 158498 | 138415 | 0 | 138415 | 465 |
| 215 | L/o CC Road from EPNO.SN 58 to 1-9-1182 at Sahakar Nagar Hnk Div.No.30 | Naresh Kumar.D | 20-12-2007 | 45 days | 05-02-2009 | 04/06/2009 | 295472 | 257278 | 0 | 257278 | 466 |
| 216 | L/o of CC Drain at Venkatrao Nagar, Ram Nagar | K. Raghupathi Reddy | 05-10-2008 | 30 days | 05-02-2009 | 14/07/2009 | 100000 | 98526 | 0 | 98526 | 467 |
| 217 | Laying of 140mm dia HDPE pipeline from 3-8-95 to EPNO.4 at Kumarpally near Mandivada, Hnk in Div.No.47 | Govardhan Reddy.G | 15-10-2008 | 45 days | 05-02-2009 | 24/09/2009 | 166297 | 151871 | 0 | 151871 | 469 |
| 218 | Construction of 900mm box drain from H.No.2-1-25 to Sammaiah Nagar, cause way to Saraswathi Nagar HNK in W.NO.42 | Chandra Mohan.P | 01-09-2008 | 75 days | 05-02-2009 | 26/09/2009 | 490657 | 435896 | 0 | 435896 | 470 |
| 219 | Construction of Section -II CC Drain from Bhavani Tent House to H.No.16-3-874 at Khammam Road Warangal inWArd.No.15 | Ajay Dalitha LCCS Warangal | 08-11-2008 | 45 days | 05-02-2009 | 20/11/2009 | 360432 | 322252 | 0 | 322252 | 471 |
| 220 | L/o 200mm dia HDPE Pipe line at Div.No.28 | Chandra Mohan.P | -09-2008 | 75 days | 05-02-2009 | 20/11/2009 | 573485 | 508020 | 0 | 508020 | 472 |
| 221 | blindage to existing gurbage at rangaleela maidanam dasara festival kareemabad | Sadanandam. B | 18-09-2008 | 30 days | 07-02-2009 | 18/04/2009 | 78065 | 98065 | 0 | 98065 | 473 |
| 222 | leveling teh ravane vadha plot from rangaleela maidan kareema bad | Sadanandam. B | 18-09-2008 | 30 days | 07-02-2009 | 18/04/2009 | 84632 | 66668 | 0 | 66668 | 474 |
| 223 | Building for existing WBM Road at Dasara Festival | Sadanandam. B | 18-09-2008 | 30 days | 07-02-2009 | 05/06/2009 | 64280 | 53477 | 0 | 53477 | 475 |
| 224 | Repairs to existing drains at H.No.17-3-51/2 and at other places at Kareemabad, Warangal in W.No.12 | G.Sreedhar | 16-10-2008 | 30 days | 08-02-2009 | 20/11/2009 | 78462 | 69846 | 0 | 69846 | 476 |
| 225 | Arrestings leakages on 6 dia to 24 dia pipe linein various locations in Ward (W.No.43) (45) to (49) AE Circle IV HNK | Venkateshwarlu. Ch | 25-09-2008 | 30 days | 13-02-2009 | 04/05/2009 | 98370 | 89679 | 0 | 89679 | 478 |
| 226 | C/O COMPOUND WALL AT MUSLIM GIRLS HOSTAL AT BOKKALAGADDA LASKHAR BAZAR HNK WARD NO 45 | Suresh Kumar.S | 24-01-2009 | 30 days | 14-02-2009 | 06/04/2009 | 249548 | 221599 | 0 | 221599 | 479 |
| 227 | Arresting of leakages on 6 dia to 24 dia pipeline in varous location in Ward No.43,45 to 49 AE Circle HNK | Venkateshwarlu. Ch | 16-09-2008 | 30 days | 14-02-2009 | 04/05/2009 | 98879 | 90146 | 0 | 90146 | 480 |
| 228 | Supply of Msclomp sets and improvement of H2o Supply etc in HNK Area | Venkateshwarlu. Ch | 30-12-2008 | 15 days | 16-02-2009 | 18/04/2009 | 58966 | 53756 | 0 | 53756 | 481 |
| 229 | Laying of Cc Road patches from WMC complex to susheela devi school 8/8/12,8/9/12 SRW 24 at Axis bank and EM Dress to JPRN 55/11 JPN 8/55 ED 14/5/1 and SBI to SRN 33/PV 8/4/86 8/4/96 in Div.No.21 | Ravi kumar.P | 30-08-2008 | 30 days | 17-02-2009 | 15/09/2009 | 657500 | 574289 | 0 | 574289 | 482 |
| 230 | Formation of Gravel Road at Jyothi Colony, Warangal in Ward No.18 | M/S SAI KRUPA ENTERPRISES | 26-09-2008 | 15 days | 18-02-2009 | 19/10/2009 | 47255 | 39578 | 0 | 39578 | 484 |
| 231 | Laying of Gravel Road from 19-9-317 to 19-9-346/C at Nagendra Nagar, Warangal in Ward.No.11 | Srinivas. B | 17-09-2008 | 30 days | 18-02-2009 | 20/11/2009 | 102368 | 85686 | 0 | 85686 | 485 |
| 232 | Construction of Section I Drain from 2-12-65 to Ramaiah Plot and 2-12-63 to 2-12-64 at Vayuputra Colony, Hanamkonda in Ward.No.43 | M/S SAI KRUPA ENTERPRISES | 17-09-2008 | 30 days | 20-02-2009 | 17/11/2009 | 94640 | 83038 | 0 | 83038 | 486 |
| 233 | Laying of CC Road from Main Road to End of the Lane at Puppalagutta, Wgl W.No.7 | M/S SAI KRUPA ENTERPRISES | 17-02-2009 | 30 days | 21-02-2009 | 07/02/2009 | 161933 | 144293 | 0 | 144293 | 487 |
| 234 | Restoration of Existing Damaged Drains by construction of CC Drains at Ursu, Prathapa Nagar, W.No.12 | M/S SAI KRUPA ENTERPRISES | 25-02-2009 | 30 days | 21-02-2009 | 07/02/2009 | 97233 | 86946 | 0 | 86946 | 488 |
| 235 | Construction of RCC Stair Case at Camp Office, Public Garden, HNK | Srinivas. B | 10-11-2008 | 30 days | 21-02-2009 | 14/03/2009 | 99750 | 90680 | 0 | 90680 | 489 |
| 236 | Appling of Potty inside of rooms of Commissioner Residence at Camp Office, Public Garden, HNK | Srinivas. B | 24-10-2008 | 30 days | 21-02-2009 | 14/05/2009 | 99844 | 91204 | 0 | 91204 | 490 |
| 237 | Filling of Big Pot holes and side berms with hard gravel from Govt. Junior College Junction to bus stand Jonc due to CM Programme | Srinivas. B | 13-08-2008 | 30 days | 21-02-2009 | 14/05/2009 | 89902 | 75296 | 0 | 75296 | 491 |
| 238 | Providing of pointing commissioner quarters situated at Public Garden HNK | Srinivas. B | 20-12-2008 | 30 days | 21-02-2009 | 08/06/2009 | 99620 | 91000 | 0 | 91000 | 492 |
| 239 | laying of cc road from EP.No SRT 7/11/2 to 17/2/336/1 jyothi nagar warangal ward no 18 | Sri Venkateshwara Constructions | 19-01-2009 | 45 days | 23-02-2009 | 06/04/2009 | 204508 | 183221 | 0 | 183221 | 494 |
| 240 | C/o of CC Road from H.No.11-28-241/1/1 to 272 at Thummalakunta, Ward No.53 | Sri Venkateshwara Constructions | 19-01-2009 | 60 days | 25-02-2009 | 20/01/2009 | 520000 | 471614 | 0 | 471614 | 495 |
| 241 | C/o CC Drain from H.No. 2-4-1535 to EP No. ASC 15 at Ashok Colony HNK in Div. (41) | Srinvias P | 17-02-2009 | 15 days | 26-02-2009 | 27/02/2009 | 225983 | 198281 | 0 | 198281 | 496 |
| 242 | Laying of C.C Road at Tejaswi School at Naimnagar, HNK in Ward No.44 | Srinvias P | 17-02-2009 | 30 days | 26-02-2009 | 28/02/2009 | 55992 | 49960 | 0 | 49960 | 497 |
| 243 | Construction of 300mm size drain from H.No.11-28-260 to FBC 55 and 22-8-210 to 276 and internal lanes at Thummalakunta and Mainarity Colony, Warangal in W.No.53 | Sanjeev. G | 19-01-2009 | 60 days | 26-02-2009 | 08/04/2009 | 414848 | 366693 | 0 | 366693 | 498 |
| 244 | C/o 300 mm size drain from H.No. 11-30-58 to 11-30-64 and 11-28-233/B at thumalakunta, Warangal in w.No.53 | Sri Venkateshwara Constructions | 03-02-2009 | 30 days | 26-02-2009 | 08/04/2009 | 90000 | 79633 | 0 | 79633 | 499 |
| 245 | GRAVELFORMATION AND LAYING OF 450 PIPES AT VIDYANAGAR HNK | Chandra Mohan.P | 18-10-2008 | 30 days | 26-02-2009 | 21/04/2009 | 62868 | 52617 | 0 | 52617 | 500 |
| 246 | GRAVEL FORMATION L2J OF CROSS PIPES FROM 80`ROAD VIJAYACOLONY AT HNK | Chandra Mohan.P | 18-10-2008 | 30 days | 26-02-2009 | 21/04/2009 | 44310 | 38875 | 0 | 38875 | 501 |
| 247 | providing of blindage to damaged approch roads to rangaleela maidanam kareema bad warangal | Sadanandam. B | 18-09-2008 | 15 days | 26-02-2009 | 01/05/2009 | 60000 | 50680 | 0 | 50680 | 502 |
| 248 | LAYING OF CC ROAD 16-6-94 TO 16-5-67 AT PERUKAWADA | Chandra Mohan.P | 30-11-2008 | 30 days | 26-02-2009 | 02/05/2009 | 99341 | 89029 | 0 | 89029 | 503 |
| 249 | LAYING OC CC ROAD 16-6-193 TO EPPKW2AT PERUKAWADA WGL | Chandra Mohan.P | 09-12-2008 | 30 days | 26-02-2009 | 02/05/2009 | 102449 | 91259 | 0 | 91259 | 504 |
| 250 | Laying of CC Road from 16-6-195 to Opp: Masjid at Perukawada, Wgl W.No.17 | Chandra Mohan.P | 08-12-2008 | 30 days | 26-02-2009 | 02/05/2009 | 101466 | 90752 | 0 | 90752 | 505 |
| 251 | Laying of CC Road from 16-6-185 to 16-5-83 at Perukawada, W.No.17 | Chandra Mohan.P | 09-12-2008 | 30 days | 26-02-2009 | 02/05/2009 | 101487 | 90868 | 0 | 90868 | 506 |
| 252 | Supply and filling of Sand at Childrens park equipments in Public Garden, Hnk in ward no 46 | Venkateshwarlu. Ch | 17-02-2009 | 30 days | 26-02-2009 | 08/05/2009 | 69069 | 56557 | 0 | 56557 | 507 |
| 253 | s & d of doors at beside wmc wgl | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/05/2009 | 101976 | 93148 | 0 | 93148 | 508 |
| 254 | interpainting to the to the newly sheeds at wmc | Chandra Mohan.P | 30-12-2008 | 15 days | 26-02-2009 | 11/05/2009 | 44609 | 40747 | 0 | 40747 | 509 |
| 255 | contruction ceramic tiles fooling in rooms at wmc | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/05/2009 | 95325 | 87296 | 0 | 87296 | 510 |
| 256 | scd of windows at nely proposed sheds at wmc | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/05/2009 | 90420 | 85735 | 0 | 85735 | 511 |
| 257 | contruction 110mm hdpe pipe line 14-7-72 WP34/1/2 to 14-7-65 to 14-7-62 at Nizarpuram.wgl | Chandra Mohan.P | 01-01-2009 | 30 days | 26-02-2009 | 11/05/2009 | 45291 | 41369 | 0 | 41369 | 512 |
| 258 | contructionof RRmasom & G/Gat newly constration wmc | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/05/2009 | 103506 | 89697 | 0 | 89697 | 513 |
| 259 | contructioncbs in rooms and dobby at new construction at wmc | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/05/2009 | 94477 | 87327 | 0 | 87327 | 514 |
| 260 | Shiftting Modifications to colouring and replacement of Gandhi Statue Perukawada | Chandra Mohan.P | 21-01-2009 | 30 days | 26-02-2009 | 18/05/2009 | 103314 | 92698 | 0 | 92698 | 515 |
| 261 | contruction of parking tiles to subash statue junctionat govindrajula gutta wgl | Chandra Mohan.P | 03-01-2009 | 30 days | 26-02-2009 | 19/05/2009 | 89723 | 81367 | 0 | 81367 | 516 |
| 262 | D/o of 75 mm HDPE Pipe Line from H.No.25-11-27 Community Hall Bapuji Nagar, Kzpt | Chandra Mohan.P | 09-09-2008 | 30 days | 26-02-2009 | 19/05/2009 | 35358 | 32297 | 0 | 32297 | 517 |
| 263 | Construction of C.c. Road from H.No.1-9-992 to E.P.No.PCS13/11, 1-9-1016 at postal colony, Hnk, Div.No.36 | Laxmi Narayana.D | 18-08-2008 | 75 days | 26-02-2009 | 02/06/2009 | 552135 | 481694 | 0 | 481694 | 518 |
| 264 | Constructionof CC Road from H.No.1-7-124 to 1-7-117, 1-7-95 to 1-7-85 at Widows Colony, HNK Div No.29 | Laxmi Narayana.D | 12-02-2008 | 45 days | 26-02-2009 | 02/06/2009 | 247952 | 222108 | 0 | 222108 | 519 |
| 265 | Construction of Section - I and II C.C. Drain from Static Tank to Maternity at ST area, Warangal Ward No.9 | Laxmi Narayana.D | 12-02-2008 | 60 days | 26-02-2009 | 02/06/2009 | 501229 | 437821 | 0 | 437821 | 520 |
| 266 | Laying of CC Road from 2-7-485 to Opp: 2-7-1246 at Excise Colony, HNK D.No.39 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 22-10-2008 | 60 days | 26-02-2009 | 30/06/2009 | 260310 | 227670 | 0 | 227670 | 522 |
| 267 | Laying of CC patch work from H.No 6-2-329 to H.No NBH 16 at New Bus stand Road, and Govt. Junior College Road,Hnk Ward No.46 | Venkateshwarlu. Ch | 17-02-2009 | 30 days | 26-02-2009 | 07/08/2009 | 82660 | 73586 | 0 | 73586 | 523 |
| 268 | Formation of Gravel Road at Muslim Grave Yard, Khammam Road, Warangal in Ward.No. 15 | Chandra Mohan.P | 17-09-2008 | 30 days | 26-02-2009 | 17/09/2009 | 90447 | 75742 | 0 | 75742 | 525 |
| 269 | Laying of 110mm dia HDPE pipe line from EP No. KN 55 II 5/8 to H.No. 5-11-47/3 at Jagruthi Colony Hanamkonda in Ward No.44 | Chandra Mohan.P | 17-09-2008 | 30 days | 26-02-2009 | 17/09/2009 | 43298 | 39536 | 0 | 39536 | 526 |
| 270 | Construction of Sec-I Drain from 2-4-1312 to 1321 at Gandhi Nagar, Hanamkonda in Ward.No.41 | Chandra Mohan.P | 06-09-2008 | 30 days | 26-02-2009 | 19/09/2009 | 102565 | 91876 | 0 | 91876 | 527 |
| 271 | Laying of CC Road from H.No.2-6-1248 to
2-6-1198 on subedari police station to St. peter's school Road, Hanamkonda in Ward No.38 | M/s Waddera Labour Contract Co-operative Society, Rampur. | 07-04-2008 | 90 days | 26-02-2009 | 22/09/2009 | 1040060 | 932424 | 0 | 932424 | 528 |
| 272 | Laying of WBM Road from H.No. 22-7-1 to 66 and 22-7-75 to Temple at Doctor's Colony Phase-II, Warangal In.Ward.No.53 | Sanjeev. G | 19-01-2009 | 60 days | 26-02-2009 | 29/09/2009 | 477591 | 381607 | 0 | 381607 | 529 |
| 273 | Cleaning of filteration sump wall and servicing sluice walls and spanners at filterbed at KUC,Hnk under AE Cirlce- IV | Venkateshwarlu. Ch | 25-09-2008 | 30 days | 26-02-2009 | 08/10/2009 | 84668 | 77186 | 0 | 77186 | 530 |
| 274 | Repirs to Drains at Shiva Nagar, Warangal in Ward.No. 16 | Sri Venkateshwara Constructions | 11-11-2008 | 30 days | 26-02-2009 | 30/10/2009 | 49973 | 44760 | 0 | 44760 | 532 |
| 275 | Repairs to Drains at SRR Thota, Warangal in Ward No. 18 | Sri Venkateshwara Constructions | 17-02-2009 | 30 days | 26-02-2009 | 30/10/2009 | 50000 | 44716 | 0 | 44716 | 533 |
| 276 | Laying of 110mm dia HDPE pipes KUDA Gate to Bus Stand Road and Construction of Section-II Drain from JNS Compound to Busstand Road Hanamkonda in Ward.No.46 | G. Sathyanarayana | 12-12-2009 | 30 days | 26-02-2009 | 16/11/2009 | 98357 | 88295 | 0 | 88295 | 534 |
| 277 | Construction of Section-I CC Drain from 19-10-209 to 19-10-203 at Gavicherla Road Shambunipet Warangal in Ward.No.10 | Mandala Suresh | 17-09-2009 | 30 days | 26-02-2009 | 19/11/2009 | 92576 | 86145 | 0 | 86145 | 535 |
| 278 | Laying of 110mm dia HDPipe at West fort Warangal | Suresh Kumar.S | 25-02-2009 | 30 days | 27-02-2009 | 28/05/2008 | 101655 | 92855 | 0 | 92855 | 536 |
| 279 | Laying of CC Road from 22-8-22 to 22-8-72 Doctors Colony - II Wgl W.No.53 | Niranjan .V | 01-12-2009 | 60 days | 27-02-2009 | 31/10/2008 | 498669 | 404151 | 0 | 404151 | 537 |
| 280 | Formation of Gravel Road at Shiva Nagar Sub Station, Shivanagar, Wgl W.No.17 | G.Sreedhar | 22-09-2008 | 30 days | 27-02-2009 | 07/04/2009 | 44660 | 36996 | 0 | 36996 | 538 |
| 281 | LEVELLING OF ROAD WITH GRAVEL FOR DAMAGED PORTION FROM 11-28-270 TO 275 & 11-30-472 TO 11-28-289 AT THUMMALAKUNTA WGL | G.Sreedhar | 22-08-2008 | 30 days | 27-02-2009 | 13/04/2009 | 43000 | 35657 | 0 | 35657 | 539 |
| 282 | leveling the road gravel for damage portion from 22-8-152 at weavers colony | G.Sreedhar | 28-08-2008 | 30 days | 27-02-2009 | 13/04/2009 | 47500 | 39304 | 0 | 39304 | 540 |
| 283 | desilting of emisting cc drain vent 16-4-1517 to at shivanagar | Chandra Mohan.P | 07-09-2008 | 15 days | 27-02-2009 | 18/04/2009 | 73000 | 68397 | 0 | 68397 | 541 |
| 284 | Formation of Gravel roads at Lenin Nagar Wgl Ward No. 10 | GORRE AMARNATH | 28-01-2009 | 45 days | 27-02-2009 | 05/05/2009 | 199723 | 150746 | 0 | 150746 | 542 |
| 285 | Laying of CC Road from 20-12-177 to Gold Smith Hall at Mudirajwada, East Fort, Warangal in Ward NO. 9 | S.SHIVASHANKAR | 17-02-2009 | 45 days | 27-02-2009 | 10/06/2009 | 167391 | 149995 | 0 | 149995 | 545 |
| 286 | Laying of 110mm dia HDPE pipe line from H.no. 20-8-99 to 20-9-109 at West Fort, Warangal in Ward.No. 8 | Suresh Kumar.S | 29-02-2009 | 30 days | 27-02-2009 | 10/06/2009 | 99666 | 90055 | 0 | 90055 | 546 |
| 287 | Formation of Gravel Road from 2-8-573/1/3 to Opp:2-8-682 at Bhavani Nagar, HNK in Div.No.38 | Sampath Rao.K | 25-03-2008 | 45 days | 27-02-2009 | 12/06/2009 | 193861 | 138586 | 0 | 138586 | 547 |
| 288 | L/o CC road from H.No 2-10-755/2 on opp H.NO. 2-10-933 at teacher Colony Hnk | M/s. P.W.L.C.Coop.Society, Laxmipuram | 18-01-2009 | 60 days | 27-02-2009 | 15/06/2009 | 324387 | 289210 | 0 | 289210 | 548 |
| 289 | Construction of CC Drain from 5-11-14 to 5-11-32/1 at Jagruthicolony, HNK W.No.44 | Ravi kumar.P | 30-07-2008 | 30 days | 27-02-2009 | 23/06/2009 | 72000 | 64420 | 0 | 64420 | 549 |
| 290 | Formation of Gravel Road and Filling for Bathukamma and Dasara Festival at Bestham Chruvu, Rangasaipet, Warangal in Ward No.11 | Ravi kumar.P | 18-09-2008 | 15 days | 27-02-2009 | 13/07/2009 | 29922 | 24894 | 0 | 24894 | 551 |
| 291 | Arresting of Leakages in AE Circle -I Area Warangal | Govardhan Reddy.G | 27-01-2009 | 30 days | 27-02-2009 | 21/08/2009 | 74896 | 70150 | 0 | 70150 | 552 |
| 292 | Construcytion of CC drain from H.No. 11-23-762 to 11-23-784 at LB Nagar Warangal in Ward.No.03 | M/s. ASHOKA DALITHA CIVIL AND SANITATION LCWM C & S LTD., | 15-12-2008 | 60 days | 27-02-2009 | 14/09/2009 | 462487 | 415238 | 0 | 415238 | 553 |
| 293 | Layig of WBM Road at Santoshimatha Colony & Sai Nagar Colony at Hunter Road, Wgl. | Laxmi Narayana.D | 15-10-2008 | 90 days | 27-02-2009 | 19/09/2009 | 837302 | 667052 | 0 | 667052 | 554 |
| 294 | Construction of compound wall to Burrial ground located at Kashibugga society colony, warangal in ward.no.04 | Preethi Const. | 29-07-2008 | 90 days | 27-02-2009 | 24/09/2009 | 970000 | 860323 | 0 | 860323 | 556 |
| 295 | Constructionof Section -I Cc Drain at Chintal and Puppalagutta, Warangal in Ward. No.07 | Preethi Const. | 20-08-2008 | 75 days | 27-02-2009 | 29/09/2009 | 503284 | 442954 | 0 | 442954 | 557 |
| 296 | Laying of CC Road from 01-07-253 to 1-7-328 at Pragathi Nagar Revenue Colony, Hanamkonda | Rajendra Prasad | 07-08-2008 | 90 days | 27-02-2009 | 29/09/2009 | 497716 | 434617 | 0 | 434617 | 558 |
| 297 | Laying of CC Road in Teachers Colony Ph-II Hnk in W.No. 37 | Kumaraswamy. B | 27-02-2009 | 30 days | 27-02-2009 | 20/11/2009 | 149113 | 133345 | 0 | 133345 | 559 |
| 298 | Laying of WBM road from 24-4-32 to 24-4-43 and 24-4-59 and L/o of CC Road 24-4-73 to 24-4-63 Ambedhakar Nagar Kazipet Ward No. 31 | Kumaraswamy. B | 27-02-2009 | 30 days | 27-02-2009 | 20/11/2009 | 102550 | 86661 | 0 | 86661 | 560 |
| 299 | Construction of 900mm vent CC Drain from Burial Ground to Ep.No.12at Pochammakunta Hanamkonda in Ward.No.44 | Manohar.M | 13-08-2008 | 90 days | 27-02-2009 | 23/11/2009 | 957697 | 803900 | 0 | 803900 | 562 |
| 300 | Formation of gravel road at abbanikunta, Warangal | Suresh Kumar.S | 17-01-2008 | 15 days | 28-02-2009 | 04/06/2008 | 58901 | 48996 | 0 | 48996 | 563 |
| 301 | Laying of C.C. Road from E.P.No.WPR 13/8 to H.No.2-7-1167/2 at Kanakadurga Colony | Rajendra Prasad | 07-11-2009 | 30 days | 28-02-2009 | 23/04/2009 | 47317 | 42093 | 0 | 42093 | 564 |
| 302 | Laying of CC Road from 2-9-896 to EP No. NGO C16/6, 2-9-904 to 2-9-907 at Indiranagar, Waddepally, HNK Div No.37 | Rajendra Prasad | 09-01-2009 | 60 days | 28-02-2009 | 27/04/2009 | 193253 | 168287 | 0 | 168287 | 565 |
| 303 | Laying of WBM Road from 2-8-445/3 to EP No. WPR 21/12, 2-8-455/4 to 2-8-464/5 at Vijayapal Colony, HNK in Div.No.38 | Sampath Rao.K | 15-02-2008 | 60 days | 28-02-2009 | 12/06/2009 | 495286 | 396263 | 0 | 396263 | 566 |
| 304 | C/o CC Drain from 11-23-630 to 621 at L.B.Nagar, Warangal In Ward No. 03 | M/s ADLCMA CO-Op society. | 15-12-2008 | 30 days | 28-02-2009 | 11/09/2009 | 129632 | 114131 | 0 | 114131 | 567 |
| 305 | Laying of CC Road from EP N. RCR 31/1 to EP No. NNS 515 at Pragathi Nagar, Hanamkonda in Div no.29 | M/s Sri Venkateshwara Drillers Civil Contractor | 27-02-2009 | 90 days | 28-02-2009 | 15/09/2009 | 555598 | 491554 | 0 | 491554 | 568 |
| 306 | Formation of Gravel Road at H.No.12-8-75 to 12-8-110 and 12-8-285/1 to Road End at Santhoshimatha Nagar Colony Hunter Road, Warangal in Ward.No.19 | M/s ADLCMA CO-Op society. | 29-01-2009 | 45 days | 28-02-2009 | 19/09/2009 | 272469 | 227230 | 0 | 227230 | 569 |
| 307 | construction of CC Drain from 11-23-244 to 11-23-271 at L.B. Nagar, in Ward no. 3 | M/s ADLCMA CO-Op society. | 15-12-2008 | 60 days | 28-02-2009 | 19/09/2009 | 408757 | 355313 | 0 | 355313 | 570 |
| 308 | Laying of CC Patches in Shivanagar. | GORRE AMARNATH | 18-09-2008 | 45 days | 02-03-2009 | 06/02/2009 | 197771 | 176429 | 0 | 176429 | 573 |
| 309 | Construction of Slab Culvert at H.No.22-8-276 at Mangalivagu at Mainarity Colony, Wgl (Balance Work) | MSR CONSTRUCTIONS | 02-02-2009 | 60 days | 02-03-2009 | 22/03/2009 | 419157 | 378491 | 0 | 378491 | 574 |
| 310 | 40 CC Road from 2-5-131 to 2-5-904 behind Nakkalagutta Tank hnk Div.NO.40 | Naresh Kumar.D | 30-07-2008 | 60 days | 02-03-2009 | 04/06/2009 | 209463 | 184052 | 0 | 184052 | 575 |
| 311 | C/o CC Road from Hno.2-5-489 to 2-5-499 at Choti Majeed area hnk in w.no.40 | Naresh Kumar.D | 29-07-2008 | 60 days | 02-03-2009 | 04/06/2009 | 355698 | 311180 | 0 | 311180 | 576 |
| 312 | Laying of Metal Road Durga Colony W.No.28 | MSR CONSTRUCTIONS | 12-08-2008 | 60 days | 02-03-2009 | 10/08/2009 | 350000 | 291931 | 0 | 291931 | 577 |
| 313 | Laying of 110mm dia HDPE pipe line from 16-4-320 to 16-4-324 and 16-4-331 ato 16-4-330 at East Fort Road, Warangal in Ward No.16 | Govardhan Reddy.G | 16-12-2008 | 30 days | 02-03-2009 | 26/08/2009 | 53316 | 48605 | 0 | 48605 | 578 |
| 314 | Laying of Distribution Pipe line and inter connections in various places in Ward.No.4 Warangal | Govardhan Reddy.G | 27-01-2009 | 15 days | 02-03-2009 | 26/08/2009 | 59971 | 54672 | 0 | 54672 | 579 |
| 315 | Filling and Gravel for levelling theGround inside the Moulali School at LB Nagar, Warangal in Ward No.2 | SAMMA RAO .M | 01-12-208 | 30 days | 02-03-2009 | 28/08/2009 | 44158 | 36737 | 0 | 36737 | 580 |
| 316 | Proposed inter connection at PP NO. PMW 1 Telephone Bhavan Pochamma Maidan Wgl. | Govardhan Reddy.G | 06-12-2008 | 15 days | 02-03-2009 | 11/09/2009 | 48500 | 44201 | 0 | 44201 | 581 |
| 317 | Laying of WBM Road from H.No. 5-11-550 to H.No.5-11-572 at Municipal open place Premnagar Colony HNK in W.No.44 | Srinvias P | 12-07-2008 | 30 days | 02-03-2009 | 15/09/2009 | 140529 | 119397 | 0 | 119397 | 582 |
| 318 | Laying of CC Road from H.No.5-11-402 to CVRN 16/2 at Premnagar Colony Hanamkonda in W.No.4 | Srinvias P | 05-11-2007 | 45 days | 02-03-2009 | 15/09/2009 | 222313 | 199592 | 0 | 199592 | 583 |
| 319 | Laying of CC road from H.No. 5-11-1323/2 to HNH 7/4/1 at Pochammakunta Hanamkonda in Ward No. 44 | Srinvias P | 28-11-2008 | 60 days | 02-03-2009 | 15/09/2009 | 374255 | 332784 | 0 | 332784 | 584 |
| 320 | Laying of CC Road from EP No. HRS 58/1 to H.NO.23-6-76/3 at Hunter Road HNK Div.No.28 | Srinvias P | 24-11-2008 | 60 days | 02-03-2009 | 15/09/2009 | 584744 | 517822 | 0 | 517822 | 585 |
| 321 | Laying of WBM Road From 5-11-959 to EP No. PPN1 and construction of CC Drain from 5-11-916 to EP.No. PPXN 1 at Pochammakunta, Hanamkonda in Ward.No.44 | Laxmi Narayana.D | 15-10-2008 | 45 days | 02-03-2009 | 19/09/2009 | 184801 | 174903 | 0 | 174903 | 586 |
| 322 | Laying of CC Road from 2-4-1463 to 1472 at Ashok Colony, Hanamkonda in Ward.No.41 | Rajendra Prasad | 06-09-2008 | 75 days | 02-03-2009 | 25/09/2009 | 412100 | 353360 | 0 | 353360 | 587 |
| 323 | Laying of CC Road from 2-4-444 to 2-4-835/2 at Ram Nagar, Hanamkonda in Ward No.41 | Rajendra Prasad | 28-08-2008 | 60 days | 02-03-2009 | 25/09/2009 | 154746 | 133397 | 0 | 133397 | 588 |
| 324 | Laying of CC Road from EP No.WPR 10/4 TO H.NO: 2-7-1058 at Kanakadurga Colony, Hnk in div. no. 39 | Rajendra Prasad | 08-07-2008 | 45 days | 02-03-2009 | 29/09/2009 | 139995 | 121515 | 0 | 121515 | 589 |
| 325 | Laying of CC Road from 2-6-1018 to -6-1016 at KLN Reddy Colony, Hanamkonda in Ward no. 38 | Rajendra Prasad | 20-08-2009 | 45 days | 02-03-2009 | 29/09/2009 | 290945 | 254125 | 0 | 254125 | 590 |
| 326 | Formation of Gravel Road and Filling of Bathukamma and Dasara Festival at Chintal Warangal in Div.No.7 | Srinivas. B | 22-09-2008 | 15 days | 02-03-2009 | 09/11/2009 | 53597 | 44590 | 0 | 44590 | 591 |
| 327 | Construction of CC drains at Widows Colony, Hanamkonda in Div.No.29 | Shiva Constn. | 26-09-2007 | 60 days | 02-03-2009 | 20/11/2009 | 460555 | 346086 | 0 | 346086 | 592 |
| 328 | Construction of Sec-II CC Drain from Venkata Sai Bakery to Opp: EP.No. SWH 2 and opp. 5-8-116 to 5-8-125 at Kishanpura, Hanamkonda in Ward .No. 46 | Laxmi Narayana.D | 18-10-2008 | 45 days | 02-03-2009 | 21/11/2009 | 167438 | 145466 | 0 | 145466 | 593 |
| 329 | Construction of 380mm size drain from 3-1-481 to 3-1-494 at Rayapura Hanamkonda in Ward.No.50 | Laxmi Narayana.D | 26-10-2008 | 30 days | 02-03-2009 | 21/11/2009 | 109810 | 94782 | 0 | 94782 | 594 |
| 330 | Laying of CC Road from EP No. TBS 27/A/2 to 2-6-47/1 at Shanthi Nagar, Hanamkonda in Ward.No.38 | Laxmi Narayana.D | 20-08-2008 | 30 days | 02-03-2009 | 23/11/2009 | 145000 | 129546 | 0 | 129546 | 595 |
| 331 | Laying of CC Road from EP No. NNS 9/1 to H.No.1-9-307 at Nagendra Nagar, Hanamkonda in Div.No. 30 | Laxmi Narayana.D | 14-08-2008 | 45 days | 02-03-2009 | 23/11/2009 | 143290 | 124701 | 0 | 124701 | 596 |
| 332 | Laing of CC Road from H.No. 1-9-376 to 1-9-378 at Julywada, Hanamkonda inDiv.No.30 | Laxmi Narayana.D | 18-08-2008 | 30 days | 02-03-2009 | 23/11/2009 | 131705 | 113533 | 0 | 113533 | 597 |
| 333 | Construction of CC Drain from St. Peters Pharmacy College to 80"ft Road at Vidya Nagar, Hanamkonda in W.No.41 | Laxmi Narayana.D | 17-09-2008 | 30 days | 02-03-2009 | 24/11/2009 | 106997 | 101310 | 0 | 101310 | 598 |
| 334 | Laying of CC Road and construction of Section-I CC Drain from 3-10-178 to 3-10-180 and 3-10-165 to EP.No.RCH 3/1 at Reddy colony, Hanamkonda in Ward.No. 48 | Laxmi Narayana.D | 17-09-2008 | 60 days | 02-03-2009 | 24/11/2009 | 414265 | 369943 | 0 | 369943 | 599 |
| 335 | Laying of WBM Road from 19-9-335 to 19-12-19/5 at Kashikunta, Warangal in Ward.No.11 | K.Murali Krishna | 12-08-2008 | 30 days | 03-03-2009 | 21/08/2009 | 96705 | 80937 | 0 | 80937 | 602 |
| 336 | C/o CC Drain from H.No.1-8-80 to H.No.7-1-48 at Balasamudram HNK | Chandra Mohan.P | 03-07-2009 | 30 days | 03-03-2009 | 16/10/2009 | 84422 | 75977 | 0 | 75977 | 603 |
| 337 | Laying of 110mm dia HDPE pipe line from Existing pipe line to Jyothi Bala Mandir High School at LB Nagar, Warangal in Ward.NO.2 | Suresh Kumar.S | 19-01-2009 | 30 days | 09-03-2009 | 10/06/2009 | 85000 | 77449 | 0 | 77449 | 604 |
| 338 | L/o of CC Road from 3-14-411 to 3-14-399 at Durga Colony, Hanmkonda in Div.No.43 | Laxmi Narayana.D | 30-02-2008 | 45 days | 14-03-2009 | 23/11/2009 | 318642 | 277766 | 0 | 277766 | 605 |
| 339 | LAYING OF BM ROAD FROM H.NO 1-7-322 /1 TO 1-7-328 AT PRAGATHI NAGAR ROAD NO 3 DIV NO 29 | VCR ASSOCIATES | 23-02-2007 | 30 days | 21-03-2009 | 25/11/2008 | 224110 | 162277 | 0 | 162277 | 606 |
| 340 | Laying of CC Road from H.No.2-11-541 to 2-11-514/1 at Vidyaranyapuri, HNk in Ward No.43 | Naresh Kumar.D | 22-07-2008 | 60 days | 22-03-2009 | 04/06/2009 | 414960 | 365088 | 0 | 365088 | 607 |
| 341 | Supply and fixing of Water supply arrangement in Ward No.45 | Suresh Kumar.S | 14-02-2009 | 30 days | 25-03-2009 | 30/05/2009 | 139200 | 126852 | 0 | 126852 | 608 |
| 342 | Laying of CC Road and construction of CC Drain from 3-9-86 to 3-9-93 and 3-9-96/6 at Reddy Colony Hanamkonda | Laxmi Narayana.D | 06-01-2009 | 75 days | 05-04-2009 | 29/11/2009 | 334334 | 299028 | 0 | 299028 | 609 |
| 343 | Laying of cc Road at Bhavani Nagar Kazipet Ward.No.33 | Kumaraswamy. B | 12-02-2009 | 75 days | 10-04-2009 | 16/09/2009 | 546998 | 455127 | 0 | 455127 | 610 |
| 344 | Construction of CC Drain from H.No. 2-8-421 to 425, 2-8-377/A-1 to 048 at Raghavendranagar HNK | A. Ramesh | 17-02-2009 | 30 days | 19-04-2009 | 16/09/2009 | 199367 | 169112 | 0 | 169112 | 611 |
| 345 | L/o of CC Road from EP No. RCH 85/31 to 3-9-219/1 at Reddy Colony, Hanamkonda in W.No.48 | Laxmi Narayana.D | 06-01-2008 | 45 days | 25-04-2009 | 29/11/2009 | 427552 | 390317 | 0 | 390317 | 612 |
| 346 | Laying of CC Road at Bhavani Nagar Kazipet | Kumaraswamy. B | 13-03-2009 | 60 days | 19-05-2009 | 16/09/2009 | 555625 | 452355 | 0 | 452355 | 613 |
| 347 | Removal of Dharmasagar tank wear teaked sluice concal valve with the help of sinkess | Kumaraswamy. B | 19-05-2009 | 30 days | 29-05-2009 | 28/07/2009 | 84760 | 77270 | 0 | 77270 | 614 |
| 348 | Construction of RCC Slab Culvert beside Vinayaka bar KUC Road Hanamkonda in division no 45 | Venkateshwarlu. Ch | 28-08-2008 | 60 days | 30-05-2009 | 03/07/2009 | 127246 | 118841 | 0 | 118841 | 615 |
| 349 | Arresting of Leakages on 6dia to 24 dia pipelines on various locations in ward no. 43,45 to 49 in A.E Circle -IV wing | Venkateshwarlu. Ch | 24-02-2009 | 30 days | 30-05-2009 | 03/07/2009 | 88899 | 81045 | 0 | 81045 | 616 |
| 350 | Laying of 4dia HDPE pipeline from H.No 4-6-209 to H.no 4-6-214 near Buddha Bhavan, Reddy colony, Hnk in ward no 48 | Venkateshwarlu. Ch | 18-02-2009 | 30 days | 30-05-2009 | 03/07/2009 | 54265 | 49470 | 0 | 49470 | 617 |
| 351 | Arresting of Leakages on 6dia to 24 dia pipelines on various locations in ward no. 43,45 to 49 in A.E Circle -IV wing | Venkateshwarlu. Ch | 18-02-2009 | 30 days | 30-05-2009 | 07/08/2009 | 89091 | 81218 | 0 | 81218 | 618 |
| 352 | Laying of HDPE Pipeline from CKM college Road to 22-1-87 at Weavers Colony, Warangal in Ward no. 1 | Govardhan Reddy.G | 18-02-2008 | 75 days | 02-06-2009 | 16/10/2009 | 674074 | 615686 | 0 | 615686 | 619 |
| 353 | Laying of CC Road from 20-6-24 to 24-6-53 and 20-06-52 to 20-6-50 and construtionn of section -I CC Drain at West Fort, Warangal in Ward No. 8 | GORRE AMARNATH | 21-01-2009 | 45 days | 03-06-2009 | 17/08/2009 | 207450 | 184307 | 0 | 184307 | 620 |
| 354 | Manufacture supply and delivery of 150mm dia S.Vs and specials for improement of water supply at Krishna Colony, Ganesh Nagar and Kancherlaveethi in W.No.43 & 49 | Govardhan Reddy.G | 24-02-2009 | 30 days | 03-06-2009 | 26/08/2009 | 92563 | 84059 | 0 | 84059 | 621 |
| 355 | Purchasing of Bore Wells Materials for 1 to 53 in WMC | M/s. Sai Thirumala Engineering Corporation. | 24-04-2009 | 30 days | 04-06-2009 | 29/09/2009 | 880925 | 823753 | 0 | 823753 | 622 |
| 356 | Arresting of Leakages on 6dia to 24 dia pipelines on various locations in ward no. 42,44 40 and 41 in Nakkalagutta GLSR Hnk | Venkateshwarlu. Ch | 28-02-2009 | 30 days | 06-06-2009 | 03/07/2009 | 98258 | 89577 | 0 | 89577 | 623 |
| 357 | providing of entreance gate to CRC centre at Ursu Kareemabad Warangal | Chandra Mohan.P | 27-02-2009 | 30 days | 06-06-2009 | 11/09/2009 | 99800 | 89860 | 0 | 89860 | 624 |
| 358 | Electrification to CRC centre at Urus, Kareemabad Warangal | Chandra Mohan.P | 02-02-2009 | 30 days | 06-06-2009 | 20/11/2009 | 99358 | 90579 | 0 | 90579 | 625 |
| 359 | Construction of North and East side plat Forms at CRC Centre at Urus, Kareemabad Wgl | Chandra Mohan.P | 04-06-2009 | 30 days | 06-06-2009 | 20/11/2009 | 94676 | 82863 | 0 | 82863 | 626 |
| 360 | Providing water supply and sanitation system to CRC centre at Urus, Kareemabad Warangal | Chandra Mohan.P | 27-02-2009 | 30 days | 06-06-2009 | 20/11/2009 | 96011 | 87527 | 0 | 87527 | 627 |
| 361 | F/o Gravel for Bathukamma and Dasara Festival at Mahankali Temple, Mini Rangaleela Maidan Rangasaipet Warangal in W.No.10 | S.SHIVASHANKAR | 17-09-2008 | 30 days | 09-06-2009 | 20/11/09 | 24919 | 20732 | 0 | 20732 | 628 |
| 362 | Filling of gravel at infront o Darga Shrrine on the occasion of Urus Festival,Darga Kazipet | Kumaraswamy. B | 19-02-2009 | 45 days | 10-06-2009 | 28/07/2009 | 37698 | 31362 | 0 | 31362 | 629 |
| 363 | Laying of CC Road from H.No.25-11-302/1 to 25-11-325 at Balaji Nagar, Kazipet in Ward No.34 | Kumaraswamy. B | 03-10-2008 | 60 days | 10-06-2009 | 28/07/2009 | 259728 | 231775 | 0 | 231775 | 630 |
| 364 | Laying of CC Road from H.No.1-2-119 to EP No. RNK 10 at Rahamath nagar, Kazipet in W.No.35 & 36 | Kumaraswamy. B | 11-02-2009 | 60 days | 10-06-2009 | 28/07/2009 | 422791 | 376350 | 0 | 376350 | 631 |
| 365 | Drilling of 6 1/2" dia Borewell and construction of static tank at Afzal Nagar and Drilling of 4 1/2' dia Borewell and erection of Hand pump at Shastri Nagar, Kazipet in Ward No.31 | Kumaraswamy. B | 24-08-2008 | 30 days | 10-06-2009 | 28/07/2009 | 103949 | 94438 | 0 | 94438 | 632 |
| 366 | Excavation for Trenches and High Beems cutting and filling of quarry dust from Sri rama Kiranam to H.No. 1-1-1125 at Siddartha Nagar, Kazipet | Kumaraswamy. B | 08-08-2008 | 30 days | 10-06-2009 | 16/09/2009 | 93136 | 73914 | 0 | 73914 | 633 |
| 367 | L/o of CC road at SBH Junction at Nakkalagutta, Hanamkonda | Kumaraswamy. B | 12-02-2009 | 75 days | 10-06-2009 | 16/09/2009 | 182016 | 162316 | 0 | 162316 | 634 |
| 368 | Laying of WBM Road from EP No. ZPS 9/1 to H.No; 2-6-1052 at KLN Reddy Colony, Hanamkonda | Naga Raju T | 15-01-2009 | 45 days | 10-06-2009 | 16/09/2009 | 228057 | 193825 | 0 | 193825 | 635 |
| 369 | Laying of WBM Road and Construction of CC Drain from H.No; 1-7-44/2A to 1-7-42, 1-7-46/1 to 1-7-56 at Sai Colony, Hanamkonda | Naga Raju T | 18-01-2009 | 75 days | 10-06-2009 | 16/09/2009 | 523352 | 454278 | 0 | 454278 | 636 |
| 370 | Laying of BT Road patches from 80'.0 Road to CKM College Junction at Deshaipet Road, Warangal (Instead of BT Work this work is changed to CC patch work) | M/s Shiva Constructions (K. Sudhakar) | 26-04-2007 | 45 days | 10-06-2009 | 26/11/2009 | 269961 | 240734 | 0 | 240734 | 637 |
| 371 | Construction of CC Drain from NH 202 Road to Transformer at Rahmathnagar, Kazipet in w.No. 35 | Kumaraswamy. B | 23-11-2008 | 45 days | 11-06-2009 | 28/07/2009 | 265934 | 237539 | 0 | 237539 | 638 |
| 372 | Arresting of leakages for pumping main 14 dai line from Waddepally filters to Kazipet S.R. Kazipet | Kumaraswamy. B | 20-01-2009 | 30 days | 11-06-2009 | 16/09/2009 | 93068 | 84825 | 0 | 84825 | 639 |
| 373 | providing water tanker for unserved areas under A.E. Circle-I in W.No.31 to 36 Kazipet | Kumaraswamy. B | 27-05-2009 | 30 days | 11-06-2009 | 16/09/2009 | 29008 | 28285 | 0 | 28285 | 640 |
| 374 | laying of WBM Road from EP No.TGK 12/1/3 to EP No. TGK 10/2 and H.No. 1-1-123/8/1/A at Prashanthinagar, Kazipet in W.No.36 | Kumaraswamy. B | 10-01-2009 | 60 days | 11-06-2009 | 16/09/2009 | 414403 | 327496 | 0 | 327496 | 641 |
| 375 | Laying of WBM Road and const. of CC Drain from H.No. 1-1-30 to 1-1-27/1 at Chaitanyapuri, Kazipet in W.No.36 | Kumaraswamy. B | 24-12-2008 | 60 days | 11-06-2009 | 16/09/2009 | 499473 | 405127 | 0 | 405127 | 642 |
| 376 | Laing of CC Road from H.No. 24-7-226/4/1 to Deaf and Dum School at Ramkrishna Colony, Kazipet in W.No.31 | Kumaraswamy. B | 10-12-2008 | 75 days | 11-06-2009 | 16/09/2009 | 584466 | 502386 | 0 | 502386 | 643 |
| 377 | Formation of road with gravel from 16'-00 road from H.No.1-1-27/19/8 at Prasanthinagar, Kazipet in W.No.36 | Kumaraswamy. B | 25-11-2008 | 60 days | 16-06-2009 | 28/07/2009 | 282386 | 234054 | 0 | 234054 | 645 |
| 378 | Laying of 160mm dia HDPE pipeline from H.No.4-2-380 to H.No.4-2-38 Near Suryanarayana Kiranam Kumarpally HNK in W.No.45 | Govardhan Reddy.G | 25-04-2009 | 30 days | 16-06-2009 | 26/08/2009 | 95309 | 86887 | 0 | 86887 | 646 |
| 379 | M/S/D of 140 mm dia HDPE pipeline forinter connection of H.No. 6-4-186, near Urdumedium High School Machilibazar HNK W.no.27 | Govardhan Reddy.G | 25-02-2009 | 30 days | 16-06-2009 | 20/09/2009 | 33012 | 30095 | 0 | 30095 | 647 |
| 380 | Interconnection of 21 dia improvement of Water Supply for Kancharkunta Area HNK W.No.46 | Govardhan Reddy.G | 18-05-2009 | 30 days | 16-06-2009 | 31/10/2009 | 47202 | 43124 | 0 | 43124 | 648 |
| 381 | Supply of A.E. C. No.VII | Chandra Mohan.P | 20-02-2009 | 30 days | 17-06-2009 | 19/09/2009 | 88705 | 80930 | 0 | 80930 | 649 |
| 382 | White painting to compound wall and ground leveling with gravel at CRC centre Kareemabad warangal | Chandra Mohan.P | 27-02-2009 | 30 days | 17-06-2009 | 20/11/2009 | 99698 | 85582 | 0 | 85582 | 650 |
| 383 | Laying of 200mm dai HDPE pipeline at UPA Nirmitha Kendra at 100 ft Road beside Sammaiahnagar HNK in W.No.42 | Chandra Mohan.P | 21-02-2009 | 30 days | 20-06-2009 | 19/09/2009 | 64864 | 59132 | 0 | 59132 | 651 |
| 384 | Laying of 140mm dia HDPE pipeline from H.No. 2-4-1453/5 to 2-4-1292 at Gandhinagar, Hanamkonda inW.No.41 | Chandra Mohan.P | 20-02-2009 | 30 days | 20-06-2009 | 19/09/2009 | 65992 | 60161 | 0 | 60161 | 652 |
| 385 | L/o of CC Road at Bhavani Nagar, Kazipet | Kumaraswamy. B | 23-04-2009 | 60 days | 22-06-2009 | 28/07/2009 | 546998 | 455127 | 0 | 455127 | 653 |
| 386 | 50/3 mm value at L.B.Nagar Wgl A.E. VII At Wgl | Chandra Mohan.P | 19-02-2009 | 30 days | 23-06-2009 | 19-04-2009 | 83186 | 75836 | 0 | 75836 | 654 |
| 387 | Enamel painting to Clarifocuulator Bridges at Deshaipet Filters, Warangal | Chandra Mohan.P | 20-05-2009 | 30 days | 23-06-2009 | 20/11/2009 | 39952 | 36421 | 0 | 36421 | 655 |
| 388 | Laying of CC road from H.No. 1-6-21 to 24 and EP No. JMK 16/2/1 to 1-6-24 at Jubilee Market, Kazipet in Div.No.33 | Kumaraswamy. B | 20-08-2008 | 45 days | 25-06-2009 | 28/07/2009 | 167999 | 148623 | 0 | 148623 | 656 |
| 389 | Laying of CC Road from H.No.1-2-282/1 to 1-2-286 at Rahmathnagar, Kazipet in W.No.36 | Kumaraswamy. B | 10-01-2009 | 45 days | 25-06-2009 | 28/07/2009 | 146847 | 130371 | 0 | 130371 | 657 |
| 390 | Laying of CC Road from 20-16-170/A to 20-16-168/1 Construction of CC Drain Sec-I from 20-16-143 to 20-16-134, 20-16-171 to Han Bore 2/6 at Kothagadda and from 20-13-14 to 20-13-139 & Construction of Static Tanks at H.No.20-15-40 & 20-15-136 at East Fort | Laxmi Narayana.D | 25-03-2009 | 65 days | 25-06-2009 | 19/10/2009 | 250690 | 221324 | 0 | 221324 | 658 |
| 391 | Attending water suply works at Nakkalagutta Sump Hanamkonda | Chandra Mohan.P | 22-02-2009 | 30 days | 26-06-2009 | 19/09/2009 | 26818 | 24449 | 0 | 24449 | 659 |
| 392 | Painting to the Ambedhkar Statue at Beside Municipal Commissioner's Camp Ofice HNK | Chandra Mohan.P | 21-02-2009 | 30 days | 26-06-2009 | 19/09/2009 | 14663 | 13366 | 0 | 13366 | 660 |
| 393 | Laying of 140mm dia HDPE pipeline from H.No.5-11-158 to EP No. RLN/5 at Kishanpura, Hanamkonda | Chandra Mohan.P | 22-02-2009 | 30 days | 26-06-2009 | 19/09/2009 | 59948 | 54650 | 0 | 54650 | 661 |
| 394 | Laying of 110mm dia HDPE pipe line from 6-6-8 to 6-6-16 at Thousand Pillors Temple in Ward.No.50 | Chandra Mohan.P | 26-08-2009 | 30 days | 26-06-2009 | 19/09/2009 | 53575 | 48841 | 0 | 48841 | 662 |
| 395 | Filling of the pot holes and levelling in side at the ground at backside Etukala Madusudhan Rao School, Kothawada, Wgl on occasion of Bathukamma & Dasara Festival | Chandra Mohan.P | 29-09-2008 | 30 days | 26-06-2009 | 19/09/2009 | 40000 | 33275 | 0 | 33275 | 663 |
| 396 | Providing o Barcading at Kothawada, Warangal on occation of Bathukamma Festival | P. Venu Gopal | 06-12-2009 | 15 days | 26-06-2009 | 19/09/2009 | 17846 | 16715 | 0 | 16715 | 664 |
| 397 | Construction of Compound wall and Supply and Fixing of MS Gate at Kothawada Warangal in Ward No.52 | Chandra Mohan.P | 17-02-2009 | 30 days | 26-06-2009 | 26/09/2009 | 78597 | 70291 | 0 | 70291 | 665 |
| 398 | Laying of Box drain from Gopalpur road to Cause way to H.No. 2-1-18 at Saraswathi nagar Hanamkonda Ward.No.42 | Chandra Mohan.P | 17-02-2009 | 30 days | 26-06-2009 | 26/09/2009 | 155551 | 137487 | 0 | 137487 | 666 |
| 399 | Engaging of semi skilled and un-skilled persons at KUC filters and aresting leakages under AE circle IV Hanamkonda | Govardhan Reddy.G | 25-04-2009 | 90 days | 26-06-2009 | 28/09/2009 | 77040 | 75121 | 0 | 75121 | 667 |
| 400 | Laying oc CC Road from H.No.1-8-152 to 1-8-144 at Balasamudram, Hnk in W.No.40 | M/s Harsha Constructions | 01-06-2009 | 45 days | 26-06-2009 | 15/11/2009 | 295225 | 270523 | 0 | 270523 | 668 |
| 401 | C/o CC Drain from EP No. MRS 50 to opp: Eden Function Hall and upto 2-5-810 at Mubarak mahal, Hanamkonda in Ward.No.40 | M/s Harsha Constructions | 01-06-2009 | 75 days | 26-06-2009 | 15/11/2009 | 732363 | 653580 | 0 | 653580 | 669 |
| 402 | Construction of compound wall around Hanuman Temple at Chintal in W.No.7 | V. Yadagiri | 01-06-2009 | 30 days | 28-06-2009 | 09/09/2009 | 111114 | 98800 | 0 | 98800 | 670 |
| 403 | Laying of CC Road and construction of Sec-I CC Drain from H.No. 20-8-34 and 20-8-45 at Betrajulawada, Middle Fort, Warangal in Div.No.8 | V. Yadagiri | 01-06-2009 | 60 days | 28-06-2009 | 29/09/2009 | 489898 | 436640 | 0 | 436640 | 671 |
| 404 | L/o of 160 mm dia HDPE Pipe Line from H.No.5-11-476 to 443 at Preem Nagar Colony | GANGA POLYMERS | 12-12-2008 | 45 days | 29-06-2009 | 19/09/2009 | 245659 | 210649 | 0 | 210649 | 672 |
| 405 | L/o of 160 mm dia HDPE Pipe Line from H.No.11-29-71 to 11-28-283/1 at Preem Nagar Colony | GANGA POLYMERS | 12-09-2008 | 45 days | 30-06-2009 | 19/09/2009 | 262977 | 225524 | 0 | 225524 | 673 |
| 406 | L/o of 200 mm dia HDPE Pipe Line from H.No.5-11-420 to 5-11-363/1 at Preem Nagar Colony | GANGA POLYMERS | 12-12-2008 | 60 days | 30-06-2009 | 19/09/2009 | 503727 | 430692 | 0 | 430692 | 674 |
| 407 | L/o of WBM Road @ Section I & II CC Drain from 2-253 @ H.No.2-12-2021 to E.P.No.KNK 76, HNK in Div No.43 | M. RAVINDER | 01-02-2009 | 105 days | 30-06-2009 | 29/09/09 | 769802 | 675609 | 0 | 675609 | 675 |
| 408 | Laying of 160mm dia HDPE pipeline at Gap portion at opp: Reddy Chicken Centre Kishanpura, HNK | Chandra Mohan.P | 21-02-2009 | 30 days | 01-07-2009 | 19/09/2009 | 82000 | 74722 | 0 | 74722 | 676 |
| 409 | Laying of CC road from EP No. DPRC 17 to DPRL 20 at Desaipet Road Warangal | Sudhakar.K | 06-07-2009 | 90 days | 01-07-2009 | 26/11/2009 | 1031867 | 927589 | 0 | 927589 | 678 |
| 410 | Laying of WBM Road and Constrution of CC Drain from H.No.24-7-723 to 268/8 and EP No.PRS 11/4 to 24-7-245 at Rama Krishna Colony, Kazipet in Div.No.31 | M/s Harijana Labour Contract Co-operative Society, Somaram | 18-10-2008 | 45 days | 04-07-2009 | 10/07/2009 | 332539 | 267333 | 0 | 267333 | 679 |
| 411 | Laying of CC Drain from Indian Overseas Bank to Circuit House Road, nakkalagutta HNK in.W.No. 40 | M/S SAI KRUPA ENTERPRISES | 10-01-2009 | 75 days | 04-07-2009 | 20/11/2009 | 735168 | 664897 | 0 | 664897 | 680 |
| 412 | Supply and delivery of spindle rods at Under Railway gate area in W.No.7 to 11 and 15 to 18 & 20 Warangal | Chandra Mohan.P | 30-04-2009 | 30 days | 07-07-2009 | 19/09/2009 | 49920 | 45509 | 0 | 45509 | 681 |
| 413 | Arresting of leakages in various places at Under Railway gate area in W.No.7 to 11 and 15 to 18 & 20 Wgl | Chandra Mohan.P | 30-04-2009 | 30 days | 07-07-2009 | 19/09/2009 | 49660 | 45274 | 0 | 45274 | 682 |
| 414 | Supply and delivery of sluice valves at Under Railway Gate area in W.No.7 to 11 and 15 to 18 & 20 | Chandra Mohan.P | 30-04-2009 | 30 days | 07-07-2009 | 26/09/2009 | 49930 | 45519 | 0 | 45519 | 683 |
| 415 | LAY OF WMB ROAD FROM H.NO.2-10-891-3 TO 60 ROAD AT BANK COLONY HNK | Kumaraswamy. B | 15-10-2008 | 30 days | 10-07-2009 | 02/04/2009 | 103029 | 77306 | 0 | 77306 | 684 |
| 416 | Laying of 160mm dia 110mm dia HDPE pipeline on 10" RCC pipes from H.No.16-9-401to puppalagutta tank at Warangal in W.No.7 (SC Area) | Govardhan Reddy.G | 12-06-2009 | 30 days | 10-07-2009 | 27/08/2009 | 43007 | 40282 | 0 | 40282 | 685 |
| 417 | Laying of 110mm dia HDPE pipe line from H.No.16-10-823 to 16-10-848 at Shivangar Warangal ST Area in W.No.17 | Govardhan Reddy.G | 12-06-2009 | 30 days | 10-07-2009 | 28/09/2009 | 62457 | 56939 | 0 | 56939 | 686 |
| 418 | L/o 110mm dia HDPE pipe line from 16-4-1452 to 16-4-1450 and 16-4-1105 at Shivanagar Warangal in W.No.16 | Govardhan Reddy.G | 10-06-2009 | 45 days | 16-07-2009 | 26/08/2009 | 97101 | 88520 | 0 | 88520 | 687 |
| 419 | Laying of CC road at Shambunipet, Muslim Area and Lepresy Hall Area, Warangal in Div.No.10 | MSR CONSTRUCTIONS | 17-07-2008 | 60 days | 16-07-2009 | 15/09/2009 | 511005 | 445456 | 0 | 445456 | 688 |
| 420 | S/o of Water supply material in maintenance of Water supply in Circle No.VII in Ward No.26, 27 to 50 to 53 | Venkataramana Enterprises | 26-02-2009 | 30 days | 16-07-2009 | 19/09/2009 | 67834 | 63536 | 0 | 63536 | 689 |
| 421 | S/o Spindle Road in Ward No.1,3,4,5,6 and 22 Warangal in A.E Circle I | Venkataramana Enterprises | 26-02-2009 | 30 days | 16-07-2009 | 19/09/2009 | 65790 | 61621 | 0 | 61621 | 690 |
| 422 | S/o of Shive Value and take pices for Warangal in A.E Circle I | Venkataramana Enterprises | 26-02-2009 | 30 days | 16-07-2009 | 19/09/2009 | 93610 | 87679 | 0 | 87679 | 691 |
| 423 | Laying of 110mm dia distribution line from H.No; 1-7-1293 to 1-7-1284 at Advocates Colony,Hnk | Govardhan Reddy.G | 18-02-2009 | 30 days | 17-07-2009 | 20/11/2009 | 50381 | 45929 | 0 | 45929 | 692 |
| 424 | Replacing of damaged pipeline with new pipe at Vivekananda School and nature care hospital Hanamkonda | Govardhan Reddy.G | 18-02-2009 | 30 days | 17-07-2009 | 20/11/2009 | 62818 | 57268 | 0 | 57268 | 693 |
| 425 | Laying of CCRoad from H.No. 2-7-701 to 2-7-678 at excise colony, HNK in Div.NO.39 | Kumaraswamy. B | 07-11-2008 | 75 days | 23-07-2009 | 16/09/2009 | 880996 | 770691 | 0 | 770691 | 694 |
| 426 | Laying of CC Road and Const. of CC drain from H.No. 2-7-887 to 892, 2-7-904/A to 701, EP APS8 to 2-7-1009 at Alipura, HNK in Div. No.39 | Kumaraswamy. B | 13-08-2008 | 75 days | 23-07-2009 | 20/11/2009 | 648717 | 558326 | 0 | 558326 | 695 |
| 427 | Laying of CC Road from H.No. 2-4-617/A to 2-4-614 and upto 2-4-720/4 at Ram Nagar, Hanamkonda in Div.No.41 | Srinvias P | 11-02-2009 | 45 days | 23-07-2009 | 27/11/2009 | 224414 | 201794 | 0 | 201794 | 696 |
| 428 | L/o CC Road from 2-5-294/1 at Nakkalagutta Hanamkonda in div.no.40 | Rajendra Prasad | 15-05-2007 | 45 days | 25-07-2009 | 24/09/2009 | 103392 | 90026 | 0 | 90026 | 697 |
| 429 | L/o of CC drain from 22-3-35 to Hill and CC drain from 22-3-85 to 22-3-83 at Desaipet Warangal | Sanjeev. G | 18-10-2009 | 45 days | 01-08-2009 | 11/06/2009 | 175166 | 156545 | 0 | 156545 | 698 |
| 430 | Construction of Section-I & II CC Drain and Box drain from 1-1-1376 to 1369 to Opp. 1404 at Venkatadrinagar Kazipet in Div.No.36 | M/s Harijana Labour Contract Co-operative Society, Somaram | 18-10-2008 | 60 days | 01-08-2009 | 10/07/2009 | 328537 | 282593 | 0 | 282593 | 699 |
| 431 | L/o of CC Road from 3-14-411 to 3-14-399 at Durga Colony, Hanmkonda in Div.No.43 | Naresh Kumar.D | 24-07-2008 | 60 days | 01-08-2009 | 20/11/2009 | 318642 | 277766 | 0 | 277766 | 701 |
| 432 | L/o of CC Road from EP No. RCH 85/31 to 3-9-219/1 at Reddy Colony, Hanamkonda in W.No.48 | Naresh Kumar.D | 28-08-2008 | 60 days | 01-08-2009 | 20/11/2009 | 427552 | 390317 | 0 | 390317 | 702 |
| 433 | (98) C/o drainage from H.No.2-7-542 to 2-7-700/A in excise colony, Hanamkonda. | Chandra Mohan.P | 04-06-2009 | 30 days | 03-08-2009 | 20/11/2009 | 89886 | 80498 | 0 | 80498 | 703 |
| 434 | Construction of Retaining wall at Backside of Burrial Ground Pothana Nagar, Warangal in Ward No.26 | SATISH KUMAR . N | 25-08-2008 | 75 days | 13-08-2009 | 14/10/2009 | 422780 | 372321 | 0 | 372321 | 704 |
| 435 | L/o of 110mm dia HDPE pipe line from H.No. 11-30-58 to 11-28-230 at Kothawada Wgl W.No.51 | Suresh Kumar.S | 28-05-2009 | 30 days | 17-08-2009 | 25/11/2009 | 74562 | 67973 | 0 | 67973 | 705 |
| 436 | Laying of CC road from 6-1-52 to 6-1-68 at Kancharakunta, Hanamkonda in Ward.No.46 | MSR CONSTRUCTIONS | 28-08-2008 | 45 days | 18-08-2009 | 04/11/2009 | 186102 | 166830 | 0 | 166830 | 706 |
| 437 | L/o of 110mm dia HDPE pipe line from H.No. 11-30-75 to 11-30-80 at Kothawada Wgl Ward.No.51 | Suresh Kumar.S | 28-05-2009 | 30 days | 18-08-2009 | 25/11/2009 | 42500 | 38709 | 0 | 38709 | 707 |
| 438 | Laying of 110mm dia HDPE pipeline from H.No. 22-6-123 to 22-8-129 at Perukawada, Deshaipet, Warangal in W.No.53 | Suresh Kumar.S | 20-02-2009 | 30 days | 18-08-2009 | 25/11/2009 | 47286 | 43108 | 0 | 43108 | 708 |
| 439 | Laying of CC road from H.No. 3-10-259 to 3-10-276 and 3-10-272 to RCH 3 at Reddy Colony, Hnk in Div. No.48 | Laxmi Narayana.D | 20-05-2009 | 75 days | 20-08-2009 | 29/11/2009 | 249140 | 215843 | 0 | 215843 | 709 |
| 440 | L/o of WBM road and construction of SEction-II CC drain from 16-3-835 to 16-3-834/1 Opp. to Annapurna Function Hall at Ekashila Nagar, Warangal | Ajay Dalitha LCCS Warangal | 24-11-2008 | 60 days | 05-09-2009 | 09/04/2009 | 484231 | 425812 | 0 | 425812 | 710 |
| 441 | Laying of CC road from H.No. 3-10-259 to 3-10-276 and 3-10-272 to RCH 3 at Reddy Colony, Hnk in Div. No.48 | Naresh Kumar.D | 26-10-2007 | 45 days | 24-09-2009 | 20/11/2009 | 249140 | 215843 | 0 | 215843 | 712 |
| 442 | L/o CC Road at SBH Junction at Nakkalagutta HNK | Kumaraswamy. B | 31-08-2009 | 60 days | 25-09-2009 | 16/09/2009 | 235804 | 210261 | 0 | 210261 | 713 |
| 443 | Construction of Chamber wall raising with RCC At Dharma Sagar Tank (Storage) | Kumaraswamy. B | 08-09-2009 | 60 days | 25-09-2009 | 16/09/2009 | 123065 | 111544 | 0 | 111544 | 714 |
| 444 | Filling of Pot holes with dust on the occasion of Ganesh Nimajjanam at Darga Kazipet W.No.31 | Kumaraswamy. B | 17-08-2009 | 30 days | 25-09-2009 | 09/10/2009 | 28685 | 21591 | 0 | 21591 | 715 |
| 445 | Excavation of filed channel from existing check dam No.1 to somidi tank weir kazipet | Kumaraswamy. B | 08-09-2009 | 90 days | 25-09-2009 | 09/10/2009 | 496461 | 452592 | 0 | 452592 | 716 |
| 446 | Laying of 900mm dia NP3 pipes and excavation of field channel from Kapil Homes to existing check dam No.1 Madikonda | Kumaraswamy. B | 08-09-2009 | 75 days | 25-09-2009 | 09/10/2009 | 266111 | 242597 | 0 | 242597 | 717 |
| 447 | Construction of Section-II CC drain from H.No. 15-10-258 to 15-10-272 at Ramannapet, Warangal in Ward.No. 19 | M/S SAI KRUPA ENTERPRISES | 16-01-2009 | 60 days | 30-09-2009 | 20/11/2009 | 209899 | 185032 | 0 | 185032 | 718 |
| 448 | Levelling the ground with gravel at near petrol pump magilicherla road in W.No.3 Bathukamma Festival | DAYAKAR.G | 12-09-2009 | 15 days | 09-10-2009 | 20/11/2009 | 21884 | 18205 | 0 | 18205 | 719 |
| 449 | Laying of CC patch work at Ekashila Nagar Warangal in Ward No.15 & 18 | GORRE AMARNATH | 10-08-2008 | 30 days | 12-10-2009 | 17/08/2009 | 153058 | 136586 | 0 | 136586 | 720 |
| 450 | Layingo of CC Road with WBM Road from H.No. 12-8-216/1 to PJR 8/13 at Santoshimatha Colony Hunter Road Warangal in Ward.No.19 | MSR CONSTRUCTIONS | 25-08-2008 | 45 days | 13-10-2009 | 04/11/2009 | 199203 | 173380 | 0 | 173380 | 721 |
| 451 | Laying of CC Roads in Orus Kareemabad in Ward.NO.12 | MSR CONSTRUCTIONS | 20-08-2008 | 90 days | 13-10-2009 | 20/11/2009 | 836417 | 764330 | 0 | 764330 | 722 |
| 452 | Laying of Pipes to Cross Drinage at Various Places in W.No.23 Warangal | Sri Venkateshwara Constructions | 17-11-2009 | 45 days | 16-10-2009 | 21/08/2008 | 88816 | 79733 | 0 | 79733 | 723 |
| 453 | Formation of Gravel Road from E.P. No. KWT 7/10 to Khammam Road fro Bathukamma Festival at Koutalya School Kareemabad Warangal | Sadanandam. B | 14-09-2009 | 30 days | 16-10-2009 | 17/11/2009 | 25000 | 21385 | 0 | 21385 | 724 |
| 454 | Blandage to existing damaged WBM Road from EP no. 13/5/A to Khammam Road at Talla Padmavathi Pharmacy College for Bathukamma Festival, karimabad, Warangal | Sadanandam. B | 10-09-2009 | 15 days | 16-10-2009 | 19/11/2009 | 20975 | 17510 | 0 | 17510 | 725 |
| 455 | Arresting the leakages in Ward no,.7,8,9,10,11 and 15,16,17 under AE Cirlce No.V | Govardhan Reddy.G | 11-08-2009 | 30 days | 16-10-2009 | 20/11/2009 | 99497 | 93178 | 0 | 93178 | 726 |
| 456 | Construction of Section-II CC Drain from H.No. 3-4-615 to 538 and 3-4-616 to 3-4-514 at Yenugulagadda, Hanamkonda in Ward.No.49 | Preethi Const. | 28-03-2009 | 75 days | 24-10-2009 | 25/09/2009 | 490331 | 401643 | 0 | 401643 | 727 |
| 457 | Construction of Section-II CC drain from 3-4-621 to 3-4-485 and 3-4-621 to 3-4-45 and EP No. YGH 29/1 to 3-4-481 at Yenugulagadda, Hanamkonda in Ward.No. 49 | Preethi Const. | 20-10-2008 | 75 days | 24-10-2009 | 25/09/2009 | 448116 | 362571 | 0 | 362571 | 728 |
| 458 | Blindage to Koti Lingala Road from Ex. CC Road to Sai Baba Temple lane in W.No.4 Warangal | Preethi Const. | 12-09-2001 | 15 days | 26-10-2009 | 29/09/2009 | 18281 | 15210 | 0 | 15210 | 730 |
| 459 | Laveling th Eduga Ground at Near Lothukunta Warangal W.No.3 | Preethi Const. | 11-09-2009 | 15 days | 26-10-2009 | 29/09/2009 | 23497 | 19552 | 0 | 19552 | 731 |
| 460 | Construction of Compound wall in Burrial ground at Santhoshmatha Colony, Hunter Road, Warangal in Ward.No. 19 | Sadanandam. B | 09-10-2009 | 75 days | 30-10-2009 | 15/09/2009 | 763698 | 647295 | 0 | 647295 | 732 |
| 461 | Excavation for field channel from D1 & D2 canal along the Dharma Sagar Road | Kumaraswamy. B | 05-10-2009 | 60 days | 04-11-2009 | 20/11/2009 | 467399 | 426099 | 0 | 426099 | 733 |
| 462 | M/S/D of 1000mm dia RCC NP3 pipes and Rock cutting in between D1 canal Open channel to D2 canal channel, Madikonda | Kumaraswamy. B | 03-11-2009 | 45 days | 10-11-2009 | 20/11/2009 | 271889 | 247592 | 0 | 247592 | 735 |
| 463 | Gravel filling on the occasion of Bathukamma festival and eddol fital in various locations at Kazipet | Kumaraswamy. B | 17-08-2009 | 15 days | 10-11-2009 | 20/11/2009 | 26959 | 22428 | 0 | 22428 | 736 |
| 464 | Laying of CC road from H.No. 25-5-121 to Mahankali Temple at Vishnupuri Kazipet Ward.No.34 | Kumaraswamy. B | 18-07-2009 | 30 days | 10-11-2009 | 20/11/2009 | 151248 | 127814 | 0 | 127814 | 737 |
| 465 | Laying of 110mm dia HDPE pipeline from H.No.16-3-603 to 16-3-416 at Sakarasikunta Warangal in Ward.No.15 | Govardhan Reddy.G | 21-10-2009 | 30 days | 13-11-2009 | 20/11/2009 | 39916 | 36389 | 0 | 36389 | 738 |
| 466 | Laying of C.C. Road from 11-24-135 to 11-29-60 | Venkateshwarlu P. | 28-11-2007 | 60 days | 25-11-2009 | 31/10/2008 | 352000 | 286113 | 0 | 286113 | 739 |
| 467 | Laying of CC Road from 5-11-1074 to 5-11-1067 at Pochammakunta, Hanamkonda in Ward No.44 | MSR CONSTRUCTIONS | 17-10-2008 | 60 days | 02-03-209 | 14/07/2009 | 254570 | 225017 | 0 | 225017 | 740 |
| 468 | C/o of CC Drain from 2-4-828 to 448 at Venkat Rao Nagar Colony at Ward No.41 | K. Raghupathi Reddy | 15-10-2008 | 30 days | 04-02-209 | 13/02/2009 | 124000 | 102012 | 0 | 102012 | 741 |
| 469 | Laying of CC Road from EP.No.37 BNH 21 to H.No.1-7-1818 at Srinivas Nagar, HNK | Manohar.M | 15-05-2006 | 60 days | 08-01-208 | 29/08/2008 | 166909 | 150313 | 0 | 150313 | 742 |
| 470 | LAYING OF CC ROAD16-6-195 TO OPP MAZID AT PERUKAWADA | Chandra Mohan.P | 09-12-2008 | 30 days | 2602-2009 | 02/05/2009 | 101466 | 93521 | 0 | 93521 | 743 |
| 471 | Providing Water Supply failing to Existing Dhobi Ghat at Chinna Waddepally Cheru, Desaipet | Ravi kumar.P | 05-07-2008 | No | No | 15/09/2008 | 43192 | 38963 | 0 | 38963 | 744 |
| 472 | contrution of cc drain and formation gravel road from govt to EP No ASD/21 and ASD/24/1 to ASD/1/5 at desaipet warangal div 1 | Sanjeev. G | | | | 02/01/2000 | 457374 | 404569 | 0 | 404569 | 745 |
| 473 | L/o 200 mm dia HDPE pipe line from 7-8-110 of 7-8-99 at Machili Bazar HNK | Chandra Mohan.P | | | | 17/10/2008 | 141212 | 131360 | 0 | 131360 | 746 |
| 474 | Construction of 450 mm size C.C Drain from 1-8-83/17 to Sridevi Talkes main Road and Gravel Formation from 1-8-83/17 to EP.No. SWH 23/5 at Sainagar, Balasamudram Hyd in Ward No.40 | M/S SAI KRUPA ENTERPRISES | | | | 10/12/2008 | 222015 | 162859 | 0 | 162859 | 747 |
| 475 | Construction WBM Road from H.NO.1-7-380 to 1-7-377 at Revenue Colony, HNK | Ramesh.B | | | | 30/01/2009 | 169000 | 138296 | 0 | 138296 | 748 |
| 476 | C/o of CC Road from E.P.No.40 to H.No.2-9-43 at Vikas Nagar, HNK | Ravinder Rao A | | | | 06/10/2009 | 212500 | 187098 | 0 | 187098 | 749 |
| 477 | Leveling the Ground at Various Locations in Div No.37 for the occeassion of Bathukamma Festival | Ravinder Rao A | | | | 06/10/2009 | 29500 | 24212 | 0 | 24212 | 750 |
| 478 | Levelling the ground for the occasion of Bathukamma Festival in Div.No.30 | Ravinder Rao A | | | | 06/10/2009 | 20072 | 16698 | 0 | 16698 | 751 |
| 479 | Laying of CC Road and construction of CC Drain from EP No. FRM 55/8/5 to H.No. 16-4-269/1 and EP No. SNM 21/2/5 to Opp. 16-4-1154 at Shiva Nagar Warangal in Ward No. 16 | Niranjan .V | | | | 14/10/2009 | 627484 | 518770 | 0 | 518770 | 752 |
| 480 | Laying of WBM Road from 2-7-521 to 2-7-516 at Excise Colony, Hanamkonda in Div.No.39 | VCR ASSOCIATES | | | | 25/10/2009 | 82894 | 69133 | 0 | 69133 | 753 |
| 481 | L/o of CC Road from H.No.16-6-185 at 83 at Perukawada Wgl W.No.17 | Chandra Mohan.P | | | | 05/11/2009 | 99500 | 90868 | 0 | 90868 | 754 |
| 482 | Levelling the ground for the occasion of Bathukamma Festival in Div.No.28 & 37 | Ravinder Rao A | | | | 11/11/2009 | 24463 | 20351 | 0 | 20351 | 755 |
| 483 | Laying of CC Road from 1-9-352 to EP No. BNS 29/2 1-9-340 to EP No BNS 29-1-2 at Julywada Hanamkonda in Div.No.30 | M/s Waddera Labour contractor Paraspara Sahayaka Sahakara Sangam Ltd. | | | | 13/11/2009 | 454863 | 399033 | 0 | 399033 | 756 |
| 484 | Laying of CC Road and construction of CC Drain from 3-9-86 to 3-9-93 and 3-9-96/6 at Reddy Colony Hanamkonda | Naresh Kumar.D | | | | 20/11/2009 | 334334 | 299028 | 0 | 299028 | 757 |
| 485 | Restoration of Damaged Existing Road by Formation of Gravel Road from 11-23-2331 to Road end at LB Nagar Warangal in Ward.No.2 | Niranjan .V | | | | 20/11/2009 | 124948 | 89582 | 0 | 89582 | 758 |
| 486 | Restevation of Damaged existing road by Formation of Gravel road at Koyawada in Various plaes in Ward.No.14 | Niranjan .V | | | | 20/11/2009 | 158000 | 116274 | 0 | 116274 | 759 |
| 487 | Construction of CC Drain and Laying of CC Road from H.No. 16-10-1225 to 16-10-1119 and H.No.16-6-1371 and other places at shivanagar Warangal in W.No.17 | Niranjan .V | | | | 20/11/2009 | 203404 | 166391 | 0 | 166391 | 760 |
| 488 | Laying of CC Road from 16-4-996/1 to excisting CC Road at Shivanagar warangal in W.NO.16 | Niranjan .V | | | | 27/11/2009 | 274659 | 243531 | 0 | 243531 | 761 |
| 489 | Laying of CC Road and constrion of CC Drain from H.No.16-4-610 to 16-4-602 at shinvanagar warangal w.no.16 | Niranjan .V | | | | 27/11/2009 | 126722 | 106416 | 0 | 106416 | 762 |