Civil Contractors Due List

S.No.NameOf The WorkName Of The ContractorDate of Admn.Sanction by MCPeriod of ExecutionDate of WorkOrderDate of PassOrder.Gross AmountNet Amount60% AmountPresent Due(Balance)To be paid
1Desilting of existing mala from Presidency Bridge to Managalivegu bridge under AE circle III HNKS.SHIVASHANKAR05-06-200830 days10-07-200817/11/20087918757151057151239
2desiliting of silt from cullage drain from H.No 11-23-1063, to Masid and other places in L.B Nagar Ward No 2Suresh Kumar.S21-04-200830 days10-07-200824/12/20087285958296058296240
3desiliting at the Ex Box Drain from H.No 16-10-672 to Khammam road wglSuresh Kumar.S02-04-200830 days10-07-200824/12/20086978652435052435241
4CC ROAD FROM 25-2-101 TO 25-2-111, 25-3-21/1 TO LANE AND EP.NO. HPK 32/11 to HPK 32/12 in ward no. 34Kumaraswamy. B22-11-200745 days10-07-200812/01/20091778921486340148634242
5Laying of WBM road from H.No. 2-8-665 to 2-8-670/4 at Excise Colony Hnk in Div.No.38Srinivas Tallapelli15-02-200830 days10-07-200827/11/20091253721045850104585243
6Formation of Gravel at beside of Petrol Bunk at Kashibugga Main Road, Warangal DAYAKAR.G20-05-200830 days11-07-200820/11/20092799623314023314244
7L/o cc road at srinagar colony at div.no.37Sanjeev. G25-02-200845 days14-07-200825/05/20093592983010440301044245
8Laying of C.C. Road from E.P.No.Man/4/01 to H.No.1-8-430 & H.No.1-8-431 to E.P.No.BSW 32 at Balasamudram Hnk.Naresh Kumar.D06-12-200790 days15-07-200813/11/20086584205806570580657246
9Laying of CC Road from H.No.4-1-147 to 4-1-148 & 4-2-111 to 4-2-110/A at Kothuru, HNK W.No.45Naresh Kumar.D05-01-200860 days16-07-200803/11/20082559442275140227514247
10Construction of compound wall at Shanpoor gravel yeard at Ursu, Harijanawada, Wgl in W.No.11Sadanandam. B26-01-200845 days16-07-200826/02/20092037511825230182523248
11C.C drain from 2-1-653 to 2-1-695 at Gopalpuram Road, Hnk Ward No.42Laxmi Narayana.D03-03-200830 days21-07-200829/11/200801038400103840250
12C/o Section ICC Drain from EP No. BNS7 to 1-9-987 at Julywada W.No.30Laxmi Narayana.D05-03-200845 days21-07-200812/01/20091570171242920124292251
13Construction of Section I CC Drain from E.P.No.40 VNN 6 to 2-9-35/5 at Vikasnagar, HNk in D.No.37Laxmi Narayana.D15-02-200830 days21-07-200810/06/20091538981168210116821252
14L/o WBM road and Const. of CC Drain from H.No. 16-3-498/3 to Ex-Culvert at Ekashila Nagar, Warangal inWard No. 15Ajay Dalitha LCCS Warangal08-08-200875 days25-07-200809/04/20096494215656110565611253
15Arresting of Leakages in Ward No.7 to 11 in WglG.Sreedhar03-07-200815 days03-08-200827/04/20099954093033093033254
16Laying of C.C. Road from H.No.1-7-752 to 1-7-799 at Shanthi nagar Hanamkonda in Ward No.29Laxmi Narayana.D12-02-200845 days05-08-200820/11/20082777642411580241158255
17Widening of CC Road from 5-4-87 to 5-4-104 at Ambala Road Hnk, in D.V 47M/s Mitra Constructions05-10-200760 days13-08-200807/02/20085418104705620470562256
18LAYING OF CC ROAD FROM5-9-163 TO EP NO KNR 4 AT SIKHWADA HNK DIV NO 46M/s Mitra Constructions26-10-200730 days13-08-200827/09/20081141571022560102256257
19Laying of CC Road from 5-9-105 to ICICI Bank Main Road at Kishanpura, HNK in W.No.46M/s Mitra Constructions04-09-200745 days13-08-200827/09/20082686742400030240003258
20Construction of CC Drain from H.No.11-20-590 to Burrial ground at Padmanagar, Wgl in Div.No.1HLCCS-Rangampet25-06-200930 days15-08-200808/06/20091173111029570102957259
21L/O BT ROAD FROM HNO.2-7-506 TO OPP HNO 2-7-1246 AT EXCISE COLONY HNK DIV .NO.39M/s. P.W.L.C.Coop.Society, Laxmipuram02-02-200845 days20-08-200824/01/20094982664430670443067260
22Construction of CC Drain Pipe Line at Beside Raipura Park, HNK Ward No.50Manohar.M12-02-200830 days23-08-200819/02/20083903634239034239261
23Laying of C.C Road from 2-4-11 to 2-4-13 and Construction of C.C Drain from 2-4-14 from 45 at RamnagarManohar.M25-11-200745 days23-08-200831/10/20081768451577710157771262
24Construction of Cc Drain Section-I JPN 15/3 to JPN 15 and DSM 16/2 at Vishwakarma Street, Yellamma Bazar, Warangal Ravi kumar.P28-11-200730 days27-08-200808/11/20091507221183830118383263
25C/O CC DRAIN FROM EPNO. CMS 5 TO CMS 5/1 & UPTO 2-5-410 BEHIND CHOTI MASIDRavi kumar.P15-04-200830 days28-08-200827/09/20089109381678081678264
26C/o compoundwall at Rangasaipet Grave yard opp. Raman public School Rangasaipet W.No. 10Shiva Constn.07-06-200660 days02-09-200803/12/20083969993188610318861265
27C/o of Compound Wall at Medarakunta Burrial Ground at Jakkalodi Road Rangasaipet W.No.11Mallaiah. A04-02-200875 days02-09-200826/12/20086628355915250591525266
28Construction of Section I C.C Drain from H.No.2-6-1049 to 1058 at K.L.N Reddy Colony HNK Ward No.38Suresh Kumar.S18-12-200730 days05-09-200818/11/20088717576435076435267
29Construction of Section I CC drain from EP No. SP87/A/4 to 23-1-23/3 at Shayampet HNK in W.No.28Laxmi Narayana.D01-03-200830 days05-09-200820/11/20088775576613076613268
30L/o WBM Road from H.No. 2-1-541 to 2-11-511 at Vidyaranyapuri, HNK in Div.No.43Laxmi Narayana.D29-12-200730 days05-09-200805/12/20084492836672036672269
31Laying C.C.Road from Ex-C.C. Road to E.P.No.MGR - 1 at SrinivasNagar Colony, Warangal in Div.No.51Sri Venkateshwara Constructions31-03-200830 days06-09-200831/10/20088139472068072068270
32Laying of CC Road patches contruction of RCC Slab Culvert and Construction of section I CC Drain at Ram Nagar, Ward No.22Venkateshwarlu P.29-11-200745 days09-09-200831/01/20091660001275420127542271
33CONSTRUCTION OF 380MM SIZE DRAIN FROM H.NO.11-25-692, TO 685 AT KOTHAWADA, WARANGALMSR CONSTRUCTIONS08-03-200830 days10-09-200805/11/200810393881934081934272
34L/o CC Road from 22-8-162 to 165 at 148 to 151 at Doctors ColonyMSR CONSTRUCTIONS2-10-200730 days10-09-200807/11/20081516431225130122513273
35L/o WBM road from 11-29-60 to 11-24-135 at Prudvi Nagar WglMSR CONSTRUCTIONS07-03-200830 days10-09-200807/11/20081614791230230123023274
36L/o CC Road from H.No. EP No. 23/8 to WPW 23/06 at Waddepally HNkMSR CONSTRUCTIONS26-10-200760 days10-09-200807/11/20084930874296860429686275
37Desilting of Suvarage Drain from 11-24-116 to 80 feet Road Junctionto H.No.11-28-21/1 at Kothawada WGLSuresh Kumar.S04-06-200830 days10-09-200815/11/20088496379497079497276
38Desilting from existing box drain from 11-23-1083/1 to 11-23-214 at LB Nagar WglSuresh Kumar.S27-06-200830 days10-09-200817/11/20081993918175018175277
39Laying of C.C Road and Construction of C.C Drain at Laxminagar, Kareemabad Warangal in Ward No.14M/s ADLCMA CO-Op society.26-02-200875 days11-09-200816/03/20095000004395000439500279
40Construction of Compound Wall at H.No.11-22-768 at BN Rao Colony, WglSathyanarayana.B21-07-200830 days16-09-200816/06/20089256780618080618280
41Laying of C.C. Road of from H.No.17-5-160 to Exist C.C. Road atVenkateshwarlu P.18-02-200745 days16-09-200821/10/20081799571472930147293281
42Laying of C.C Road from 7-7-219 to 7-7-221 to 7-7-221 to 7-8-95 to 7-8-96 from H.No. 6-3-165 to EX C.C Road Near Machili Bazar, HNK. Ward No.27Suresh Kumar.S28-08-200630 days16-09-200819/12/20081404861220590122059282
43Laying of CC Road from 16-3-398 to Masjid at Perukawada, Wgl W.No.15M/s. ASHOKA DALITHA CIVIL AND SANITATION LCWM C & S LTD.,08-02-200860 days16-09-200804/02/20094464433953250395325283
44laying of cc road and contrction of section 2 drain rccslab colvert from 10-13-122 to main and 10-13-52 to 10-13-55 at laxmipuram warangal ward 22S.SHIVASHANKAR19-08-200930 days16-09-200819/03/20091501191329020132902284
45Laying of CC Road from St. Francis School to H.No; 25-8-7 at Bhavaninagar, Kazipet, Ward No. 33Gidde Narsaiah18-08-200860 days16-09-200815/09/20094725053878560387856286
46Laying of CC Road from 11-1-47 to 11-1-153 at SRT Colony, Wgl W.No.56Sathyanarayana.B15-04-200830 days18-09-200819/11/20089403984039084039287
47Laying of CC Road from 1121-101 to 11-21-196 at Kashibugga, Wgl W.No.3Sathyanarayana.B16-07-200845 days18-09-200819/11/20081837501606980160698288
48L/o WBM road at teacher Colony HnkM/s. P.W.L.C.Coop.Society, Laxmipuram28-01-200960 days18-09-200815/06/20092459572064030206403289
49Construction of Section I & II CC Drains in Shivanagar, W.No.17Shiva Constn.04-06-200660 days22-09-200823/12/20086563124812700481270290
50Construction of C.C Road from 5-11-1225 to 5-11-1272, 5-11-1207 and HNK 1215 at Pochamma kunta, HNK in Div.No.44M/s Mitra Constructions05-11-200745 days23-09-200807/02/20092722682419060241906291
51Laying of WBM Road from existing BT road to school of Kothagadda East Fort Wgl W.No. 09Laxmi Narayana.D26-02-200830 days25-09-200812/01/20098349867455067455292
52C/O RR MASONARY AND COSTING OF EXCAVATED EARTH FROM EM DRESSES TO SBI WARANGAL OLD BEET BAZARRavi kumar.P18-06-200630 days26-09-200819/12/20089950089483089483293
53Construction of C.C Drain from H.No.16-10-1212 to 1200 at Shivanagar, Warangal Ward No.17Shiva Constn.03-06-200860 days30-09-200804/11/20083369382479660247966294
54C/o CC Drain from H.No. 2-4-355 to existing box drain and internal drains in ram nagar police colony HNK Div. 41Shiva Constn.04-04-200660 days30-09-200803/12/20085140003845090384509295
55C/O SECTION1 CC DRAIN FROM SECTIONN2 DRAINS FROM 16-4-1435 TO 1437, 16-4-1461 TO 1466 AND 16-4-823 TO 805 AT SHIVANAGAR WGL DIV 16Shiva Constn.17-06-200830 days30-09-200817/12/20082057051527940152794296
56C/O SECTION 2 CC DRIAN FROM 16-4-965 TO 16-4-980 AT SHIVANA GAR WGL DIV 16Shiva Constn.17-06-200830 days30-09-200817/12/200813421398667098667297
57C/O SECTION1 CC DRAIN FROM 17-5-115 TO 17-5-123,AND 17-5-145 TO EPNO KWT 7/5 AT URUS AT KAREEMA BAD DIV 12Shiva Constn.04-06-200645 days30-09-200817/12/20082200001636370163637298
58C/O SECTION 2 CC DRIAN FROM 16-4-269/1 TO FORT ROAD RUDRAMABA NAGAR WGL DIV NO 16Shiva Constn.04-06-200660 days30-09-200817/12/20083633042663940266394299
59Formation of gravel Road at Mysaiah Nagar Wgl in W.No.17G.Sreedhar21-08-200815 days03-10-200829/11/20087494662313062313300
60L/O WBM ROAD FROM HNO.2-8-329 TO 2-8-329/7 AT VIJAYAPAL COLONY HNKM/s. P.W.L.C.Coop.Society, Laxmipuram05-06-200845 days03-10-200824/01/20092238521909210190921301
61L/o CC road from H.NO.2-9-583/3 to 2-09-574/1 at Sri Laxmi Nagar Colony Hnk Div.37M/s. P.W.L.C.Coop.Society, Laxmipuram01-03-200845 days03-10-200815/06/20093325632904140290414302
62Providing of SPS to CRC Building at NakkalaguttaChandra Mohan.P03-04-200815 days13-10-200810/11/20083198229156029156303
63Construction of Section I CC Drain from 19-9-220/1 to 19-9-224/1 and 19-9-220 to 19-9-217 at Nandikunta, Rangasaipet, in Ward No.11M/s ADLCMA CO-Op society.01-08-200830 days14-10-200820/04/20091363121208710120871304
64Gravel filling of pound of Burrial Ground Vaijpai Colony, HNKMAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P)12-06-200830 days15-10-200822/04/20097502957428057428305
65Laying of WBM Road from H.No.3-9-50 to End and H.No.3-9-47/1 to End of Reddy Colony, Hanamkonda in Div No.48Laxmi Narayana.D26-10-200730 days16-10-200820/11/20085997849772049772306
66Consturction of 300 mm size drain from 15-4-85/1 to 15-4-98 at Pothana Nagar, Wgl in W.No.26Laxmi Narayana.D08-03-20830 days16-10-200820/11/20088700076341076341307
67Laying of C.C. Road from H.No.15-2-248 to 15-2-249 at Ramgampet, Warangal.Laxmi Narayana.D18-03-200830 days16-10-200820/11/20086556057778057778308
68DESILTING OF SILT FROM DRAIN FROM H.NO.8-2-127 AT OLD BEET BAZAR FOR C/O RR MASONARYRavi kumar.P18-06-200630 days16-10-200819/12/20089470084917084917309
69RESTOATION OF EXISTING DAMAGED DRAIN BY C/O CC DRAIN AT LAXMI NAGAR W.NO.14GORRE AMARNATH12-08-200830 days16-10-200817/02/20099200082309082309310
70      145736771233936201233936216765
71Construction of Drain and CC Road from 11-27-1 to 11-27-75 at Kothawada in Ward No.53Laxmi Narayana.D09-10-200730 days16-10-200826/02/20091468191158890115889311
72formation of gravel road of ambedkar nagar fort road warangalSri Venkateshwara Constructions21-08-200815 days17-10-200801/11/20086456953710053710313
73formation gravel road of bhagath nagar SRR thota, Warangal Div.no.18Sri Venkateshwara Constructions21-08-200815 days17-10-200801/11/20084465037124037124314
74Restoration of Existing Damaged Drain by Construction of CC Drain Wgl in Ward No.12Mandala Suresh20-08-200830 days30-10-200819/03/200910035389984089984316
75Laying of CC Road from 5-11-793 to 5-11-789/3 at Sagara Colony, HNK W.No.44G. Sathyanarayana15-09-200845 days01-11-200823/06/20092045301852970185297317
76Attendingof petty water supply works in AE circle No.IIChandra Mohan.P20-11-200730 days05-11-200817/11/20087020681968081968318
77L/o 110 mm dia HDPE pipeline from 1-2-230 to 1-2-290 at Rahmath nagar, KazipetChandra Mohan.P20-11-200730 days05-11-200817/11/20084494641912041912319
78L/o 140 mm & UDPE pipeline from 25-08-6161 to 25-8-628 at Shanthi nagar KazipetChandra Mohan.P01-07-200830 days05-11-200819/11/20087668869903069903320
79Supply and delivery of 6 S.O.J under A.E Circle I, KazipetChandra Mohan.P12-04-200830 days05-11-200819/11/20084956545176045176321
80Laying of C.C Road near Pochamma Temple at Pochamma Kunta, HNKNaresh Kumar.D12-06-200830 days05-11-200808/12/20089886087680087680322
81Laying of c.C. Road and Section - I C.C. Drain H.No.5-11-1003 to 5-11-100 Pochammakunta, HnkNaresh Kumar.D12-06-200830 days05-11-200808/12/20083754533323033323323
82Restoration of 200 mm dia HDPE pipeline at Opp. Solar Tailors Deshaipet Road Wgl.Chandra Mohan.P15-07-200830 days05-11-200810/12/20084189738222038222324
83Repairs to central deviders at Naidu Petrol PUmp Junction at WglChandra Mohan.P15-07-200830 days05-11-200810/12/20087075234992034992325
84repairs to existing central dividers at naidu petrol pumpChandra Mohan.P30-06-200830 days05-11-200811/12/20083800034992034992326
85Arresting of Leeakeges in Various Locations in Div.No.12 to 14 and 19, 25 and 2 at Kareemabad, WglChandra Mohan.P25-07-200830 days05-11-200811/12/20085000045571045571327
86Laying of 200 mm HDPE pipe Line and Filling of S.V.S at Behind REC Bus StopChandra Mohan.P02-08-200830 days05-11-200811/12/20088670379025079025328
87engage of lasour for alge andngrossin bhdrakali wglChandra Mohan.P12-11-200715 days05-11-200807/01/20091992518632018632329
88Arresting of leakages on 900 mm dia and 600 mm dia pipeline at Desaipet road Autonagar, Warangal.Chandra Mohan.P05-01-200830 days05-11-200812/01/20093792434645034645330
89GRAVEL FORMATION AND FILLING FOR POT HOLES INTERNAL ROADS AT RAHAMATH NAGAR KAZIPETKumaraswamy. B25-07-200830 days05-11-200812/01/20093989333151033151331
90filling of fut holds with gravel and awary dust at somidi village on he occationof pochamma festivalsKumaraswamy. B23-08-200830 days05-11-200812/01/20093900031666031666332
91Restoration of damaged existing road by formation of gravel road from H.no.12-8-213/4 to road end of Santhoshmatha Wgl in ward no. 19M/S SAI KRUPA ENTERPRISES20-08-200830 days05-11-200804/03/20096973257932057932333
92Gravel formation from H.No.1-1-123 to E.P.Ro TCK 12/6 at Kapornaik thanda Kzp in Ward (36)Kumaraswamy. B02-08-200830 days05-11-200823/03/20098341969320069320334
93Removal of Alge and Race from Bhadra Kali SS Tank at WglChandra Mohan.P19-05-200830 days05-11-200811/06/20097554070754070754336
94Providing and placing of syntax tanks at Mini Municipal Corporation, Kazipet Kumaraswamy. B20-08-200830 days05-11-200816/06/20095767552301052301337
95Laing of WBM Road from H.No.2-10-284 to H.No.2-10-361 at Teachers Colony Phase-II Hanamkonda in Div.No. 37VCR ASSOCIATES21-04-200830 days05-11-200825/10/20092503001799050179905338
96Construction of Compound wall and room at Rangasaipet Reservoir Rangasaipet Warangal in Ward No.10P. Lavakusha Reddy24-08-200660 days05-11-200809/11/20093992103445900344590339
97C/o Sec-I & II CC drains in Shivanagar W.No.17Mallaiah. A26-02-200830 days06-11-200827/12/20086563124812700481270340
98Construction of CC Drain and Laying of CC Road at Kareemabad Wgl in Ward No.13Mallaiah. A28-02-200875 days06-11-200828/03/20096158475523560552356341
99Laying of C.C. Road from 1123 - 2383/1 to 11-23-2388 at Navayuga Colony, Warangal In Ward No.2DAYAKAR.G19-08-200830 days06-11-200809/04/20091388261242590124259342
100L/o WBM Road from Annapurna complex to Anganwadi Drain V.Nagar Colony Kareembad Wgl in W.No. 15Mallaiah. A28-02-200830 days06-11-200821/05/20091541381305460130546343
101L/o CC road from EP.No.65 to H.No. 10-13-33 at laxmipuram, Warangal ward. 22Komuraiah.S26-08-200830 days10-11-200831/12/20089947887766087766344
102Construction of CC Road from Opp: 11-3-79 to 11-1-289 and WBM Road and Construction of CC Drain in SRT Colony, Wgl D.No.6Komuraiah.S12-03-200860 days10-11-200814/05/20094922204348270434827345
103PROCURMENT OF TREE GUARDS IN WGL COPPORATION LIMITSadanandam. B28-08-2008 11-11-200824/07/20081375001285770128577346
104Laying of C.C. Road from Rangaiah Taddy shop to Railway gate at Kareembad, wglSri Venkateshwara Constructions11-10-200760 days12-11-200810/12/20082796442420170242017347
105laying of cc road from H no 16-1-670/1 at srr thota wgl ward no 18Sri Venkateshwara Constructions17-09-200875 days12-11-200810/12/20085645344792310479231348
106Laying of WBM Road and C.C Road from 16-3-461 to 498 and 16-3-504 to 511 and 16-3-985 to Landry Shop and 16-3-1052 to 1048 and Div.No.15Preethi Const.20-08-200890 days12-11-200831/12/20087582916313000631300349
107Laying of CC Road from 11-19-142 to 11-19-128 at Kashibugga, Wgl W.No.3Sri Venkateshwara Constructions26-08-200860 days12-11-200815/01/20093384992901450290145350
108contrution of section1 cc drain from H. NO 14-6-26 to 14-6-191 and 14-6-42 to 14-6-185 opp 14-6-20 to 14-6-137 at nizam pura warangal ward no 23Sri Venkateshwara Constructions19-08-200845 days12-11-200807/03/20092052481679150167915351
109C/o of SEC- 1 and II CC Drain from 16-4-1290 to Ex-Transformer at other placer Bhupesh Nagar Warangal in Ward No. 16Preethi Const.16-07-200875 days12-11-200827/04/20095007203859130385913352
110Construction of CC Drain and Laying of CC Roads at Kareemabad, W.No.14Sri Venkateshwara Constructions20-08-200875 days12-11-200824/07/20095363594292910429291353
111CONSTRUCTIONOF 300 MM SIZE DRAINGES FROM H.NO.11-25-517 TO 11-25-433 AT KOTHAWADA, WGL WARD NO.52Sri Venkateshwara Constructions28-07-200845 days13-11-200821/12/20081650001317020131702354
112Construction of CC Drain 300 mm size from EP No. P KM 14/1 to 11-26-167 at Kothawada, Wgl W.No.51Sri Venkateshwara Constructions28-07-200845 days13-11-200824/12/20081850001480550148055355
113Laying of C.C Drain from H.No.25-6-358 to 25-6-363 at VishnupuramNaresh Kumar.D02-11-200730 days14-11-200829/11/20081262771027980102798356
114Laying of C.C Road from 5-11-743 to Static Tank at HNKNaresh Kumar.D05-11-200745 days14-11-200831/12/20082708042332760233276357
115Restoration of Existing damaged drain by construction of CC drain of Bakshima halla W.No.13Srinivas. B12-08-200830 days14-11-200804/03/20099700085106085106358
116Restoration of Existing Damaged Road by formation of gravel road at 18-3-51 to 255 at Harijanawada Ward.No.13Srinivas. B20-08-200830 days14-11-200804/03/20099778181243081243359
117Construction of C.C Drain from H.No.2-1-493 to 4-1-495/1 at 100 feet roadMAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P)02-08-200830 days14-11-200822/04/20095259446985046985361
118Laying of CC Road and Drain from 2-1-788 to 2-1-789/1and 2-1-794 to 2-1-801 at Laskhar Singara, HanamkondaRamesh.B07-03-200875 days14-11-200816/10/20091699581470730147073363
119Laying of C.C Road from H.No.2-12-310/2 to 2-12-315/1 at Vidyaranyapuri, HNk in Div.No.43Naresh Kumar.D21-01-200865 days14-11-200803/12/20092626152298580229858364
120Construction of Section -II CC Drain from 3-5-44 to 3-5-66 at Gudi Bandal, Hanamkonda in Division no.47MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P)28-08-200830 days14-11-200810/12/20094793743069043069365
121impervious coatto the 300 hp and 75 hp pump houses roof slab at kuc filter bed, HNK.M/S SAI KRUPA ENTERPRISES29-03-200830 days15-11-200807/01/20096729760875060875366
122filling of potholder with gravel at bhavani nagar on shanthi nagar on occation of pochamma festival ward no 33Kumaraswamy. B20-08-200830 days15-11-200812/01/20094057133713033713367
123Laying of HDPE Pipe Line from 19-1-146 to Kapuwada at Rangasaipet, Wgl in W.No.11Suresh Kumar.S18-10-200860 days15-11-200824/01/20093810003255040325504368
124C/O SEC I & II CC DRAINS AND F/O GRAVEL ROAD FROM 19-6-10 TO KMM MAIN ROAD AT RANGASHIPET W.NO.10MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P)20-08-200830 days15-11-200824/03/20098049570518070518369
125Uprooting the Ex-160mm dia HDPE pipe line and laying and jointing at Rudramamba Nagar Warangal in Ward No.16MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P)20-08-200815 days15-11-200817/07/20091500012517012517370
126RESTOR ACTION OF EXISTING DAMAGED DRAIN BY C/O OF CC DRAINS BAKKIWADA WGLMAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P)20-08-200830 days15-11-200831/08/20099914888975088975371
127Development of Burrial Ground in Ward No.6 at Labour Colony, Warangal SATISH KUMAR . N20-08-200875 days17-11-200815/07/20095474854843190484319372
128Formation of Gravel Road and WBM Roads at W.No.13P. Lavakusha Reddy28-07-200830 days19-11-200818/07/20094535153625650362565373
129C/O CC DRAIN FROM HNO 5-11-1362 TO 5-11-1395 AT SAGAR COLONY WARD NO 44Srinivas. B30-08-200645 days20-11-200831/12/20082187121791800179180374
130Construction of Section II CC Drain from 2-7-1009 to 2-7-1008/2 at Kanakadurga Colony, HNK, D.No.39Sampath Rao.K28-06-200830 days21-11-200812/06/20092698823710023710375
131Construction of Compound wall and burning plat form arround the burrial ground at For Warangal petrol pump, Warangal in Ward No. 10 ( General Budget)MSR CONSTRUCTIONS24-08-200775 days21-11-200807/07/20094413853692550369255376
132Laying of CC Road and construction of Section-I CC Drain from H.No. 19-11-46 to 19-11-73 and 19-11-33 to SPK 24/4 at Shambunipet, Warangal in Div.No.10MSR CONSTRUCTIONS29-08-200775 days21-11-200820/11/20093113552833640283364377
133Laying of CC Road from Opp: 2-7-1233 to 2-7-1238 at Excise Colony, Hanamkonda in Div. no. 39Sanjeev. G08-06-200845 days22-11-200829/08/20092555892092780209278378
134Laying of CC & WBM Road from H.No. 2-6-1070/1 to 2-6-1099/2, 2-6-1075, 2-6-1076 at KLN Reddy colony Hanamkonda in Div.No.38Sanjeev. G05-06-200831 days22-11-200823/11/20096611205521360552136379
135C/o Section II CC Drain at Vambay Scheme Houses Kashikunta Wgl W.No.11-13-15MSR CONSTRUCTIONS28-07-200775 days25-11-200812/01/20097450475857590585759380
136Laying of CC Road from 16-10-14 to 16-10-72 at Shivanagar, Wgl W.No.17P. Jagadeeshwr Rao13-04-200660 days25-11-200825/04/20095838904989040498904381
137C/O SECTION - I CC DRAIN FROM HNO. 1- 7-753 TO 1-7-654 AT SHANTHI NAGAR HNK DIV.NO.29M/s. P.W.L.C.Coop.Society, Laxmipuram20-08-200845 days27-11-200813/03/20091581411371070137107382
13840 CC ROAD FROM HNO.2-5-340 TO HNO 2-5-242 AT NAKKALA GUTTA BEHIND CULVER ROAD HNK W.NO.M/s. P.W.L.C.Coop.Society, Laxmipuram20-09-200860 days27-11-200813/03/20092587272311640231164383
139L/O WBM ROAD FROM HNO. 23-6-111 TO 23-6-129/40 AT DARGA COLONY HNK DIV.NO.28M/s. P.W.L.C.Coop.Society, Laxmipuram12-08-200860 days27-11-200813/03/20095799604637490463749384
140L/O CC ROAD FROM HNO.1-8-143 TO APNO 29 BSMQ90 AT BALASAMUDRAM HNK W.NO.40M/s. P.W.L.C.Coop.Society, Laxmipuram15-10-200860 days27-11-200813/03/20094078753644640364464385
141Laying of WBM Road from H.No.1-7-885/4 to 1-7-885/9 at Nandi Hills, HNK Div No.29M/s. P.W.L.C.Coop.Society, Laxmipuram20-08-200860 days27-11-200813/03/20093887643101060310106386
142Laying of CC Road from H.No. 10-10-126 to 14-8-209/1 and Construction of RCC culvert in various places in Ward.No.22Komuraiah.S27-08-200860 days27-11-200820/11/20094049323614780361478387
143Laying of WBM Road from H.No. 2-8-573/1/3 to EP.No.ING 13/10/6, H.No. 2-8-688 to 2-8-689 at Indira Nagar, Hanamkonda in Div.No. 38Sanjeev. G15-07-200860 days27-11-200824/11/20092483891989360198936388
144C/o CC DRAIN from 11-29-233 to 11-29-227 at Rammanthapuri Wgl W.No.53Shiva Constn.04-06-200830 days28-11-200821/05/20091549921156440115644389
145Construction of Pipe Culverts and 300mm size CC Drain from 11-28-251/1 to 246 and 11-28-263 to 267 at Thummalakunta, Warangal W.No.53M/s Dalitha Labour Contract Co-operatice Society, Wgl28-07-200860 days01-12-200807/09/20093411983000150300015391
146Laying of WBM Road from EP no. LSP 26/1 to 2-2-31 and 2-2-32 to 471 at Rajaji Nagar, Hanamkonda in Ward.No. 42M/s Dalitha Labour Contract Co-operatice Society, Wgl17-09-200860 days01-12-200823/11/20093287722772900277290392
147Laying of WBM Road from Opp: 2-8-328 to 2-8-320/2 at Vijaypal Colony, HNKSanjeev. G20-09-200830 days03-12-200816/06/20092106411697090169709393
148Construction of CC Drain from EP No. BES 6/12 to 2-8-573/1/3 at Indiranagar, HNK D.No.38M/s. P.W.L.C.Coop.Society, Laxmipuram03-08-200860 days03-12-200830/06/20094599924005320400532394
149sleeping of puthold work at duga shivar on occaction of ramzan festival ward no 31Kumaraswamy. B29-09-200830 days11-12-200812/01/20092050917062017062395
150Gravel filling on the occasion of bathukamma festival at bodagutta kazipet W.No. 32Kumaraswamy. B07-11-200830 days11-12-200819/03/20094307735836035836396
151Filling pot house with gravel at Edgah Kazipet on Occassion of Ramzan festival in W.No.35Kumaraswamy. B30-09-200830 days12-12-200805/01/20091485312357012357397
152Construction of 300 mm and 380 mm side CC Drain from 11-24-285 to 494 & 11-24-229 to 374 at Pochamma maindan, Harijanawada, WglHLCCS-Rangampet28-07-200860 days17-12-200824/02/20093296092760590276059399
153Construction of Section I and II CC Drain from 17-10-62 to 17-10-68, 17-10-78 and other places Ursu, Kareemabad, Wgl in Ward No.12Mandala Suresh20-08-200860 days17-12-200819/03/20094250003266840326684400
154Construction of Section I CC Drain at Fort Wgl East Fort, Wgl in Ward No.9Mandala Suresh20-08-200860 days17-12-200806/04/20093032012381950238195401
155Dismentalling of collapsed old building at beside Municipal Office, WarangalNaga Raju T20-10-200830 days17-12-200811/04/20098500075388075388402
156Laying of WBM Road and Construction of Section I CC drain from 16-3-1088/1 to 16-3-1057 at Ambedkar Nagar, W.No.15M/s Sri Nagamaiah WLCPSSS LTD20-08-200860 days17-12-200806/05/20093119612718800271880403
157L/o cc Road from 16-1-147 to 138 and 16-1-430 existing culvert and 16-1-33 to 16-1-26/1/19 SRR Thota Wgl Div.No.18M/s Sri Nagamaiah WLCPSSS LTD20-08-200875 days17-12-200821/05/20095457024881290488129404
158C/o CC Drain from 2-7-976 to 2-7-669 on Excise colony main Road at Hanamkonda in Div.No.39Sampath Rao.K16-07-200875 days17-12-200812/06/20099884087055340705534405
159Laying of CC Road and C/o of CC Culvert at Karimabad.M/s Sri Nagamaiah WLCPSSS LTD20-08-200860 days17-12-200819/07/20095327614699880469988406
160Construction of RCC Slab Culvert at Pochamma temple, Sakarasikunta, Warangal in Ward no.18Komuraiah.S23-08-200875 days18-12-200808/06/20096573175883920588392407
161Leveling of Ground at Various Locations in Div No.30 for the accession of Bathukamma FestivalRavinder Rao A09-10-200830 days23-12-200806/10/20093400028023028023408
162GRAVELWBM ROAD FROMSDM LHS 26/1Chandra Mohan.P13-08-200830 days24-12-200821/04/20099423279839079839409
163Levelling the ground at various locations in Div.No.37 for the Occassion of Bathukamma FestivalRavinder Rao A05-10-200830 days24-12-200826/05/20092910424212024212411
164Laying of CC Road from 5-11-1362 to 5-11-1395 at Pochammakunta Hanamkonda in Ward.No.44Srinvias P28-08-200845 days24-12-200815/09/20092530002240390224039412
165Construction of Boundary pillars from Warangal Municipal Corporation open places in Warangal at Shivangar, Ursu and Kareemabad Ward No. 12,17 and 18 (10% open spaces Budget)Ravi kumar.P05-11-200760 days24-12-200820/10/20095014745749045749413
166CONTRUCTION OF DETAINING WALL AT LGHLSH 26/1 AT RAJALINGAM HNKChandra Mohan.P13-08-200830 days29-12-200821/04/20098638376618076618414
167L/o CC Road from H.No. 11-22-822/13 to & 21 and 11-22-823 at Madinaveedi Wgl Div.No.3Sathyanarayana.B20-08-200975 days02-01-200913/04/20094679074005690400569415
168Laying of CC Road from K & M 50/2/3 to 11-22-821 and 11-21-99 at Kashibugga, Wgl in Div No.3Sathyanarayana.B30-10-200860 days12-01-200928/02/20094148273551350355135417
169Laying of CC Road from H.No.1-8-452 to 1-8-450 at Balasamudram Hanamkonda in Ward.No.40Chandra Mohan.P30-07-200830 days12-01-200926/10/20091366131182650118265418
170Laying of CC Road from H.No. 2-8-582 to EP No. ING 13/8/1 and H.No.2-8-493 to EP No. ENG 15 at Indira Nagar, Hanamkkonda in Div.No.38Chandra Mohan.P27-10-200845 days12-01-200926/10/20091793721584290158429419
171L/o of CC Road and WBM Road from 7-2-17 to 95 Machilibazar, HNKRajendra Prasad29-07-2008105 days16-01-200922/06/20099836908471360847136420
172L/o of CC Road and WBM Road from 6-4-135 to 127 at Machilibazar, HNKRajendra Prasad29-07-2008105 days16-01-200922/06/20099456528152750815275421
173Laying of Metal Road Chinthal W.No.7MSR CONSTRUCTIONS17-10-200860 days17-01-200910/06/20094760003739380373938422
174Construction of Section -I and II CC Drain and Laying of CC Road at Kareemabad, Warangal in Ward.No.14V. Yadagiri08-11-200960 days17-01-200929/09/20094839924308410430841423
175Laying of CC Road from H.No.1-9-957 to 1-9-1080/1 at Postal Colony Hanamkonda in Div.No.30M/s M/s WLCCS Ltd., Prakash Reddypet (V. Srinivas)09-01-200945 days21-01-200909/02/20092439932176780217678424
176Laying of RCC slab on existing box drain at H.No. 11-23-602 at LB Nagar Warangal in Ward.No.3DAYAKAR.G28-11-200830 days23-01-200920/11/20099755287859087859425
177L/o CC road from 11-23-1997 l3 to Jyothi Balamandir School at Lb Nagar Warangal ward (2)MSR CONSTRUCTIONS12-08-200860 days24-01-200925/04/20094935224303200430320426
178L/o CC Road from 11-23-1306 to 1364 and 11-23-1516 to 1509 at Lb nagar warangal ward (2)MSR CONSTRUCTIONS12-08-200825 days24-01-200925/04/20096580085735400573540427
179Filling of gravel road and leveling the ground at Sahnthi Nagar in W.No.1 Warangal DAYAKAR.G28-11-200845 days25-01-200925/11/20092267618864018864428
180laying of CC Road from EP No.TBS 36 TO H.No.2-6-96 at Shanthi Nagar, Hanamkonda in division no.38Ch. Ramapathi Rao20-08-200845 days27-01-200911/04/20091855531603330160333429
181C/o of Brick Mansonary and C/o of Section I CC Drain at 15-6-2005 Static Tank Papaiahpet Wgl in Ward No.25S.SHIVASHANKAR12-02-200930 days27-01-200924/06/20091720001537450153745430
182Laying of CC Road from 5-4-107 to 5-4-33 at Bommathiwada, Hanamkonda in Ward No. 47MSR CONSTRUCTIONS30-09-200845 days27-01-200909/10/20091683731505790150579431
183Laying of WBM Road from H.No. 2-8-31/2 to 2-8-255 at Waddepally, Hanamkonda in Div.No.38Ch. Ramapathi Rao20-08-200845 days27-01-200926/11/20091525831224750122475432
184laying of cc road from H. 11-22-531 to 98 at kashibugga warangal in div no 5Sathyanarayana.B28-08-20085 days28-01-200925/02/20095084874353190435319433
185Laying of C.C. Road from Opp Kazipet SR to H.No.25-4-391 at Vishnupuri Kazipet in Ward No.35Kumaraswamy. B09-01-200930 days28-01-200920/03/20099185481913081913434
186Gravel filling on the occassion of Bathukamma festival at bund kazipetKumaraswamy. B07-10-200830 days28-01-200920/03/20094885040640040640435
187Laying WBM road from H.no.24-7-289 to 24-07-269 at Ramakrishna Colony KazipetKumaraswamy. B20-08-200845 days28-01-200920/03/20091470001122360112236436
188Laying of WBM Road from Punnami Guest house to H.No.1-1-76 at Chaitanyapuri Kazipet Div.No.36.Kumaraswamy. B28-07-200845 days28-01-200931/03/20091497341126230112623437
189L/O C.C ROAD CD C/O CC DRAIN FROM 25-6-225 TO 25-6-223 AND 238 AND 25-6-265 TO END OF LANE AT VIDYA NAGAR KAZIPET DIV.NO.35Kumaraswamy. B20-08-200845 days28-01-200923/05/20092740002315510231551439
190LAY OF CC ROAD FROM 1-6 -2 TO 25-6-266 AND 25-6-295 AT ARYA NAGAR KAZIPET,DIV. NO.35Kumaraswamy. B28-08-200860 days28-01-200923/05/20093460002917710291771440
191ARRESTING OF LEAVINGS IN VARIOUS OCCATION UNDER AE CIRCLE NO.I KAZIPET IN WARD NO.31 TO 36Kumaraswamy. B22-11-200830 days28-01-200923/05/20095928754049054049441
192Laying of WBM Road from H.No.23-6-124/2 to E.P.No.HRS/8/10/S at Durga Colony, HNKM/s. P.W.L.C.Coop.Society, Laxmipuram02-07-200860 days28-01-200915/06/20092414822041480204148442
193Laying of WBM Road at Bank Colony HanamkondaM/s. P.W.L.C.Coop.Society, Laxmipuram03-07-200860 days28-01-200915/06/20091619321378060137806443
194Laying of CC Road and construction of CC Drain from 25-4-445 to 534 and construction of CC Drain from 25-4-346 to Somidi Road, Kazipet in Div.No.35Kumaraswamy. B20-08-200830 days28-01-200928/07/20094207013728670372867444
195Laying of WBM Road from 25-8-686 to Pochamma Temple and 25-8-630/2 to 25-8-23/2 at Bhavani Nagar, Kazipet in Div.No.33Kumaraswamy. B20-08-200830 days28-01-200928/07/20092200031829980182998445
196Laying of WBM Road and Construction of CC Drain from H.No. 1-2-227 to 1-2-290 at Rahmath Nagar, Hanamkonda in Ward.No.36Kumaraswamy. B25-07-200845 days28-01-200928/07/20091516861292490129249446
197Laying of CC Road from 25-8-346 to 25-9-7 and 25-8-175 to 25-8-156 at Bapuji Nagar (South), Kazipet in Div.No.33Kumaraswamy. B20-08-200845 days28-01-200928/07/20091556981375990137599447
198Laying of CC road from 25-8-616/1 to 628 and 25-8-623 to 680 at Shanthinagar, Kazipet in Div.No.33Kumaraswamy. B20-08-200830 days28-01-200928/07/20091670371471430147143448
199Laying of CC Roads and Construction of CC Drains in internal lanes at Somidi, Kazipet in Ward.No.34Kumaraswamy. B03-10-200860 days28-01-200916/09/20092447792092880209288449
200Laying of CC Road and Construction of Section-I CC Drain from H.No.24-4-98 to 24-4-92 at Beem Nagar, Darga Kazipet in Div.No.31Kumaraswamy. B20-08-200830 days28-01-200916/09/20091359121143640114364450
201Laying of WBM Road and CC Road at Balasanthawada Internal Lanes Darga Kazipet in Div.No.31Kumaraswamy. B20-08-200875 days28-01-200916/09/20094193903423290342329451
202Dismantling and re-laying of RCC bed blok on suplus wear gap portion at Kapuwada side, HNK Chandra Mohan.P25-02-200930 days28-01-200919/09/20093800034382034382452
203Laying of 200 mm dia HDPE Pipe Line from Balanjaneyaswamy Temple to H.No.7-1-389, Div No.28, HnkRavinder Rao A10-09-200730 days04-02-200908/05/20089830887583087583453
204L/o CC Road from Poola Rangaiah Taddy Shop to Railway GAte at Kareembad WglSri Venkateshwara Constructions09-01-200745 days04-02-200917/03/20092596632329670232967454
205L/O OF CC ROAD GRAVEL 16-1-262 TO 373, 16-1-380 TO 386AND 17-2-291/3 AT SRR THOTA WGLSri Venkateshwara Constructions16-07-200860 days04-02-200931/03/20095084344384870438487455
206ENGAGE THE JAB ON THE BASIS IS FOR EXCAVTION AT 80'FT ROAD LIST DISMENTALED BEDSIS 80 ROAD AT LAXMI PURAMSuresh Kumar.S05-12-200815 days04-02-200931/03/20094205039321039321456
207TRANSPORTATION OF DISMENTALLED DEFRIS AND EX CULVERTS SOCIETY ON 80"ROAD AT LAXMI NAGARSuresh Kumar.S05-12-200815 days04-02-200931/03/20093593033598033598457
208L/O CC ROAD FROM 16-3-1030/2 TO 16-3-1030/10 AT KAREEMABAD ROAD W.NO.15Sri Venkateshwara Constructions16-07-200860 days04-02-200906/04/20091530851370900137090458
209Laying of granite stone to the exesting shubhas chandrabose statue g r gutta wglChandra Mohan.P17-07-200830 days04-02-200919/05/20096684560939060939459
210Laying of CC. Road from 11-22-254 at Kashibugga, WglSuresh Kumar.S04-06-200945 days04-02-200904/06/20094078963646470364647460
211Laying of CC Road from EP No. SNG 4 to 2-9-490 at Sri Nagar Colony, HNKRavinder Rao A19-01-200845 days04-02-200916/06/20091412421231260123126461
212Laying of CC Road from 22-8-192 to 144 at Ward No.53M. Anjaneyulu28-07-200860 days04-02-200930/06/20092620023686023686462
213C/o of CC Road from H.No.10-13-345 to Weight Bridge at Laxmipuram in Ward No.22Komuraiah.S25-07-200890 days04-02-200906/12/20099200007969250796925464
214Laying of CC Road from H.No.2-9-176/2 to 2-9-166/3 at Vikas Nagar, HNK D.No.37Ravinder Rao A13-03-200845 days05-02-200926/05/20091584981384150138415465
215L/o CC Road from EPNO.SN 58 to 1-9-1182 at Sahakar Nagar Hnk Div.No.30Naresh Kumar.D20-12-200745 days05-02-200904/06/20092954722572780257278466
216L/o of CC Drain at Venkatrao Nagar, Ram NagarK. Raghupathi Reddy05-10-200830 days05-02-200914/07/200910000098526098526467
217Laying of 140mm dia HDPE pipeline from 3-8-95 to EPNO.4 at Kumarpally near Mandivada, Hnk in Div.No.47Govardhan Reddy.G15-10-200845 days05-02-200924/09/20091662971518710151871469
218Construction of 900mm box drain from H.No.2-1-25 to Sammaiah Nagar, cause way to Saraswathi Nagar HNK in W.NO.42Chandra Mohan.P01-09-200875 days05-02-200926/09/20094906574358960435896470
219Construction of Section -II CC Drain from Bhavani Tent House to H.No.16-3-874 at Khammam Road Warangal inWArd.No.15Ajay Dalitha LCCS Warangal08-11-200845 days05-02-200920/11/20093604323222520322252471
220L/o 200mm dia HDPE Pipe line at Div.No.28Chandra Mohan.P -09-200875 days05-02-200920/11/20095734855080200508020472
221blindage to existing gurbage at rangaleela maidanam dasara festival kareemabadSadanandam. B18-09-200830 days07-02-200918/04/20097806598065098065473
222leveling teh ravane vadha plot from rangaleela maidan kareema badSadanandam. B18-09-200830 days07-02-200918/04/20098463266668066668474
223Building for existing WBM Road at Dasara FestivalSadanandam. B18-09-200830 days07-02-200905/06/20096428053477053477475
224Repairs to existing drains at H.No.17-3-51/2 and at other places at Kareemabad, Warangal in W.No.12G.Sreedhar16-10-200830 days08-02-200920/11/20097846269846069846476
225Arrestings leakages on 6 dia to 24 dia pipe linein various locations in Ward (W.No.43) (45) to (49) AE Circle IV HNKVenkateshwarlu. Ch25-09-200830 days13-02-200904/05/20099837089679089679478
226C/O COMPOUND WALL AT MUSLIM GIRLS HOSTAL AT BOKKALAGADDA LASKHAR BAZAR HNK WARD NO 45Suresh Kumar.S24-01-200930 days14-02-200906/04/20092495482215990221599479
227Arresting of leakages on 6 dia to 24 dia pipeline in varous location in Ward No.43,45 to 49 AE Circle HNKVenkateshwarlu. Ch16-09-200830 days14-02-200904/05/20099887990146090146480
228Supply of Msclomp sets and improvement of H2o Supply etc in HNK AreaVenkateshwarlu. Ch30-12-200815 days16-02-200918/04/20095896653756053756481
229Laying of Cc Road patches from WMC complex to susheela devi school 8/8/12,8/9/12 SRW 24 at Axis bank and EM Dress to JPRN 55/11 JPN 8/55 ED 14/5/1 and SBI to SRN 33/PV 8/4/86 8/4/96 in Div.No.21Ravi kumar.P30-08-200830 days17-02-200915/09/20096575005742890574289482
230Formation of Gravel Road at Jyothi Colony, Warangal in Ward No.18M/S SAI KRUPA ENTERPRISES26-09-200815 days18-02-200919/10/20094725539578039578484
231Laying of Gravel Road from 19-9-317 to 19-9-346/C at Nagendra Nagar, Warangal in Ward.No.11Srinivas. B17-09-200830 days18-02-200920/11/200910236885686085686485
232Construction of Section I Drain from 2-12-65 to Ramaiah Plot and 2-12-63 to 2-12-64 at Vayuputra Colony, Hanamkonda in Ward.No.43M/S SAI KRUPA ENTERPRISES17-09-200830 days20-02-200917/11/20099464083038083038486
233Laying of CC Road from Main Road to End of the Lane at Puppalagutta, Wgl W.No.7M/S SAI KRUPA ENTERPRISES17-02-200930 days21-02-200907/02/20091619331442930144293487
234Restoration of Existing Damaged Drains by construction of CC Drains at Ursu, Prathapa Nagar, W.No.12M/S SAI KRUPA ENTERPRISES25-02-200930 days21-02-200907/02/20099723386946086946488
235Construction of RCC Stair Case at Camp Office, Public Garden, HNKSrinivas. B10-11-200830 days21-02-200914/03/20099975090680090680489
236Appling of Potty inside of rooms of Commissioner Residence at Camp Office, Public Garden, HNKSrinivas. B24-10-200830 days21-02-200914/05/20099984491204091204490
237Filling of Big Pot holes and side berms with hard gravel from Govt. Junior College Junction to bus stand Jonc due to CM ProgrammeSrinivas. B13-08-200830 days21-02-200914/05/20098990275296075296491
238Providing of pointing commissioner quarters situated at Public Garden HNKSrinivas. B20-12-200830 days21-02-200908/06/20099962091000091000492
239laying of cc road from EP.No SRT 7/11/2 to 17/2/336/1 jyothi nagar warangal ward no 18Sri Venkateshwara Constructions19-01-200945 days23-02-200906/04/20092045081832210183221494
240C/o of CC Road from H.No.11-28-241/1/1 to 272 at Thummalakunta, Ward No.53Sri Venkateshwara Constructions19-01-200960 days25-02-200920/01/20095200004716140471614495
241C/o CC Drain from H.No. 2-4-1535 to EP No. ASC 15 at Ashok Colony HNK in Div. (41)Srinvias P17-02-200915 days26-02-200927/02/20092259831982810198281496
242Laying of C.C Road at Tejaswi School at Naimnagar, HNK in Ward No.44Srinvias P17-02-200930 days26-02-200928/02/20095599249960049960497
243Construction of 300mm size drain from H.No.11-28-260 to FBC 55 and 22-8-210 to 276 and internal lanes at Thummalakunta and Mainarity Colony, Warangal in W.No.53Sanjeev. G19-01-200960 days26-02-200908/04/20094148483666930366693498
244C/o 300 mm size drain from H.No. 11-30-58 to 11-30-64 and 11-28-233/B at thumalakunta, Warangal in w.No.53Sri Venkateshwara Constructions03-02-200930 days26-02-200908/04/20099000079633079633499
245GRAVELFORMATION AND LAYING OF 450 PIPES AT VIDYANAGAR HNKChandra Mohan.P18-10-200830 days26-02-200921/04/20096286852617052617500
246GRAVEL FORMATION L2J OF CROSS PIPES FROM 80`ROAD VIJAYACOLONY AT HNKChandra Mohan.P18-10-200830 days26-02-200921/04/20094431038875038875501
247providing of blindage to damaged approch roads to rangaleela maidanam kareema bad warangalSadanandam. B18-09-200815 days26-02-200901/05/20096000050680050680502
248LAYING OF CC ROAD 16-6-94 TO 16-5-67 AT PERUKAWADAChandra Mohan.P30-11-200830 days26-02-200902/05/20099934189029089029503
249LAYING OC CC ROAD 16-6-193 TO EPPKW2AT PERUKAWADA WGLChandra Mohan.P09-12-200830 days26-02-200902/05/200910244991259091259504
250Laying of CC Road from 16-6-195 to Opp: Masjid at Perukawada, Wgl W.No.17Chandra Mohan.P08-12-200830 days26-02-200902/05/200910146690752090752505
251Laying of CC Road from 16-6-185 to 16-5-83 at Perukawada, W.No.17Chandra Mohan.P09-12-200830 days26-02-200902/05/200910148790868090868506
252Supply and filling of Sand at Childrens park equipments in Public Garden, Hnk in ward no 46Venkateshwarlu. Ch17-02-200930 days26-02-200908/05/20096906956557056557507
253s & d of doors at beside wmc wglChandra Mohan.P30-12-200830 days26-02-200911/05/200910197693148093148508
254interpainting to the to the newly sheeds at wmcChandra Mohan.P30-12-200815 days26-02-200911/05/20094460940747040747509
255contruction ceramic tiles fooling in rooms at wmcChandra Mohan.P30-12-200830 days26-02-200911/05/20099532587296087296510
256scd of windows at nely proposed sheds at wmcChandra Mohan.P30-12-200830 days26-02-200911/05/20099042085735085735511
257contruction 110mm hdpe pipe line 14-7-72 WP34/1/2 to 14-7-65 to 14-7-62 at Nizarpuram.wglChandra Mohan.P01-01-200930 days26-02-200911/05/20094529141369041369512
258contructionof RRmasom & G/Gat newly constration wmcChandra Mohan.P30-12-200830 days26-02-200911/05/200910350689697089697513
259contructioncbs in rooms and dobby at new construction at wmcChandra Mohan.P30-12-200830 days26-02-200911/05/20099447787327087327514
260Shiftting Modifications to colouring and replacement of Gandhi Statue PerukawadaChandra Mohan.P21-01-200930 days26-02-200918/05/200910331492698092698515
261contruction of parking tiles to subash statue junctionat govindrajula gutta wglChandra Mohan.P03-01-200930 days26-02-200919/05/20098972381367081367516
262D/o of 75 mm HDPE Pipe Line from H.No.25-11-27 Community Hall Bapuji Nagar, KzptChandra Mohan.P09-09-200830 days26-02-200919/05/20093535832297032297517
263Construction of C.c. Road from H.No.1-9-992 to E.P.No.PCS13/11, 1-9-1016 at postal colony, Hnk, Div.No.36Laxmi Narayana.D18-08-200875 days26-02-200902/06/20095521354816940481694518
264Constructionof CC Road from H.No.1-7-124 to 1-7-117, 1-7-95 to 1-7-85 at Widows Colony, HNK Div No.29Laxmi Narayana.D12-02-200845 days26-02-200902/06/20092479522221080222108519
265Construction of Section - I and II C.C. Drain from Static Tank to Maternity at ST area, Warangal Ward No.9Laxmi Narayana.D12-02-200860 days26-02-200902/06/20095012294378210437821520
266Laying of CC Road from 2-7-485 to Opp: 2-7-1246 at Excise Colony, HNK D.No.39M/s. P.W.L.C.Coop.Society, Laxmipuram22-10-200860 days26-02-200930/06/20092603102276700227670522
267Laying of CC patch work from H.No 6-2-329 to H.No NBH 16 at New Bus stand Road, and Govt. Junior College Road,Hnk Ward No.46Venkateshwarlu. Ch17-02-200930 days26-02-200907/08/20098266073586073586523
268Formation of Gravel Road at Muslim Grave Yard, Khammam Road, Warangal in Ward.No. 15Chandra Mohan.P17-09-200830 days26-02-200917/09/20099044775742075742525
269Laying of 110mm dia HDPE pipe line from EP No. KN 55 II 5/8 to H.No. 5-11-47/3 at Jagruthi Colony Hanamkonda in Ward No.44Chandra Mohan.P17-09-200830 days26-02-200917/09/20094329839536039536526
270Construction of Sec-I Drain from 2-4-1312 to 1321 at Gandhi Nagar, Hanamkonda in Ward.No.41Chandra Mohan.P06-09-200830 days26-02-200919/09/200910256591876091876527
271Laying of CC Road from H.No.2-6-1248 to 2-6-1198 on subedari police station to St. peter's school Road, Hanamkonda in Ward No.38M/s Waddera Labour Contract Co-operative Society, Rampur.07-04-200890 days26-02-200922/09/200910400609324240932424528
272Laying of WBM Road from H.No. 22-7-1 to 66 and 22-7-75 to Temple at Doctor's Colony Phase-II, Warangal In.Ward.No.53Sanjeev. G19-01-200960 days26-02-200929/09/20094775913816070381607529
273Cleaning of filteration sump wall and servicing sluice walls and spanners at filterbed at KUC,Hnk under AE Cirlce- IVVenkateshwarlu. Ch25-09-200830 days26-02-200908/10/20098466877186077186530
274Repirs to Drains at Shiva Nagar, Warangal in Ward.No. 16Sri Venkateshwara Constructions11-11-200830 days26-02-200930/10/20094997344760044760532
275Repairs to Drains at SRR Thota, Warangal in Ward No. 18Sri Venkateshwara Constructions17-02-200930 days26-02-200930/10/20095000044716044716533
276Laying of 110mm dia HDPE pipes KUDA Gate to Bus Stand Road and Construction of Section-II Drain from JNS Compound to Busstand Road Hanamkonda in Ward.No.46G. Sathyanarayana12-12-200930 days26-02-200916/11/20099835788295088295534
277Construction of Section-I CC Drain from 19-10-209 to 19-10-203 at Gavicherla Road Shambunipet Warangal in Ward.No.10Mandala Suresh17-09-200930 days26-02-200919/11/20099257686145086145535
278Laying of 110mm dia HDPipe at West fort WarangalSuresh Kumar.S25-02-200930 days27-02-200928/05/200810165592855092855536
279Laying of CC Road from 22-8-22 to 22-8-72 Doctors Colony - II Wgl W.No.53Niranjan .V01-12-200960 days27-02-200931/10/20084986694041510404151537
280Formation of Gravel Road at Shiva Nagar Sub Station, Shivanagar, Wgl W.No.17G.Sreedhar22-09-200830 days27-02-200907/04/20094466036996036996538
281LEVELLING OF ROAD WITH GRAVEL FOR DAMAGED PORTION FROM 11-28-270 TO 275 & 11-30-472 TO 11-28-289 AT THUMMALAKUNTA WGLG.Sreedhar22-08-200830 days27-02-200913/04/20094300035657035657539
282leveling the road gravel for damage portion from 22-8-152 at weavers colonyG.Sreedhar28-08-200830 days27-02-200913/04/20094750039304039304540
283desilting of emisting cc drain vent 16-4-1517 to at shivanagarChandra Mohan.P07-09-200815 days27-02-200918/04/20097300068397068397541
284Formation of Gravel roads at Lenin Nagar Wgl Ward No. 10GORRE AMARNATH28-01-200945 days27-02-200905/05/20091997231507460150746542
285Laying of CC Road from 20-12-177 to Gold Smith Hall at Mudirajwada, East Fort, Warangal in Ward NO. 9S.SHIVASHANKAR17-02-200945 days27-02-200910/06/20091673911499950149995545
286Laying of 110mm dia HDPE pipe line from H.no. 20-8-99 to 20-9-109 at West Fort, Warangal in Ward.No. 8Suresh Kumar.S29-02-200930 days27-02-200910/06/20099966690055090055546
287Formation of Gravel Road from 2-8-573/1/3 to Opp:2-8-682 at Bhavani Nagar, HNK in Div.No.38Sampath Rao.K25-03-200845 days27-02-200912/06/20091938611385860138586547
288L/o CC road from H.No 2-10-755/2 on opp H.NO. 2-10-933 at teacher Colony HnkM/s. P.W.L.C.Coop.Society, Laxmipuram18-01-200960 days27-02-200915/06/20093243872892100289210548
289Construction of CC Drain from 5-11-14 to 5-11-32/1 at Jagruthicolony, HNK W.No.44Ravi kumar.P30-07-200830 days27-02-200923/06/20097200064420064420549
290Formation of Gravel Road and Filling for Bathukamma and Dasara Festival at Bestham Chruvu, Rangasaipet, Warangal in Ward No.11Ravi kumar.P18-09-200815 days27-02-200913/07/20092992224894024894551
291Arresting of Leakages in AE Circle -I Area Warangal Govardhan Reddy.G27-01-200930 days27-02-200921/08/20097489670150070150552
292Construcytion of CC drain from H.No. 11-23-762 to 11-23-784 at LB Nagar Warangal in Ward.No.03M/s. ASHOKA DALITHA CIVIL AND SANITATION LCWM C & S LTD.,15-12-200860 days27-02-200914/09/20094624874152380415238553
293Layig of WBM Road at Santoshimatha Colony & Sai Nagar Colony at Hunter Road, Wgl.Laxmi Narayana.D15-10-200890 days27-02-200919/09/20098373026670520667052554
294Construction of compound wall to Burrial ground located at Kashibugga society colony, warangal in ward.no.04Preethi Const.29-07-200890 days27-02-200924/09/20099700008603230860323556
295Constructionof Section -I Cc Drain at Chintal and Puppalagutta, Warangal in Ward. No.07Preethi Const.20-08-200875 days27-02-200929/09/20095032844429540442954557
296Laying of CC Road from 01-07-253 to 1-7-328 at Pragathi Nagar Revenue Colony, HanamkondaRajendra Prasad07-08-200890 days27-02-200929/09/20094977164346170434617558
297Laying of CC Road in Teachers Colony Ph-II Hnk in W.No. 37Kumaraswamy. B27-02-200930 days27-02-200920/11/20091491131333450133345559
298Laying of WBM road from 24-4-32 to 24-4-43 and 24-4-59 and L/o of CC Road 24-4-73 to 24-4-63 Ambedhakar Nagar Kazipet Ward No. 31Kumaraswamy. B27-02-200930 days27-02-200920/11/200910255086661086661560
299Construction of 900mm vent CC Drain from Burial Ground to Ep.No.12at Pochammakunta Hanamkonda in Ward.No.44Manohar.M13-08-200890 days27-02-200923/11/20099576978039000803900562
300Formation of gravel road at abbanikunta, WarangalSuresh Kumar.S17-01-200815 days28-02-200904/06/20085890148996048996563
301Laying of C.C. Road from E.P.No.WPR 13/8 to H.No.2-7-1167/2 at Kanakadurga ColonyRajendra Prasad07-11-200930 days28-02-200923/04/20094731742093042093564
302Laying of CC Road from 2-9-896 to EP No. NGO C16/6, 2-9-904 to 2-9-907 at Indiranagar, Waddepally, HNK Div No.37Rajendra Prasad09-01-200960 days28-02-200927/04/20091932531682870168287565
303Laying of WBM Road from 2-8-445/3 to EP No. WPR 21/12, 2-8-455/4 to 2-8-464/5 at Vijayapal Colony, HNK in Div.No.38Sampath Rao.K15-02-200860 days28-02-200912/06/20094952863962630396263566
304C/o CC Drain from 11-23-630 to 621 at L.B.Nagar, Warangal In Ward No. 03M/s ADLCMA CO-Op society.15-12-200830 days28-02-200911/09/20091296321141310114131567
305Laying of CC Road from EP N. RCR 31/1 to EP No. NNS 515 at Pragathi Nagar, Hanamkonda in Div no.29M/s Sri Venkateshwara Drillers Civil Contractor27-02-200990 days28-02-200915/09/20095555984915540491554568
306Formation of Gravel Road at H.No.12-8-75 to 12-8-110 and 12-8-285/1 to Road End at Santhoshimatha Nagar Colony Hunter Road, Warangal in Ward.No.19M/s ADLCMA CO-Op society.29-01-200945 days28-02-200919/09/20092724692272300227230569
307construction of CC Drain from 11-23-244 to 11-23-271 at L.B. Nagar, in Ward no. 3M/s ADLCMA CO-Op society.15-12-200860 days28-02-200919/09/20094087573553130355313570
308Laying of CC Patches in Shivanagar.GORRE AMARNATH18-09-200845 days02-03-200906/02/20091977711764290176429573
309Construction of Slab Culvert at H.No.22-8-276 at Mangalivagu at Mainarity Colony, Wgl (Balance Work)MSR CONSTRUCTIONS02-02-200960 days02-03-200922/03/20094191573784910378491574
31040 CC Road from 2-5-131 to 2-5-904 behind Nakkalagutta Tank hnk Div.NO.40Naresh Kumar.D30-07-200860 days02-03-200904/06/20092094631840520184052575
311C/o CC Road from Hno.2-5-489 to 2-5-499 at Choti Majeed area hnk in w.no.40Naresh Kumar.D29-07-200860 days02-03-200904/06/20093556983111800311180576
312Laying of Metal Road Durga Colony W.No.28MSR CONSTRUCTIONS12-08-200860 days02-03-200910/08/20093500002919310291931577
313Laying of 110mm dia HDPE pipe line from 16-4-320 to 16-4-324 and 16-4-331 ato 16-4-330 at East Fort Road, Warangal in Ward No.16Govardhan Reddy.G16-12-200830 days02-03-200926/08/20095331648605048605578
314Laying of Distribution Pipe line and inter connections in various places in Ward.No.4 Warangal Govardhan Reddy.G27-01-200915 days02-03-200926/08/20095997154672054672579
315Filling and Gravel for levelling theGround inside the Moulali School at LB Nagar, Warangal in Ward No.2SAMMA RAO .M01-12-20830 days02-03-200928/08/20094415836737036737580
316Proposed inter connection at PP NO. PMW 1 Telephone Bhavan Pochamma Maidan Wgl. Govardhan Reddy.G06-12-200815 days02-03-200911/09/20094850044201044201581
317Laying of WBM Road from H.No. 5-11-550 to H.No.5-11-572 at Municipal open place Premnagar Colony HNK in W.No.44Srinvias P12-07-200830 days02-03-200915/09/20091405291193970119397582
318Laying of CC Road from H.No.5-11-402 to CVRN 16/2 at Premnagar Colony Hanamkonda in W.No.4Srinvias P05-11-200745 days02-03-200915/09/20092223131995920199592583
319Laying of CC road from H.No. 5-11-1323/2 to HNH 7/4/1 at Pochammakunta Hanamkonda in Ward No. 44Srinvias P28-11-200860 days02-03-200915/09/20093742553327840332784584
320Laying of CC Road from EP No. HRS 58/1 to H.NO.23-6-76/3 at Hunter Road HNK Div.No.28Srinvias P24-11-200860 days02-03-200915/09/20095847445178220517822585
321Laying of WBM Road From 5-11-959 to EP No. PPN1 and construction of CC Drain from 5-11-916 to EP.No. PPXN 1 at Pochammakunta, Hanamkonda in Ward.No.44Laxmi Narayana.D15-10-200845 days02-03-200919/09/20091848011749030174903586
322Laying of CC Road from 2-4-1463 to 1472 at Ashok Colony, Hanamkonda in Ward.No.41Rajendra Prasad06-09-200875 days02-03-200925/09/20094121003533600353360587
323Laying of CC Road from 2-4-444 to 2-4-835/2 at Ram Nagar, Hanamkonda in Ward No.41Rajendra Prasad28-08-200860 days02-03-200925/09/20091547461333970133397588
324Laying of CC Road from EP No.WPR 10/4 TO H.NO: 2-7-1058 at Kanakadurga Colony, Hnk in div. no. 39Rajendra Prasad08-07-200845 days02-03-200929/09/20091399951215150121515589
325Laying of CC Road from 2-6-1018 to -6-1016 at KLN Reddy Colony, Hanamkonda in Ward no. 38Rajendra Prasad20-08-200945 days02-03-200929/09/20092909452541250254125590
326Formation of Gravel Road and Filling of Bathukamma and Dasara Festival at Chintal Warangal in Div.No.7Srinivas. B22-09-200815 days02-03-200909/11/20095359744590044590591
327 Construction of CC drains at Widows Colony, Hanamkonda in Div.No.29Shiva Constn.26-09-200760 days02-03-200920/11/20094605553460860346086592
328Construction of Sec-II CC Drain from Venkata Sai Bakery to Opp: EP.No. SWH 2 and opp. 5-8-116 to 5-8-125 at Kishanpura, Hanamkonda in Ward .No. 46Laxmi Narayana.D18-10-200845 days02-03-200921/11/20091674381454660145466593
329Construction of 380mm size drain from 3-1-481 to 3-1-494 at Rayapura Hanamkonda in Ward.No.50Laxmi Narayana.D26-10-200830 days02-03-200921/11/200910981094782094782594
330Laying of CC Road from EP No. TBS 27/A/2 to 2-6-47/1 at Shanthi Nagar, Hanamkonda in Ward.No.38 Laxmi Narayana.D20-08-200830 days02-03-200923/11/20091450001295460129546595
331Laying of CC Road from EP No. NNS 9/1 to H.No.1-9-307 at Nagendra Nagar, Hanamkonda in Div.No. 30Laxmi Narayana.D14-08-200845 days02-03-200923/11/20091432901247010124701596
332Laing of CC Road from H.No. 1-9-376 to 1-9-378 at Julywada, Hanamkonda inDiv.No.30Laxmi Narayana.D18-08-200830 days02-03-200923/11/20091317051135330113533597
333Construction of CC Drain from St. Peters Pharmacy College to 80"ft Road at Vidya Nagar, Hanamkonda in W.No.41Laxmi Narayana.D17-09-200830 days02-03-200924/11/20091069971013100101310598
334Laying of CC Road and construction of Section-I CC Drain from 3-10-178 to 3-10-180 and 3-10-165 to EP.No.RCH 3/1 at Reddy colony, Hanamkonda in Ward.No. 48Laxmi Narayana.D17-09-200860 days02-03-200924/11/20094142653699430369943599
335Laying of WBM Road from 19-9-335 to 19-12-19/5 at Kashikunta, Warangal in Ward.No.11K.Murali Krishna 12-08-200830 days03-03-200921/08/20099670580937080937602
336C/o CC Drain from H.No.1-8-80 to H.No.7-1-48 at Balasamudram HNK Chandra Mohan.P03-07-200930 days03-03-200916/10/20098442275977075977603
337Laying of 110mm dia HDPE pipe line from Existing pipe line to Jyothi Bala Mandir High School at LB Nagar, Warangal in Ward.NO.2Suresh Kumar.S19-01-200930 days09-03-200910/06/20098500077449077449604
338L/o of CC Road from 3-14-411 to 3-14-399 at Durga Colony, Hanmkonda in Div.No.43Laxmi Narayana.D30-02-200845 days14-03-200923/11/20093186422777660277766605
339LAYING OF BM ROAD FROM H.NO 1-7-322 /1 TO 1-7-328 AT PRAGATHI NAGAR ROAD NO 3 DIV NO 29VCR ASSOCIATES23-02-200730 days21-03-200925/11/20082241101622770162277606
340Laying of CC Road from H.No.2-11-541 to 2-11-514/1 at Vidyaranyapuri, HNk in Ward No.43Naresh Kumar.D22-07-200860 days22-03-200904/06/20094149603650880365088607
341Supply and fixing of Water supply arrangement in Ward No.45Suresh Kumar.S14-02-200930 days25-03-200930/05/20091392001268520126852608
342Laying of CC Road and construction of CC Drain from 3-9-86 to 3-9-93 and 3-9-96/6 at Reddy Colony Hanamkonda Laxmi Narayana.D06-01-200975 days05-04-200929/11/20093343342990280299028609
343Laying of cc Road at Bhavani Nagar Kazipet Ward.No.33Kumaraswamy. B12-02-200975 days10-04-200916/09/20095469984551270455127610
344Construction of CC Drain from H.No. 2-8-421 to 425, 2-8-377/A-1 to 048 at Raghavendranagar HNKA. Ramesh17-02-200930 days19-04-200916/09/20091993671691120169112611
345L/o of CC Road from EP No. RCH 85/31 to 3-9-219/1 at Reddy Colony, Hanamkonda in W.No.48 Laxmi Narayana.D06-01-200845 days25-04-200929/11/20094275523903170390317612
346Laying of CC Road at Bhavani Nagar Kazipet Kumaraswamy. B13-03-200960 days19-05-200916/09/20095556254523550452355613
347Removal of Dharmasagar tank wear teaked sluice concal valve with the help of sinkessKumaraswamy. B19-05-200930 days29-05-200928/07/20098476077270077270614
348Construction of RCC Slab Culvert beside Vinayaka bar KUC Road Hanamkonda in division no 45Venkateshwarlu. Ch28-08-200860 days30-05-200903/07/20091272461188410118841615
349Arresting of Leakages on 6dia to 24 dia pipelines on various locations in ward no. 43,45 to 49 in A.E Circle -IV wingVenkateshwarlu. Ch24-02-200930 days30-05-200903/07/20098889981045081045616
350Laying of 4dia HDPE pipeline from H.No 4-6-209 to H.no 4-6-214 near Buddha Bhavan, Reddy colony, Hnk in ward no 48Venkateshwarlu. Ch18-02-200930 days30-05-200903/07/20095426549470049470617
351Arresting of Leakages on 6dia to 24 dia pipelines on various locations in ward no. 43,45 to 49 in A.E Circle -IV wingVenkateshwarlu. Ch18-02-200930 days30-05-200907/08/20098909181218081218618
352Laying of HDPE Pipeline from CKM college Road to 22-1-87 at Weavers Colony, Warangal in Ward no. 1Govardhan Reddy.G18-02-200875 days02-06-200916/10/20096740746156860615686619
353Laying of CC Road from 20-6-24 to 24-6-53 and 20-06-52 to 20-6-50 and construtionn of section -I CC Drain at West Fort, Warangal in Ward No. 8GORRE AMARNATH21-01-200945 days03-06-200917/08/20092074501843070184307620
354Manufacture supply and delivery of 150mm dia S.Vs and specials for improement of water supply at Krishna Colony, Ganesh Nagar and Kancherlaveethi in W.No.43 & 49Govardhan Reddy.G24-02-200930 days03-06-200926/08/20099256384059084059621
355Purchasing of Bore Wells Materials for 1 to 53 in WMCM/s. Sai Thirumala Engineering Corporation.24-04-200930 days04-06-200929/09/20098809258237530823753622
356Arresting of Leakages on 6dia to 24 dia pipelines on various locations in ward no. 42,44 40 and 41 in Nakkalagutta GLSR HnkVenkateshwarlu. Ch28-02-200930 days06-06-200903/07/20099825889577089577623
357providing of entreance gate to CRC centre at Ursu Kareemabad Warangal Chandra Mohan.P27-02-200930 days06-06-200911/09/20099980089860089860624
358Electrification to CRC centre at Urus, Kareemabad Warangal Chandra Mohan.P02-02-200930 days06-06-200920/11/20099935890579090579625
359Construction of North and East side plat Forms at CRC Centre at Urus, Kareemabad Wgl Chandra Mohan.P04-06-200930 days06-06-200920/11/20099467682863082863626
360Providing water supply and sanitation system to CRC centre at Urus, Kareemabad Warangal Chandra Mohan.P27-02-200930 days06-06-200920/11/20099601187527087527627
361F/o Gravel for Bathukamma and Dasara Festival at Mahankali Temple, Mini Rangaleela Maidan Rangasaipet Warangal in W.No.10S.SHIVASHANKAR17-09-200830 days09-06-200920/11/092491920732020732628
362Filling of gravel at infront o Darga Shrrine on the occasion of Urus Festival,Darga Kazipet Kumaraswamy. B19-02-200945 days10-06-200928/07/20093769831362031362629
363Laying of CC Road from H.No.25-11-302/1 to 25-11-325 at Balaji Nagar, Kazipet in Ward No.34Kumaraswamy. B03-10-200860 days10-06-200928/07/20092597282317750231775630
364Laying of CC Road from H.No.1-2-119 to EP No. RNK 10 at Rahamath nagar, Kazipet in W.No.35 & 36Kumaraswamy. B11-02-200960 days10-06-200928/07/20094227913763500376350631
365Drilling of 6 1/2" dia Borewell and construction of static tank at Afzal Nagar and Drilling of 4 1/2' dia Borewell and erection of Hand pump at Shastri Nagar, Kazipet in Ward No.31Kumaraswamy. B24-08-200830 days10-06-200928/07/200910394994438094438632
366Excavation for Trenches and High Beems cutting and filling of quarry dust from Sri rama Kiranam to H.No. 1-1-1125 at Siddartha Nagar, Kazipet Kumaraswamy. B08-08-200830 days10-06-200916/09/20099313673914073914633
367L/o of CC road at SBH Junction at Nakkalagutta, Hanamkonda Kumaraswamy. B12-02-200975 days10-06-200916/09/20091820161623160162316634
368Laying of WBM Road from EP No. ZPS 9/1 to H.No; 2-6-1052 at KLN Reddy Colony, HanamkondaNaga Raju T15-01-200945 days10-06-200916/09/20092280571938250193825635
369Laying of WBM Road and Construction of CC Drain from H.No; 1-7-44/2A to 1-7-42, 1-7-46/1 to 1-7-56 at Sai Colony, HanamkondaNaga Raju T18-01-200975 days10-06-200916/09/20095233524542780454278636
370Laying of BT Road patches from 80'.0 Road to CKM College Junction at Deshaipet Road, Warangal (Instead of BT Work this work is changed to CC patch work)M/s Shiva Constructions (K. Sudhakar)26-04-200745 days10-06-200926/11/20092699612407340240734637
371Construction of CC Drain from NH 202 Road to Transformer at Rahmathnagar, Kazipet in w.No. 35Kumaraswamy. B23-11-200845 days11-06-200928/07/20092659342375390237539638
372Arresting of leakages for pumping main 14 dai line from Waddepally filters to Kazipet S.R. Kazipet Kumaraswamy. B20-01-200930 days11-06-200916/09/20099306884825084825639
373providing water tanker for unserved areas under A.E. Circle-I in W.No.31 to 36 Kazipet Kumaraswamy. B27-05-200930 days11-06-200916/09/20092900828285028285640
374laying of WBM Road from EP No.TGK 12/1/3 to EP No. TGK 10/2 and H.No. 1-1-123/8/1/A at Prashanthinagar, Kazipet in W.No.36Kumaraswamy. B10-01-200960 days11-06-200916/09/20094144033274960327496641
375Laying of WBM Road and const. of CC Drain from H.No. 1-1-30 to 1-1-27/1 at Chaitanyapuri, Kazipet in W.No.36Kumaraswamy. B24-12-200860 days11-06-200916/09/20094994734051270405127642
376Laing of CC Road from H.No. 24-7-226/4/1 to Deaf and Dum School at Ramkrishna Colony, Kazipet in W.No.31Kumaraswamy. B10-12-200875 days11-06-200916/09/20095844665023860502386643
377Formation of road with gravel from 16'-00 road from H.No.1-1-27/19/8 at Prasanthinagar, Kazipet in W.No.36Kumaraswamy. B25-11-200860 days16-06-200928/07/20092823862340540234054645
378Laying of 160mm dia HDPE pipeline from H.No.4-2-380 to H.No.4-2-38 Near Suryanarayana Kiranam Kumarpally HNK in W.No.45Govardhan Reddy.G25-04-200930 days16-06-200926/08/20099530986887086887646
379M/S/D of 140 mm dia HDPE pipeline forinter connection of H.No. 6-4-186, near Urdumedium High School Machilibazar HNK W.no.27Govardhan Reddy.G25-02-200930 days16-06-200920/09/20093301230095030095647
380Interconnection of 21 dia improvement of Water Supply for Kancharkunta Area HNK W.No.46Govardhan Reddy.G18-05-200930 days16-06-200931/10/20094720243124043124648
381Supply of A.E. C. No.VII Chandra Mohan.P20-02-200930 days17-06-200919/09/20098870580930080930649
382White painting to compound wall and ground leveling with gravel at CRC centre Kareemabad warangal Chandra Mohan.P27-02-200930 days17-06-200920/11/20099969885582085582650
383Laying of 200mm dai HDPE pipeline at UPA Nirmitha Kendra at 100 ft Road beside Sammaiahnagar HNK in W.No.42Chandra Mohan.P21-02-200930 days20-06-200919/09/20096486459132059132651
384Laying of 140mm dia HDPE pipeline from H.No. 2-4-1453/5 to 2-4-1292 at Gandhinagar, Hanamkonda inW.No.41Chandra Mohan.P20-02-200930 days20-06-200919/09/20096599260161060161652
385L/o of CC Road at Bhavani Nagar, KazipetKumaraswamy. B23-04-200960 days22-06-200928/07/20095469984551270455127653
38650/3 mm value at L.B.Nagar Wgl A.E. VII At WglChandra Mohan.P19-02-200930 days23-06-200919-04-20098318675836075836654
387Enamel painting to Clarifocuulator Bridges at Deshaipet Filters, Warangal Chandra Mohan.P20-05-200930 days23-06-200920/11/20093995236421036421655
388Laying of CC road from H.No. 1-6-21 to 24 and EP No. JMK 16/2/1 to 1-6-24 at Jubilee Market, Kazipet in Div.No.33Kumaraswamy. B20-08-200845 days25-06-200928/07/20091679991486230148623656
389Laying of CC Road from H.No.1-2-282/1 to 1-2-286 at Rahmathnagar, Kazipet in W.No.36Kumaraswamy. B10-01-200945 days25-06-200928/07/20091468471303710130371657
390Laying of CC Road from 20-16-170/A to 20-16-168/1 Construction of CC Drain Sec-I from 20-16-143 to 20-16-134, 20-16-171 to Han Bore 2/6 at Kothagadda and from 20-13-14 to 20-13-139 & Construction of Static Tanks at H.No.20-15-40 & 20-15-136 at East Fort Laxmi Narayana.D25-03-200965 days25-06-200919/10/20092506902213240221324658
391Attending water suply works at Nakkalagutta Sump Hanamkonda Chandra Mohan.P22-02-200930 days26-06-200919/09/20092681824449024449659
392Painting to the Ambedhkar Statue at Beside Municipal Commissioner's Camp Ofice HNKChandra Mohan.P21-02-200930 days26-06-200919/09/20091466313366013366660
393Laying of 140mm dia HDPE pipeline from H.No.5-11-158 to EP No. RLN/5 at Kishanpura, Hanamkonda Chandra Mohan.P22-02-200930 days26-06-200919/09/20095994854650054650661
394Laying of 110mm dia HDPE pipe line from 6-6-8 to 6-6-16 at Thousand Pillors Temple in Ward.No.50Chandra Mohan.P26-08-200930 days26-06-200919/09/20095357548841048841662
395Filling of the pot holes and levelling in side at the ground at backside Etukala Madusudhan Rao School, Kothawada, Wgl on occasion of Bathukamma & Dasara Festival Chandra Mohan.P29-09-200830 days26-06-200919/09/20094000033275033275663
396Providing o Barcading at Kothawada, Warangal on occation of Bathukamma Festival P. Venu Gopal06-12-200915 days26-06-200919/09/20091784616715016715664
397Construction of Compound wall and Supply and Fixing of MS Gate at Kothawada Warangal in Ward No.52Chandra Mohan.P17-02-200930 days26-06-200926/09/20097859770291070291665
398Laying of Box drain from Gopalpur road to Cause way to H.No. 2-1-18 at Saraswathi nagar Hanamkonda Ward.No.42Chandra Mohan.P17-02-200930 days26-06-200926/09/20091555511374870137487666
399Engaging of semi skilled and un-skilled persons at KUC filters and aresting leakages under AE circle IV Hanamkonda Govardhan Reddy.G25-04-200990 days26-06-200928/09/20097704075121075121667
400Laying oc CC Road from H.No.1-8-152 to 1-8-144 at Balasamudram, Hnk in W.No.40M/s Harsha Constructions01-06-200945 days26-06-200915/11/20092952252705230270523668
401C/o CC Drain from EP No. MRS 50 to opp: Eden Function Hall and upto 2-5-810 at Mubarak mahal, Hanamkonda in Ward.No.40M/s Harsha Constructions01-06-200975 days26-06-200915/11/20097323636535800653580669
402Construction of compound wall around Hanuman Temple at Chintal in W.No.7V. Yadagiri01-06-200930 days28-06-200909/09/200911111498800098800670
403Laying of CC Road and construction of Sec-I CC Drain from H.No. 20-8-34 and 20-8-45 at Betrajulawada, Middle Fort, Warangal in Div.No.8V. Yadagiri01-06-200960 days28-06-200929/09/20094898984366400436640671
404L/o of 160 mm dia HDPE Pipe Line from H.No.5-11-476 to 443 at Preem Nagar ColonyGANGA POLYMERS12-12-200845 days29-06-200919/09/20092456592106490210649672
405L/o of 160 mm dia HDPE Pipe Line from H.No.11-29-71 to 11-28-283/1 at Preem Nagar ColonyGANGA POLYMERS12-09-200845 days30-06-200919/09/20092629772255240225524673
406L/o of 200 mm dia HDPE Pipe Line from H.No.5-11-420 to 5-11-363/1 at Preem Nagar ColonyGANGA POLYMERS12-12-200860 days30-06-200919/09/20095037274306920430692674
407L/o of WBM Road @ Section I & II CC Drain from 2-253 @ H.No.2-12-2021 to E.P.No.KNK 76, HNK in Div No.43M. RAVINDER01-02-2009105 days30-06-200929/09/097698026756090675609675
408Laying of 160mm dia HDPE pipeline at Gap portion at opp: Reddy Chicken Centre Kishanpura, HNK Chandra Mohan.P21-02-200930 days01-07-200919/09/20098200074722074722676
409Laying of CC road from EP No. DPRC 17 to DPRL 20 at Desaipet Road Warangal Sudhakar.K06-07-200990 days01-07-200926/11/200910318679275890927589678
410Laying of WBM Road and Constrution of CC Drain from H.No.24-7-723 to 268/8 and EP No.PRS 11/4 to 24-7-245 at Rama Krishna Colony, Kazipet in Div.No.31M/s Harijana Labour Contract Co-operative Society, Somaram18-10-200845 days04-07-200910/07/20093325392673330267333679
411Laying of CC Drain from Indian Overseas Bank to Circuit House Road, nakkalagutta HNK in.W.No. 40M/S SAI KRUPA ENTERPRISES10-01-200975 days04-07-200920/11/20097351686648970664897680
412Supply and delivery of spindle rods at Under Railway gate area in W.No.7 to 11 and 15 to 18 & 20 Warangal Chandra Mohan.P30-04-200930 days07-07-200919/09/20094992045509045509681
413Arresting of leakages in various places at Under Railway gate area in W.No.7 to 11 and 15 to 18 & 20 Wgl Chandra Mohan.P30-04-200930 days07-07-200919/09/20094966045274045274682
414Supply and delivery of sluice valves at Under Railway Gate area in W.No.7 to 11 and 15 to 18 & 20Chandra Mohan.P30-04-200930 days07-07-200926/09/20094993045519045519683
415LAY OF WMB ROAD FROM H.NO.2-10-891-3 TO 60 ROAD AT BANK COLONY HNKKumaraswamy. B15-10-200830 days10-07-200902/04/200910302977306077306684
416Laying of 160mm dia 110mm dia HDPE pipeline on 10" RCC pipes from H.No.16-9-401to puppalagutta tank at Warangal in W.No.7 (SC Area)Govardhan Reddy.G12-06-200930 days10-07-200927/08/20094300740282040282685
417Laying of 110mm dia HDPE pipe line from H.No.16-10-823 to 16-10-848 at Shivangar Warangal ST Area in W.No.17Govardhan Reddy.G12-06-200930 days10-07-200928/09/20096245756939056939686
418L/o 110mm dia HDPE pipe line from 16-4-1452 to 16-4-1450 and 16-4-1105 at Shivanagar Warangal in W.No.16Govardhan Reddy.G10-06-200945 days16-07-200926/08/20099710188520088520687
419Laying of CC road at Shambunipet, Muslim Area and Lepresy Hall Area, Warangal in Div.No.10MSR CONSTRUCTIONS17-07-200860 days16-07-200915/09/20095110054454560445456688
420S/o of Water supply material in maintenance of Water supply in Circle No.VII in Ward No.26, 27 to 50 to 53Venkataramana Enterprises26-02-200930 days16-07-200919/09/20096783463536063536689
421S/o Spindle Road in Ward No.1,3,4,5,6 and 22 Warangal in A.E Circle IVenkataramana Enterprises26-02-200930 days16-07-200919/09/20096579061621061621690
422S/o of Shive Value and take pices for Warangal in A.E Circle IVenkataramana Enterprises26-02-200930 days16-07-200919/09/20099361087679087679691
423Laying of 110mm dia distribution line from H.No; 1-7-1293 to 1-7-1284 at Advocates Colony,HnkGovardhan Reddy.G18-02-200930 days17-07-200920/11/20095038145929045929692
424Replacing of damaged pipeline with new pipe at Vivekananda School and nature care hospital HanamkondaGovardhan Reddy.G18-02-200930 days17-07-200920/11/20096281857268057268693
425Laying of CCRoad from H.No. 2-7-701 to 2-7-678 at excise colony, HNK in Div.NO.39Kumaraswamy. B07-11-200875 days23-07-200916/09/20098809967706910770691694
426Laying of CC Road and Const. of CC drain from H.No. 2-7-887 to 892, 2-7-904/A to 701, EP APS8 to 2-7-1009 at Alipura, HNK in Div. No.39Kumaraswamy. B13-08-200875 days23-07-200920/11/20096487175583260558326695
427Laying of CC Road from H.No. 2-4-617/A to 2-4-614 and upto 2-4-720/4 at Ram Nagar, Hanamkonda in Div.No.41Srinvias P11-02-200945 days23-07-200927/11/20092244142017940201794696
428L/o CC Road from 2-5-294/1 at Nakkalagutta Hanamkonda in div.no.40Rajendra Prasad15-05-200745 days25-07-200924/09/200910339290026090026697
429L/o of CC drain from 22-3-35 to Hill and CC drain from 22-3-85 to 22-3-83 at Desaipet Warangal Sanjeev. G18-10-200945 days01-08-200911/06/20091751661565450156545698
430Construction of Section-I & II CC Drain and Box drain from 1-1-1376 to 1369 to Opp. 1404 at Venkatadrinagar Kazipet in Div.No.36M/s Harijana Labour Contract Co-operative Society, Somaram18-10-200860 days01-08-200910/07/20093285372825930282593699
431L/o of CC Road from 3-14-411 to 3-14-399 at Durga Colony, Hanmkonda in Div.No.43Naresh Kumar.D24-07-200860 days01-08-200920/11/20093186422777660277766701
432L/o of CC Road from EP No. RCH 85/31 to 3-9-219/1 at Reddy Colony, Hanamkonda in W.No.48 Naresh Kumar.D28-08-200860 days01-08-200920/11/20094275523903170390317702
433(98) C/o drainage from H.No.2-7-542 to 2-7-700/A in excise colony, Hanamkonda. Chandra Mohan.P04-06-200930 days03-08-200920/11/20098988680498080498703
434Construction of Retaining wall at Backside of Burrial Ground Pothana Nagar, Warangal in Ward No.26SATISH KUMAR . N25-08-200875 days13-08-200914/10/20094227803723210372321704
435L/o of 110mm dia HDPE pipe line from H.No. 11-30-58 to 11-28-230 at Kothawada Wgl W.No.51Suresh Kumar.S28-05-200930 days17-08-200925/11/20097456267973067973705
436Laying of CC road from 6-1-52 to 6-1-68 at Kancharakunta, Hanamkonda in Ward.No.46MSR CONSTRUCTIONS28-08-200845 days18-08-200904/11/20091861021668300166830706
437L/o of 110mm dia HDPE pipe line from H.No. 11-30-75 to 11-30-80 at Kothawada Wgl Ward.No.51Suresh Kumar.S28-05-200930 days18-08-200925/11/20094250038709038709707
438Laying of 110mm dia HDPE pipeline from H.No. 22-6-123 to 22-8-129 at Perukawada, Deshaipet, Warangal in W.No.53Suresh Kumar.S20-02-200930 days18-08-200925/11/20094728643108043108708
439Laying of CC road from H.No. 3-10-259 to 3-10-276 and 3-10-272 to RCH 3 at Reddy Colony, Hnk in Div. No.48Laxmi Narayana.D20-05-200975 days20-08-200929/11/20092491402158430215843709
440L/o of WBM road and construction of SEction-II CC drain from 16-3-835 to 16-3-834/1 Opp. to Annapurna Function Hall at Ekashila Nagar, WarangalAjay Dalitha LCCS Warangal24-11-200860 days05-09-200909/04/20094842314258120425812710
441Laying of CC road from H.No. 3-10-259 to 3-10-276 and 3-10-272 to RCH 3 at Reddy Colony, Hnk in Div. No.48Naresh Kumar.D26-10-200745 days24-09-200920/11/20092491402158430215843712
442L/o CC Road at SBH Junction at Nakkalagutta HNK Kumaraswamy. B31-08-200960 days25-09-200916/09/20092358042102610210261713
443Construction of Chamber wall raising with RCC At Dharma Sagar Tank (Storage)Kumaraswamy. B08-09-200960 days25-09-200916/09/20091230651115440111544714
444Filling of Pot holes with dust on the occasion of Ganesh Nimajjanam at Darga Kazipet W.No.31Kumaraswamy. B17-08-200930 days25-09-200909/10/20092868521591021591715
445Excavation of filed channel from existing check dam No.1 to somidi tank weir kazipet Kumaraswamy. B08-09-200990 days25-09-200909/10/20094964614525920452592716
446Laying of 900mm dia NP3 pipes and excavation of field channel from Kapil Homes to existing check dam No.1 Madikonda Kumaraswamy. B08-09-200975 days25-09-200909/10/20092661112425970242597717
447Construction of Section-II CC drain from H.No. 15-10-258 to 15-10-272 at Ramannapet, Warangal in Ward.No. 19M/S SAI KRUPA ENTERPRISES16-01-200960 days30-09-200920/11/20092098991850320185032718
448Levelling the ground with gravel at near petrol pump magilicherla road in W.No.3 Bathukamma Festival DAYAKAR.G12-09-200915 days09-10-200920/11/20092188418205018205719
449Laying of CC patch work at Ekashila Nagar Warangal in Ward No.15 & 18GORRE AMARNATH10-08-200830 days12-10-200917/08/20091530581365860136586720
450Layingo of CC Road with WBM Road from H.No. 12-8-216/1 to PJR 8/13 at Santoshimatha Colony Hunter Road Warangal in Ward.No.19MSR CONSTRUCTIONS25-08-200845 days13-10-200904/11/20091992031733800173380721
451Laying of CC Roads in Orus Kareemabad in Ward.NO.12MSR CONSTRUCTIONS20-08-200890 days13-10-200920/11/20098364177643300764330722
452Laying of Pipes to Cross Drinage at Various Places in W.No.23 WarangalSri Venkateshwara Constructions17-11-200945 days16-10-200921/08/20088881679733079733723
453Formation of Gravel Road from E.P. No. KWT 7/10 to Khammam Road fro Bathukamma Festival at Koutalya School Kareemabad Warangal Sadanandam. B14-09-200930 days16-10-200917/11/20092500021385021385724
454Blandage to existing damaged WBM Road from EP no. 13/5/A to Khammam Road at Talla Padmavathi Pharmacy College for Bathukamma Festival, karimabad, WarangalSadanandam. B10-09-200915 days16-10-200919/11/20092097517510017510725
455Arresting the leakages in Ward no,.7,8,9,10,11 and 15,16,17 under AE Cirlce No.VGovardhan Reddy.G11-08-200930 days16-10-200920/11/20099949793178093178726
456Construction of Section-II CC Drain from H.No. 3-4-615 to 538 and 3-4-616 to 3-4-514 at Yenugulagadda, Hanamkonda in Ward.No.49Preethi Const.28-03-200975 days24-10-200925/09/20094903314016430401643727
457Construction of Section-II CC drain from 3-4-621 to 3-4-485 and 3-4-621 to 3-4-45 and EP No. YGH 29/1 to 3-4-481 at Yenugulagadda, Hanamkonda in Ward.No. 49Preethi Const.20-10-200875 days24-10-200925/09/20094481163625710362571728
458Blindage to Koti Lingala Road from Ex. CC Road to Sai Baba Temple lane in W.No.4 Warangal Preethi Const.12-09-200115 days26-10-200929/09/20091828115210015210730
459Laveling th Eduga Ground at Near Lothukunta Warangal W.No.3Preethi Const.11-09-200915 days26-10-200929/09/20092349719552019552731
460Construction of Compound wall in Burrial ground at Santhoshmatha Colony, Hunter Road, Warangal in Ward.No. 19 Sadanandam. B09-10-200975 days30-10-200915/09/20097636986472950647295732
461Excavation for field channel from D1 & D2 canal along the Dharma Sagar RoadKumaraswamy. B05-10-200960 days04-11-200920/11/20094673994260990426099733
462M/S/D of 1000mm dia RCC NP3 pipes and Rock cutting in between D1 canal Open channel to D2 canal channel, MadikondaKumaraswamy. B03-11-200945 days10-11-200920/11/20092718892475920247592735
463Gravel filling on the occasion of Bathukamma festival and eddol fital in various locations at Kazipet Kumaraswamy. B17-08-200915 days10-11-200920/11/20092695922428022428736
464Laying of CC road from H.No. 25-5-121 to Mahankali Temple at Vishnupuri Kazipet Ward.No.34Kumaraswamy. B18-07-200930 days10-11-200920/11/20091512481278140127814737
465Laying of 110mm dia HDPE pipeline from H.No.16-3-603 to 16-3-416 at Sakarasikunta Warangal in Ward.No.15Govardhan Reddy.G21-10-200930 days13-11-200920/11/20093991636389036389738
466Laying of C.C. Road from 11-24-135 to 11-29-60Venkateshwarlu P.28-11-200760 days25-11-200931/10/20083520002861130286113739
467Laying of CC Road from 5-11-1074 to 5-11-1067 at Pochammakunta, Hanamkonda in Ward No.44MSR CONSTRUCTIONS17-10-200860 days02-03-20914/07/20092545702250170225017740
468C/o of CC Drain from 2-4-828 to 448 at Venkat Rao Nagar Colony at Ward No.41K. Raghupathi Reddy15-10-200830 days04-02-20913/02/20091240001020120102012741
469Laying of CC Road from EP.No.37 BNH 21 to H.No.1-7-1818 at Srinivas Nagar, HNKManohar.M15-05-200660 days08-01-20829/08/20081669091503130150313742
470LAYING OF CC ROAD16-6-195 TO OPP MAZID AT PERUKAWADAChandra Mohan.P09-12-200830 days2602-200902/05/200910146693521093521743
471Providing Water Supply failing to Existing Dhobi Ghat at Chinna Waddepally Cheru, DesaipetRavi kumar.P05-07-2008NoNo15/09/20084319238963038963744
472contrution of cc drain and formation gravel road from govt to EP No ASD/21 and ASD/24/1 to ASD/1/5 at desaipet warangal div 1Sanjeev. G   02/01/20004573744045690404569745
473L/o 200 mm dia HDPE pipe line from 7-8-110 of 7-8-99 at Machili Bazar HNKChandra Mohan.P   17/10/20081412121313600131360746
474Construction of 450 mm size C.C Drain from 1-8-83/17 to Sridevi Talkes main Road and Gravel Formation from 1-8-83/17 to EP.No. SWH 23/5 at Sainagar, Balasamudram Hyd in Ward No.40M/S SAI KRUPA ENTERPRISES   10/12/20082220151628590162859747
475Construction WBM Road from H.NO.1-7-380 to 1-7-377 at Revenue Colony, HNKRamesh.B   30/01/20091690001382960138296748
476C/o of CC Road from E.P.No.40 to H.No.2-9-43 at Vikas Nagar, HNKRavinder Rao A   06/10/20092125001870980187098749
477Leveling the Ground at Various Locations in Div No.37 for the occeassion of Bathukamma FestivalRavinder Rao A   06/10/20092950024212024212750
478Levelling the ground for the occasion of Bathukamma Festival in Div.No.30Ravinder Rao A   06/10/20092007216698016698751
479Laying of CC Road and construction of CC Drain from EP No. FRM 55/8/5 to H.No. 16-4-269/1 and EP No. SNM 21/2/5 to Opp. 16-4-1154 at Shiva Nagar Warangal in Ward No. 16Niranjan .V   14/10/20096274845187700518770752
480Laying of WBM Road from 2-7-521 to 2-7-516 at Excise Colony, Hanamkonda in Div.No.39VCR ASSOCIATES   25/10/20098289469133069133753
481L/o of CC Road from H.No.16-6-185 at 83 at Perukawada Wgl W.No.17Chandra Mohan.P   05/11/20099950090868090868754
482Levelling the ground for the occasion of Bathukamma Festival in Div.No.28 & 37Ravinder Rao A   11/11/20092446320351020351755
483Laying of CC Road from 1-9-352 to EP No. BNS 29/2 1-9-340 to EP No BNS 29-1-2 at Julywada Hanamkonda in Div.No.30M/s Waddera Labour contractor Paraspara Sahayaka Sahakara Sangam Ltd.    13/11/20094548633990330399033756
484Laying of CC Road and construction of CC Drain from 3-9-86 to 3-9-93 and 3-9-96/6 at Reddy Colony Hanamkonda Naresh Kumar.D   20/11/20093343342990280299028757
485Restoration of Damaged Existing Road by Formation of Gravel Road from 11-23-2331 to Road end at LB Nagar Warangal in Ward.No.2Niranjan .V   20/11/200912494889582089582758
486Restevation of Damaged existing road by Formation of Gravel road at Koyawada in Various plaes in Ward.No.14Niranjan .V   20/11/20091580001162740116274759
487Construction of CC Drain and Laying of CC Road from H.No. 16-10-1225 to 16-10-1119 and H.No.16-6-1371 and other places at shivanagar Warangal in W.No.17Niranjan .V   20/11/20092034041663910166391760
488Laying of CC Road from 16-4-996/1 to excisting CC Road at Shivanagar warangal in W.NO.16Niranjan .V   27/11/20092746592435310243531761
489Laying of CC Road and constrion of CC Drain from H.No.16-4-610 to 16-4-602 at shinvanagar warangal w.no.16Niranjan .V   27/11/20091267221064160106416762
     PRESENT DUESTOTAL125767061108095154 108095154 