| 1 | C/O SECTION 1 CC DRAIN FROM H NO 2-7-6 TO 2-7-20 EXCISE COLONY HNK | Naresh Kumar.D | 09-01-2004 | 30 days | 05-03-2004 | 15/Nov/2008 | 37939 | 29412 | 20588.4 |
| 2 | L/o of CC Road from 16-5-79 & 169 to 150 at Shivangar, Wgl | DAYAKAR.G | 15-05-2004 | 30 days | 15-12-2004 | 04/Jan/2008 | 54498 | 49709 | 34796.3 |
| 3 | repairs to rr drains from H.no 10-9-25 to 10-9-29 and 10-9-35 to 10-9-170 to 10-9-175 to 10-10-100 to 10-10-99 at girmajipet ward no 34 | Suresh Kumar.S | 24-05-2005 | 30 days | 07-06-2005 | 24/Nov/2006 | 21167 | 19262 | 13483.4 |
| 4 | Laying of CC Road from H.No.13-5-62 to 13-5-61 to 13-5-57 and Construction of RR Masonry 13-5-58 to 13-5-57 at Mandibazar, Wgl W.No.24 | HLCCS-Rangampet | 02-04-2005 | 30 days | 28-11-2005 | 08/Jan/2007 | 120000 | 105154 | 73607.8 |
| 5 | C/o Boxtype drain from Opp. Tara gardens to HNK 24-7-289/A/B at Rama Krishna Colony in D.No.31 | SAMMA RAO .M | 16-02-2005 | 90 days | 07-01-2006 | 23/Feb/2007 | 948900 | 848637 | 594045.9 |
| 6 | Laying of WBM Road from EP No. KBR 13/1 to 16-3-21 at Sanitary Ward 15 | Sudhakar.K | 05-01-2006 | 30 days | 02-03-2006 | 29/Jun/2009 | 112172 | 69803 | 48862.1 |
| 7 | Laying of WBM Road from 16-3-74 to 16-3-84/1 at Shanthi Nagar, Wgl | Sudhakar.K | 05-01-2006 | 30 days | 02-03-2006 | 29/Jun/2009 | 109942 | 66697 | 46687.9 |
| 8 | Construction of Section I CC Drain from 2-7-1 to 2-7-22 at Excise Colony, HNK | Manohar.M | 25-03-2006 | 30 days | 25-05-2006 | 18/Dec/2006 | 97619 | 68507 | 47954.9 |
| 9 | Construction section I CC Drain from H.No.1-9-764 to 1-9-759 at Julywada, HNK Div No.26 | Shiva Constn. | 06-05-2006 | 60 days | 01-06-2006 | 30/May/2007 | 199695 | 147858 | 103500.6 |
| 10 | Construction of compound wall around the burial ground in Div.no. 14 | SAMMA RAO .M | 17-03-2006 | 90 days | 02-06-2006 | 01/Jul/2009 | 526073 | 53152 | 37206.4 |
| 11 | Laying of WBM Road and Construction of Section I CC drain from H.No.16-3-496 to End of Lane and 16-3-495 to 16-3-465 at Ekashila Nagar, | Sanjeev. G | 25-03-2006 | 30 days | 27-06-2006 | 31/Jul/2007 | 199232 | 151293 | 105905.1 |
| 12 | L/o CC Road from H.No. 16-9-1136 to 16-9-870 at AC Reddy Nagar, Wgl W.No.7 | HLCCS-Rangampet | 18-05-2006 | 30 days | 07-07-2006 | 19/Apr/2007 | 334404 | 264374 | 185061.8 |
| 13 | L/o CC Road at KUT/59 at 11-5-81 and C/o CC Drain from 17-5-35 to 17-7-116 to to KWT/59 & from 17-8-6 to 17-8-6/1 K.bad Wgl | Shiva Constn. | 01-05-2006 | 30 days | 07-07-2006 | 27/Jun/2007 | 152592 | 118171 | 82719.7 |
| 14 | Construction of CC Drain and CC Road in SRT Colony and Chenna Reddy Colony, in Ward No.6 | Shiva Constn. | 01-05-2006 | 90 days | 10-07-2006 | 17/May/2007 | 640895 | 498438 | 348906.6 |
| 15 | dearing Julifore jungle on Waddepally tank main bund (Read side ) | Shiva Constn. | 01-07-2006 | 30 days | 04-08-2006 | 05/Jul/2007 | 82000 | 76760 | 53732 |
| 16 | CONSTRUCTION OF BRICKWALLAND PILLARS WITH MECCAM BRICKS OM TO PO THE EARHAMBI TO SUMMERSTORE TANK | Shiva Constn. | 10-08-2006 | 90 days | 17-08-2006 | 31/May/2008 | 989117 | 688703 | 482092.1 |
| 17 | Providing Water Supply of E-seva Kendram Shivanagar, Wgl | Komuraiah.S | 22-09-2006 | 30 days | 26-09-2006 | 08/Dec/2006 | 50290 | 47027 | 32918.9 |
| 18 | Formation of Gravel over Existing damaged road and laying of CC Road on Rampet Ammavalipeta, dumping yard, Wgl | Chandra Mohan.P | 30-07-2006 | 30 days | 10-10-2006 | 22/Jun/2007 | 193088 | 167285 | 117099.5 |
| 19 | L/O CC ROAD &C/O CC DRAIN AT 2-2-389 TO INDIAN CAFE 2-2-420 TO 343 AT NEHRU NAGAR HNK DIV.NO.42 | Srinivas Tallapelli | 17-07-2006 | 90 days | 11-10-2006 | 27/May/2008 | 699177 | 629242 | 440469.4 |
| 20 | C/o compoundwall to existing burial ground at Desaipet in Div.No.53 | SAMMA RAO .M | 03-06-2006 | 90 days | 11-10-2006 | 12/Jan/2009 | 970000 | 651833 | 456283.1 |
| 21 | LAYING OF CC ROAD FROM 16-6-188 TO HAND PUPET PERUKAWADA | Chandra Mohan.P | 09-12-2008 | 30 days | 13-10-2006 | 05/Feb/2009 | 103906 | 93023 | 65116.1 |
| 22 | Construction of Section II C.C Drain from H.No.2-4-613/3 to 2-4-614 Ramnagar, HNK | Shiva Constn. | 25-09-2006 | 30 days | 15-10-2006 | 24/Aug/2007 | 104444 | 71974 | 50381.8 |
| 23 | Construction of Compound Wall and Waiting Room a t LB nagar Burrial Ground in Ward No.3 | MSR CONSTRUCTIONS | 23-07-2006 | 90 days | 24-10-2006 | 19/Sep/2009 | 541576 | 457427 | 320198.9 |
| 24 | Raising on C.C Walls fro existing drain from 11-25-811 to 11-25-888 Near at 11-25-801/1 at Kothawada Warangal | Sudhakar.K | 28-09-2006 | 30 days | 01-11-2006 | 06/Aug/2008 | 42941 | 37160 | 26012 |
| 25 | Laying of CC Road from Chandra Electricals to H.no.1-8-62 at Balasamudram, HNk | Amarnath Reddy. D | 06-06-2006 | 60 days | 03-11-2006 | 26/Mar/2008 | 483346 | 129126 | 90388.2 |
| 26 | Laying of C.C Road from EP No. 13/8 to 23/6 at Waddepally Tank | Laxmi Narayana.D | 07-07-2006 | 60 days | 03-11-2006 | 11/Oct/2008 | 218332 | 191911 | 134337.7 |
| 27 | Laying of CC Road from E.P.No.40 UNN H.NO.2-9-43 at Vikasnagar, Hanamkonda, Div.No.37 | Ravinder Rao A | 17-07-2006 | 60 days | 03-11-2006 | 26/May/2009 | 212825 | 187098 | 130968.6 |
| 28 | Replacing of Damaged sluice valves at NGO's Colony SR Hanamknda | Chandra Mohan.P | 12-04-2008 | 30 days | 05-11-2006 | | 99477 | 90687 | 63480.9 |
| 29 | Construction of C.C Box Drain from Thirumala Bar and Restrent to Kumar Electrical Centre on NGOs Colony Main Road, HNK Div.No.38 | Shiva Constn. | 03-11-2006 | 90 days | 08-11-2006 | 24/Aug/2007 | 986490 | 707007 | 494904.9 |
| 30 | Construction of CC Drain & Pipe Line at Beside Raipura Park, HNK in W.No.50 | Shiva Constn. | 03-11-2006 | 15 days | 08-11-2006 | 17/Jan/2008 | 39036 | 34239 | 23967.3 |
| 31 | Laying of 200 mm dia HDPE Pipe Line from Balanjaneyaswamy Temple to H.No.7-1-389, Div No.28, Hnk | Ravinder Rao A | 23-03-2006 | 30 days | 12-11-2006 | 08/Jul/2008 | 87583 | 87583 | 61308.1 |
| 32 | Construction of CRS 1st sort masonary double delidr from Alankar Talkies to 7-7-94 Opp: to Relience Petrol Pump on HNK to Wgl Main Road | Chandra Mohan.P | 31-10-2006 | 60 days | 25-11-2006 | 07/Jan/2009 | 366937 | 53088 | 37161.6 |
| 33 | Levelling the ground at various locations in Div.No.30 for the occassion of Bathukamma festival | Ravinder Rao A | 21-01-2006 | 15 days | 30-11-2006 | 26/May/2009 | 33684 | 28023 | 19616.1 |
| 34 | Construction of Section I CC Drain from 2-8-637 to BNG 24/7 at Bhavani Nagar, HNK D.No.38 | Sampath Rao.K | 25-05-2006 | 30 days | 08-12-2006 | 03/Aug/2008 | 87268 | 79251 | 55475.7 |
| 35 | Construction of CC drain from H.No.2-8-556 to ING 13/11/12 at 2-3-69, 2-6-1184 to 2-6-1205 in Div No. 28 | K. Malla Reddy | 25-05-2006 | 30 days | 08-12-2006 | 16/Jun/2009 | 176691 | 151242 | 105869.4 |
| 36 | L/O OF CC ROAD FROM H.NO 2-7-1176 TO 2-7-1171 AT KANAKADURGA COLONY, HNK DIV. NO 39 | Manohar.M | 05-07-2006 | 30 days | 12-12-2006 | 31/Jul/2007 | 118079 | 86487 | 60540.9 |
| 37 | L/o C.C. Road from 1-5-1 to 188 at Balasamudram, HNK, Div. No. 4 | Manohar.M | 20-07-2006 | 30 days | 12-12-2006 | | 108872 | 81992 | 57394.4 |
| 38 | LAYING OF CC ROAD FROM HNO. 23-3-104 TO 23-3-99 AT SHYAMPET IN DIV.NO.28 | Manohar.M | 15-07-2006 | 60 days | 12-12-2006 | 25/Jan/2008 | 171349 | 122808 | 85965.6 |
| 39 | L/O OF CC ROAD FROM H.NO.23-2-110 TO 23-2-84, 23-2-79 TO 23-2-75, 23-2-80 TO 23-2-89 AT SHAYAMPET. | Manohar.M | 16-07-2009 | 60 days | 12-12-2006 | 25/Jan/2008 | 155000 | 110895 | 77626.5 |
| 40 | Widening of B.T. Road from Station Road to Kashibugga Road, Sai Ram Tractors to existing Gally, Wgl | M/s Madhava Constructons Pvt.,Ltd. | 20-08-2007 | 60 days | | 03/Apr/2008 | 430871 | 366334 | 256433.8 |
| 41 | Widening of B.T. Road from Tare phole Electrical Structure towards Narsampet Road, Warangal. | M/s Madhava Constructons Pvt.,Ltd. | 25-07-2007 | 60 days | | 03/Apr/2008 | 413794 | 192395 | 134676.5 |
| 42 | Widening of B.T. Road from existing transfomer at Bhagath Singh nagar to Venkatrama theatre, Wgl. | M/s Madhava Constructons Pvt.,Ltd. | 20-08-2007 | 60 days | 15-12-2006 | 03/Apr/2008 | 484356 | 410683 | 287478.1 |
| 43 | Filling of Soils and Red Earth in Rayapura Park at HNK | Manohar.M | 24-08-2006 | 60 days | 18-12-2006 | 13/Aug/2007 | 120448 | 72969 | 51078.3 |
| 44 | LAYING CC ROAD AND DRAINS FROM STATIC TANK TO ETARTHEY DRAIN AND CC END 20-2-148 WEST FORT WARANGAL WARD NO 8 | Laxmi Narayana.D | 14-07-2006 | 60 days | 24-12-2006 | 20/Nov/2008 | 151760 | 135814 | 95069.8 |
| 45 | L/O CC ROAD FROM 2-1-666 TO 2-1-667 CC DRAIN 2-1-666 2-1-673 AT GOPALPUR HNK | Manohar.M | 26-07-2006 | 60 days | 06-01-2007 | 15/May/2008 | 68149 | 49980 | 34986 |
| 46 | LAYING OF CC DRAIN FROM 11-23-1359 TO 11-23-1306,1323 TO 1319 TO 1299 TO LB NAGR DIV NO 2 | M/s Shiva Constructions (K. Sudhakar) | 26-04-2007 | 60 days | 19-02-2007 | 10/Jul/2008 | 252000 | 221492 | 155044.4 |
| 47 | Laying of CC Road from 11-21-129 to 11-21-131 Kashibugga, W.No.3 | DAYAKAR.G | 23-08-2007 | 30 days | 19-02-2007 | 15/Oct/2008 | 65000 | 57309 | 40116.3 |
| 48 | Construction of C.C Drain from H.No.11-23-203 to 11-23-212 at Kashibugga WGL in Div.No.3 | Suresh Kumar.S | 27-09-2006 | 30 days | 22-02-2007 | 19/Nov/2007 | 76069 | 67971 | 47579.7 |
| 49 | L/O OF ROAD FROM 2-12-324 TO 2-12-322/1 AT VIDYARANYAPURI HNK | Manohar.M | 28-11-2006 | 60 days | 26-02-2007 | 26/Feb/2008 | 197000 | 176856 | 123799.2 |
| 50 | C/o CC Drains FROM Vidyanagar road to H.No. 25-5-22 at Somidi Main Road Kazipet Div.No.34 | Shiva Constn. | 22-09-2006 | 90 days | 05-03-2007 | 12/Jan/2009 | 460000 | 316373 | 221461.1 |
| 51 | L/o CC Road from H.No. 11-20-80 to 11-20-340 at Mogilicharla road WGl in W.No.8 | Shiva Constn. | 22-11-2006 | 45 days | 06-03-2007 | 27/Jun/2007 | 523494 | 388301 | 271810.7 |
| 52 | FILLING OF GRAVEL AT HNO. 12-8-204 TO 12-8-282/AGAJ R9/9 12-8-230 TO 13-8-231 AND PJR JOLBAT HUNTER ROAD WGL W.NO.19 | Ravi kumar.P | 17-02-2007 | 30 days | 06-03-2007 | 01/Mar/2008 | 111478 | 90433 | 63303.1 |
| 53 | Construction of CC Drain from H.No.5-11-1019 to 5-11-1016 and of 5-11-1069 at Pochamma Kunta, HNK | Ravi kumar.P | 05-11-2007 | 60 days | 03-04-2007 | 27/Sep/2008 | 156257 | 126245 | 88371.5 |
| 54 | C/o Section-I CC Drain from H.No.2-4-243 to 2-4-294 at Ndithara Nagar HNK W.No.41 | Ravi kumar.P | 05-11-2007 | 75 days | 03-04-2007 | 06/Oct/2008 | 306435 | 244699 | 171289.3 |
| 55 | C/o of Slab Culvert on Vikas Nagar at KUC Road | Someshwar Rao | 04-01-2007 | 90 days | 18-04-2007 | 11/Apr/2009 | 643173 | 544998 | 381498.6 |
| 56 | Construction of Static Tank and Section I CC Drain from 10-13-325 to 10-3-317 at Laxmipuram, SC Wada W.No.22 Wgl | Sudhakar.K | 30-04-2007 | 30 days | 07-06-2007 | 29/Jun/2009 | 34936 | 31361 | 21952.7 |
| 57 | Construction of compound to Community Hall at Rammannapet | SAMMA RAO .M | 14-11-2005 | 60 days | 18-06-2007 | 11/Mar/2008 | 63083 | 54307 | 38014.9 |
| 58 | Construction of Mini Box Drain from 15-4-99 to 15-4-69 at Pothana Nagar, Harijanawada, wgl W.No.26 | Laxmi Narayana.D | 15-09-2006 | 30 days | 10-07-2007 | 20/Nov/2008 | 45996 | 39762 | 27833.4 |
| 59 | SUPPLY AND FILLING OF SANDNI PUBLIC GARDEN HNK WARD NO 46 | Manohar.M | 01-08-2007 | 30 days | 23-08-2007 | 17/Jan/2008 | 52616 | 42994 | 30095.8 |
| 60 | Strenghting of Ex-Damaged road form 80ft Road to Desaipet Road at Desaipet | DAYAKAR.G | 02-08-2007 | 60 days | 11-09-2007 | 22/May/2009 | 488000 | 404526 | 283168.2 |
| 61 | L/O METAL AND GRAVEL PATCHES AT PUBLIC GARDEN AREA DURING PROGRAMME | Manohar.M | 06-08-2007 | 30 days | 27-09-2007 | 17/Jan/2008 | 57956 | 48142 | 33699.4 |
| 62 | contruction of cc drain 380 mm size from 11-25-1066 to 1071/1 at kothawada wno 02 | Sri Venkateshwara Constructions | 19-06-2008 | 30 days | 29-10-2007 | 19/Aug/2008 | 60877 | 54240 | 37968 |
| 63 | CLEANING THE NALA AT SIDDARTHA NAGAR AND BABU CAMP BESIDE WADDEPALLY SS TANK | Kumaraswamy. B | 02-07-2007 | 15 days | 20-11-2007 | 12/Jan/2009 | 31872 | 29006 | 20304.2 |
| 64 | Formation of Gravel Road at Meankatta Mallamma Temple for Bathukamma Festival in Div.No.6 | Suresh Kumar.S | 18-10-2007 | 30 days | 23-11-2007 | 21/May/2008 | 32188 | 27157 | 19009.9 |
| 65 | formation of gravel road at Chinna Waddepally Cheruvu, at Shanthinagar, Division No.1 (Bathukamma Festival | Suresh Kumar.S | 08-10-2007 | 30 days | 23-11-2007 | 21/May/2008 | 44742 | 36748 | 25723.6 |
| 66 | FORMATION OF GRAVEL ROAD CHOASTHA TO EPNO NP/20 WEAVERS COLONY IN WARD NO 1 | SATISH KUMAR . N | 17-04-2008 | 30 days | 25-11-2007 | 08/Jan/2008 | 39823 | 33596 | 23517.2 |
| 67 | Patching to Dividers A.E Circle, Kazipet. | M/s Laxmi Constructions | 06-07-2006 | 45 days | 25-11-2007 | 29/Jun/2009 | 162000 | 104385 | 73069.5 |
| 68 | L:/o of CC Road at HNK | M/s Wadera Labour contract Co.op. Society Shivanagar Warangal | 07-11-2007 | 60 days | 30-11-2007 | 09/May/2009 | 310097 | 257389 | 180172.3 |
| 69 | Laying of WBM Road from 2-7-37 to 2-7-78 at Excise Colony, HNK | Someshwar Rao | 10-10-2009 | 30 days | 30-11-2007 | 30/May/2009 | 189103 | 152115 | 106480.5 |
| 70 | Formation Gravel from 2-4-863 to 2-4-1174/2 and Low Level areas | Laxmi Narayana.D | 06-07-2007 | 30 days | 06-12-2007 | 29/Feb/2008 | 60065 | 51226 | 35858.2 |
| 71 | Gravel formation at Gouthaminagar internal toanes W.No.43 | Laxmi Narayana.D | 12-07-2007 | 30 days | 06-12-2007 | 19/Apr/2008 | 82819 | 71145 | 49801.5 |
| 72 | Supply and filling of gravel at Reddypuram dumping ground Hnk | Laxmi Narayana.D | 18-09-2007 | 30 days | 06-12-2007 | 19/Apr/2008 | 63315 | 53417 | 37391.9 |
| 73 | L/O CC ROAD FROM 2-4-880 TO 2-4-444 AT VENKAT RAO NAGAR COLONY RMANAGAR HNK DIV.NO.41 | Srinivas Tallapelli | 08-12-2006 | 60 days | 09-12-2007 | 15/Jul/2008 | 422941 | 385247 | 269672.9 |
| 74 | F/O GRAVEL FOR SUDDALA BATHUKAMMA AND DASARA FESTIVAL AT OPP.RUDHRAMAMBA NAGAR WGL | Ravi kumar.P | 11-10-2007 | 30 days | 10-12-2007 | 16/Feb/2008 | 35896 | 31303 | 21912.1 |
| 75 | laing of metal road from h no 2-112-293/1 to 2-12-293/36 at vidyaranyapuri hnk ward no 43 | Sanjeev. G | 10-10-2007 | 30 days | 12-12-2007 | 30/Sep/2008 | 143990 | 116016 | 81211.2 |
| 76 | F/O GRAVEL FOR SUDDALA BATHUKAMMA AND DASARA FESTIVAL AT BESTAM CHERUVU RANGASHIPET WGL | Ravi kumar.P | 11-10-2007 | 30 days | 13-12-2007 | 16/Feb/2008 | 38929 | 33949 | 23764.3 |
| 77 | C/o of Community Hall Near 9-4-70 at Charbouwly Water Tank, Wgl | Komuraiah.S | 15-08-2007 | 60 days | 13-12-2007 | | 484096 | 436460 | 305522 |
| 78 | L/O CC ROAD FROM 2-4-826 TO 815 AT RAMNAGAR HNK DIV.NO 41 | Srinivas Tallapelli | 08-12-2006 | 45 days | 14-12-2007 | 15/Jul/2008 | 432771 | 386965 | 270875.5 |
| 79 | Laying of C.C Road from Church to 2-9-1079 at Waddepally, Harijanawada | Manohar.M | 30-11-2006 | 45 days | 14-12-2007 | 16/Nov/2008 | 202060 | 182705 | 127893.5 |
| 80 | L/O CEMENT ROAD FROM 3-8-18 TO 112 x 3-8-115 TO 123 AT KUMARPALLY HNK | Srinivas Tallapelli | 19-11-2007 | 45 days | 16-12-2007 | 27/May/2008 | 199713 | 182882 | 128017.4 |
| 81 | L/O CC PATENS FROM FPNO PJH TO 6-2-321 AT VIJAYA TALKIES ROAD | Manohar.M | 29-05-2007 | 60 days | 29-12-2007 | 15/May/2008 | 274593 | 252656 | 176859.2 |
| 82 | L/O CC ROAD AT KAKAJI COLOY HNK IN DIV NO 46 | Manohar.M | 03-08-2007 | 45 days | 29-12-2007 | 15/May/2008 | 274456 | 246429 | 172500.3 |
| 83 | Laying of CC Road from H.No.1-9-1128 to 1-9-932,1-9-1129/1 at Sahakar Nagar Hanamkonda in Div.No.30 | M/s M/s WLCCS Ltd., Prakash Reddypet (V. Srinivas) | 07-11-2007 | 75 days | 02-01-2008 | 09/Feb/2009 | 491734 | 428064 | 299644.8 |
| 84 | Construction of section - I C.C. Drain from H.No.2-4-1564to 2-4-1572 at Ashok Colony, Hanamkonda, | Naresh Kumar.D | 22-10-2007 | 30 days | 04-01-2008 | 06/Jun/2008 | 98435 | 85049 | 59534.3 |
| 85 | L/O OF CC ROAD FROM H .NO. 2-9-268/2 TO 2-9-268/1 AT VIKAS NAGAR HNK DIV NO 37 | Manohar.M | 05-02-207 | 30 days | 08-01-2008 | 29/Aug/2008 | 125594 | 112941 | 79058.7 |
| 86 | L/O MB ROAD FROM H.NO.2-7-226 TO EP NO.CES 4, 2-7-228 AT EXCISE COLONY HNK | VCR ASSOCIATES | 23-04-2007 | 60 days | 10-01-2008 | 30/May/2009 | 145451 | 105510 | 73857 |
| 87 | Laying of WBM Road form H.No.2-7-1224 to 2-7-1162, 2-7-1147 at Excise Colony Hanamkonda in Div.No. 39 | VCR ASSOCIATES | 23-10-2007 | 60 days | 10-01-2008 | | 175222 | 125554 | 87887.8 |
| 88 | Supply of tharmacool Ferrys for mixing of Bleaching and copper sulphate in Bhadrakali S.S.Tank, Warangal | Ravi kumar.P | 17-12-2008 | 15 days | 15-01-2008 | | 21000 | 20476 | 14333.2 |
| 89 | Proposed Inter Connections at H.No.15-6-75 at Papaiahpet Harijanawada, Warangal | Chandra Mohan.P | 20-08-2007 | 30 days | 16-01-2008 | | 34970 | 31880 | 22316 |
| 90 | providing parking tiles to North and East side platforms at CRC centre urus, Kareemabad Wgl | Chandra Mohan.P | 20-08-2007 | 30 days | 16-01-2008 | | 99500 | 80627 | 56438.9 |
| 91 | Filling of pot holes and side beams at the road from pothana Mandiram to Dobbighat on occasion of Bathukamma and Dasara Festivals | Ravi kumar.P | 06-12-2008 | 15 days | 20-01-2008 | | 38000 | 31374 | 21961.8 |
| 92 | Formation of Gravel Road and Filling for Bathukamma and Dasara Festival at West Fort Dharwaja, Warangal in Ward.No.8 | Ravi kumar.P | 20-11-2008 | 15 days | 28-01-2008 | | 24939 | 22737 | 15915.9 |
| 93 | L/O OF CC ROAD FROM EPNO.32 BNH 38/8TO 1-7-565 AT SRINIVAS NAGAR HNK DIV NO29 | Manohar.M | 30-11-2006 | 45 days | 29-01-2008 | 13/May/2008 | 177254 | 162566 | 113796.2 |
| 94 | Laying of WBM Road from H.No.2-1-64 to 2-1-35 at Saraswathi Nagar, HNK in Ward No.42 | Sampath Rao.K | 30-12-2006 | 30 days | 29-01-2008 | 05/Aug/2008 | 97005 | 83629 | 58540.3 |
| 95 | contruction of vr cc slab culvert beside venkateshwara temple s.vn road in ward no 9 wgl | Komuraiah.S | 02-01-2007 | 90 days | 29-01-2008 | 06/Aug/2008 | 979670 | 883435 | 618404.5 |
| 96 | Laying of WBM Road at H.No.1-7-359, Construction of C.C Drain from 1-7-359, 1-7-366/2 to 1-7-329 at Revenue Colony, HNK | SHYAMSUNDER REDDY. D | 25-11-2007 | 60 days | 30-01-2008 | 17/Jun/2008 | 320327 | 283686 | 198580.2 |
| 97 | C/O SLAB CULVERT & L/O CC ROAD AT PINJARLA STREET HNK DIV NO.46 | Manohar.M | 28-09-2007 | 30 days | 12-02-2008 | 15/May/2008 | 98910 | 89532 | 62672.4 |
| 98 | Construction of Drain and Laying of C.C Road from H.No.3-2-10 to 3-2-6 and 3-2-11 to 3-2-20 at Rayapura, HNK Ward No.50 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 01-12-2006 | 30 days | 12-02-2008 | 24/Jun/2008 | 129150 | 113149 | 79204.3 |
| 99 | Construction of CC drains from 2-9-557 to EP No. ING8 at Srinivasa Colony, HNK D.No.37 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 01-12-2006 | 60 days | 12-02-2008 | 05/Sep/2008 | 310097 | 277389 | 194172.3 |
| 100 | L/O CC ROAD FROM HNO 2-12-345 TO EPNO. VPH 15/4 AT VIDYARANYA PURI HNK WNO.43 | Manohar.M | 09-10-2007 | 30 days | 12-02-2008 | 10/Nov/2008 | 89922 | 79406 | 55584.2 |
| 101 | REPAIRS TO RR WALL ON SULLAGEDRAINFROM11-25-211 TP 11-30-264 AT 80` ROAD KOTHAWADA WGL | M/s Shiva Constructions (K. Sudhakar) | 09-11-2007 | 30 days | 16-02-2008 | 06/Aug/2008 | 189483 | 158116 | 110681.2 |
| 102 | Construction of Section I and Section II C.C.Drain H.No.4-2-265/1 to 4-2-350 and 4-2-364 to 4-2-380 at Kothur, HNK Div. No.45 | Shiva Constn. | 13-02-2008 | 30 days | 21-02-2008 | 26/Nov/2008 | 496937 | 376429 | 263500.3 |
| 103 | Laying of CC Road from 2-7-1241 to 2-7-1250 at Vijaypal Colony, HNK D.No.39 | Manohar.M | 15-02-2008 | 60 days | 23-02-2008 | 09/Jun/2009 | 323098 | 273886 | 191720.2 |
| 104 | Construction of CC Road from 2-9-587 to 2-9-573/3 at Srilaxminagar Colony, HNK D.No.37 | Manohar.M | 15-02-2008 | 45 days | 23-02-2008 | 09/Jun/2009 | 149968 | 127443 | 89210.1 |
| 105 | LAYING OF BT ROAD FROM CHANAM TO EXISTING BT ROAD WORK SIDE DIV 11 BALANCE WORK | SHREE ENGINEERING WORKS | 19-11-2008 | 60 days | 25-02-2008 | 30/Sep/2008 | 585929 | 512766 | 358936.2 |
| 106 | Laying of CC Road from 16-6-195 to 16-6-19 at Perukawada, Wgl in W.No.17 | Chandra Mohan.P | 08-12-2007 | 75 days | 26-02-2008 | 22/Jun/2007 | 616059 | 522776 | 365943.2 |
| 107 | L/O WBM ROAD FORM 19-10-45 TO 19-10-222 AT SAINAGAR RANGASAIPET WAEANGAL IN WARD NO 10 | GORRE AMARNATH | 19-01-2008 | 45 days | 26-02-2008 | 31/Mar/2009 | 197117 | 167088 | 116961.6 |
| 108 | didening of road from H. No 10-13-66/1 to e.1 pole no lpw 2at vivekannda junior college be kamela road girmazipet wgl | Komuraiah.S | 05-10-2007 | 90 days | 01-03-2008 | 18/Aug/2008 | 990650 | 880343 | 616240.1 |
| 109 | L/O WBM ROAD FROM H.NO. 2-1-485/2 TO URBAN HEALTH CENTER AT SAMMAIAH NAGAR HNK | Suresh Kumar.S | 28-01-2006 | 30 days | 03-03-2008 | 24/Jan/2009 | 40834 | 24001 | 16800.7 |
| 110 | Construction of Section - I Drain from H.No.24-03-114 to opp:Church at Fathimanagar, Kazipet, W.No.32 | Laxmi Narayana.D | 19-02-2007 | 30 days | 11-03-2008 | 06/Jun/2008 | 62027 | 56324 | 39426.8 |
| 111 | C/o Section-I CC Drain from H.No. 1-7-207/2 to EPNO RCR 15 at Revenue Colony, Hanamkonda | Laxmi Narayana.D | 15-01-2007 | 30 days | 11-03-2008 | 04/Jul/2008 | 47046 | 42714 | 29899.8 |
| 112 | Providing B.T Patch Work from Old Bus Depot to Sumangali (Waddepally Road) Juni Hon Presiday School, Via Ambedkar Bhavan | SHREE ENGINEERING WORKS | 07-01-2008 | 30 days | 27-03-2008 | 26/Apr/2008 | 106936 | 102202 | 71541.4 |
| 113 | Construction of C.C Drain from B.No.33/22 to H.No.25-11-2/A and laying of C.C Road at B.No.33/22 Ambedkar Nagar, Kazipet | Laxmi Narayana.D | 30-11-2006 | 45 days | 27-03-2008 | 18/Jul/2008 | 171300 | 153795 | 107656.5 |
| 114 | Laying of C.C and WBM Road from H.No.2-6-1058 to 2-6-1051/2, EP. NO.NGS 16/18 to NGS 16/22 at KLN Reddy Colony, HNK Div NO.28 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 12-03-2007 | 45 days | 27-03-2008 | 18/Sep/2008 | 973282 | 838260 | 586782 |
| 115 | Construction of CC Road from 2-10-660/1 to 2-10-661/2, 2-10-564 to 2-10-564/2, 2-10-677 to EP.No. BCK13, 2-10-572 to EP No. TCK 11/3 at Teachers Colony Phase - I | M/s. P.W.L.C.Coop.Society, Laxmipuram | 10-12-2007 | 90 days | 27-03-2008 | 29/Nov/2008 | 716892 | 602996 | 422097.2 |
| 116 | widening the library junction at Balasamudram hnk | Naga Raju T | 30-11-2007 | 60 days | 27-03-2008 | 17/Mar/2009 | 234632 | 199408 | 139585.6 |
| 117 | Construction of CC Drain section from H.No.11-21-129 to 11-21-87 at Kashibugga Warangal in W.No.3 | Laxmi Narayana.D | 18-10-2007 | 30 days | 04-04-2008 | 16/Jul/2008 | 89106 | 80989 | 56692.3 |
| 118 | L/o CC Road and Construction of CC Drain at Padmasali Wada from H.No.20-2-127 to turning of road and CC Drain from 20-2-127 to 20-2-7 and from 20-2-91 to Opp: 20-2-7 at West Fort Warangal Ward No.08 | Laxmi Narayana.D | 14-07-2006 | 30 days | 04-04-2008 | 05/Dec/2008 | 51400 | 45564 | 31894.8 |
| 119 | Construction of C.C Drain from H.No.22-6-197 to Old Post Office, Desaipet, Wgl in Ward No.53 | Sanjeev. G | 25-02-2008 | 30 days | 12-04-2008 | 28/Nov/2008 | 155000 | 132448 | 92713.6 |
| 120 | Construction of Section I & II CC Drain and Laying of RCC Slab over existing box drain in W.No.2 | Sanjeev. G | 25-01-2008 | 45 days | 13-04-2008 | 03/Jun/2009 | 737468 | 314930 | 220451 |
| 121 | Construction of Compound Wall to Open Place at B.n. Rao Colony, W.No.3 | Sathyanarayana.B | 05-03-2008 | 30 days | 20-04-2008 | 12/May/2008 | 123993 | 109476 | 76633.2 |
| 122 | L/o cc road waddepalli hnk | Sanjeev. G | 20-03-2008 | 30 days | 25-05-2008 | 25/May/2009 | 266010 | 219680 | 153776 |
| 123 | Desilting form existing box drain from Dhana Laxmi Iron Marchent to Goral | Shiva Constn. | 02-04-2008 | 15 days | 01-06-2008 | 17/Nov/2008 | 20000 | 18230 | 12761 |
| 124 | C/O box drain and L/o RCC slab over existing drain besid Venkateshwara Swamy TEmple to Pothananagar Road Wgl.No.19 | Shiva Constn. | 03-05-2006 | 90 days | 02-06-2008 | 20/May/2009 | 789501 | 651601 | 456120.7 |
| 125 | Construction of C.C Drain from H.No.18-7-96 to Static Tank and 18-7-24 to 1134 Opp: H.No.18-7-100 at Kareemabad, Wgl in Ward No.14 | Shiva Constn. | 01-04-2008 | 75 days | 04-06-2008 | 17/Oct/2008 | 494653 | 370933 | 259653.1 |
| 126 | L/o CC Road from 16-1-640/2 to EP NO. SRT/30/1 at SRR Tota in W.No.18 | Mallaiah. A | 14-12-2007 | 60 days | 04-06-2008 | 25/Oct/2008 | 207109 | 185414 | 129789.8 |
| 127 | Laying of C.C Road and WBM Road from H.No.16-3-118 to 1023 and 16-3-1001 to 935 at Vidhyanagar Wgl. Ward No.15 | Shiva Constn. | 01-04-2008 | 90 days | 04-06-2008 | 04/Nov/2008 | 593067 | 469980 | 328986 |
| 128 | C/o box drain from H.No. 2-6-1524 to rajeshwari iron shop on NGOs Colony Main Road HNK | Mallaiah. A | 07-09-2007 | 45 days | 04-06-2008 | 06/Nov/2008 | 206347 | 183393 | 128375.1 |
| 129 | Lonctruction of C.C Road from Fort Road to Khamma Road at Rudrambha Nagar Warangal Ward No.16 | Shiva Constn. | 01-04-2008 | 75 days | 04-06-2008 | 10/Nov/2008 | 536973 | 436484 | 305538.8 |
| 130 | Construction of Section I C.C Drain from H.No. 17-4-199 to 17-4-119 and H.No. 18-5-139 to 18-5-234/1 and 18-5-129/3 at Kareemabad Wgl W.No.13 | Shiva Constn. | 06-01-2008 | 75 days | 04-06-2008 | 14/Nov/2008 | 494283 | 367635 | 257344.5 |
| 131 | Construction of Section I CC Drain from Static Tank to 20-9-42 at Kapuwada in W.No.8 Middle Fort, Wgl | Mallaiah. A | 02-01-2008 | 60 days | 04-06-2008 | 19/Nov/2008 | 237195 | 178447 | 124912.9 |
| 132 | Laying of WBM Road with C.C Road from H.NO.16-9-1015 to 16-9-1337 at AC Reddy Nagar Warangal in W.No.7 | Shiva Constn. | 01-04-2008 | 75 days | 04-06-2008 | 19/Nov/2008 | 476662 | 393540 | 275478 |
| 133 | Laying of Gravel Road and Shed at Shamnunipet Warangal Ward No.11 | Shiva Constn. | 01-04-2008 | 60 days | 04-06-2008 | 19/Nov/2008 | 261297 | 190578 | 133404.6 |
| 134 | Construction of Section - I C.C. Drain and laying of C.C. road at east middle fort Warangal in W.No.9 | Shiva Constn. | 01-04-2008 | 90 days | 04-06-2008 | 19/Nov/2008 | 494770 | 385639 | 269947.3 |
| 135 | L/o CC Road and C/o Sec-II CC Drain from 18-2-68 to 78 and 18-2-49 to 18-2-92 at Ursu Hanamkonda Wgl.No. 11 | Mallaiah. A | 02-07-2008 | 60 days | 04-06-2008 | 03/Dec/2008 | 299384 | 245034 | 171523.8 |
| 136 | Arreasting of leakages on 4 dia to 24 dia pipe lines in Elec. Ward No.s 19,25 to 27 and 51,52 | Chandra Mohan.P | 25-02-2007 | 30 days | 04-06-2008 | 12/Jan/2009 | 41000 | 37367 | 26156.9 |
| 137 | L/o 140 mm dia HDPE pipeline from EP No. PKM 32/1 to PKM 38/2 at Kothawada Wgl | Chandra Mohan.P | 22-10-2007 | 30 days | 04-06-2008 | 05/Feb/2009 | 65467 | 59607 | 41724.9 |
| 138 | Arreasting of leakages on 4 dia to 24 dia pipe lines in Elec. Ward No.21 | Chandra Mohan.P | 01-10-2007 | 30 days | 04-06-2008 | 07/Feb/2009 | 99391 | 90604 | 63422.8 |
| 139 | L/o WBM ROAD FROM EPNO.HRS 9115 TO 91/5/1,91/5/2 AT Hunter Road hnk div.no.28 | MSR CONSTRUCTIONS | 30-11-2007 | 60 days | 04-06-2008 | 22/May/2009 | 343602 | 272542 | 190779.4 |
| 140 | Construction of CC drain from H.No. 3-1-215 to 3-1-238 and 3-1-207 to 3-1-209 at Kakatiya Colony Hanamonda in Div.No.50 | M/s Thattekunta Waddera Sanitary Civil Works Labour contract Paraspara sahayaka sangam LTd | 05-03-2008 | 45 days | 04-06-2008 | | 205966 | 183040 | 128128 |
| 141 | L/o 110 mm dia HDPE pipeline from 7-5-55 to 7-5-22/2 at Machili Bazar Kapuwada slum HNK | Chandra Mohan.P | 12-11-2007 | 30 days | 05-06-2008 | 17/Oct/2008 | 82978 | 77550 | 54285 |
| 142 | Attending of Petty Water Supply Works in AE Circle No.11 | Chandra Mohan.P | 14-03-2008 | 30 days | 05-06-2008 | 10/Nov/2008 | 72000 | 65614 | 45929.8 |
| 143 | Laying of CC Road from Main Road to Burial Ground in Ward .No. 5 Warangal Beside Venkata Rama Talkies | DAYAKAR.G | 05-09-2007 | 30 days | 05-06-2008 | | 308251 | 274387 | 192070.9 |
| 144 | Laying of CC Road from H.No.18-123/1 to 11-18-129/1 at Kashibugga Co-op Housing Society, Wgl in W.No.4 | Sathyanarayana.B | 12-04-2008 | 45 days | 06-06-2008 | 18/Aug/2008 | 193517 | 161697 | 113187.9 |
| 145 | Construction of CC Drain & Section I from 11-19-127 to 11-19-48 at Kashibugga, Wgl in W.No.3 | Sathyanarayana.B | 12-04-2008 | 45 days | 06-06-2008 | 18/Aug/2008 | 231358 | 180529 | 126370.3 |
| 146 | Laying of C.C road from H.No.2-8-188 to 2-8-184 at Wadepaly, HNK Div No.38 | Manohar.M | 20-11-2007 | 30 days | 07-06-2008 | 14/Aug/2008 | 101716 | 90481 | 63336.7 |
| 147 | Laying oc C.C Road from H.No.2-8-188 to 2-8-190 at Waddepally, HNK Div No.35 | Manohar.M | 20-11-2007 | 30 days | 07-06-2008 | 14/Aug/2008 | 111621 | 99196 | 69437.2 |
| 148 | Laying of CC Road from EP.No. BES 6/6A/3 to 2-7-1231/1, 2-8-6931/1, 2-7-1234 at Excise Colony, HNK in Div No.38 | Manohar.M | 10-12-2007 | 90 days | 07-06-2008 | 25/Feb/2009 | 677265 | 588106 | 411674.2 |
| 149 | Inter connection of 150 mm RCC pipeline from MRHL 17 to 15-3-590 at Rayampet Wgl in Div. No.6 | Chandra Mohan.P | 29-10-2007 | 30 days | 09-06-2008 | 31/Oct/2008 | 57903 | 52781 | 36946.7 |
| 150 | const. RCC slab culverts at H.no. 11-30-127 and 11-25-928 at Kothawada Wgl | HLCCS-Rangampet | 28-07-2007 | 30 days | 10-06-2008 | 27/Nov/2008 | 212106 | 186147 | 130302.9 |
| 151 | CONT. OF CC DRAINS FROM H.NO.24-4-211 TO 24-4-201 AT SHSTRI NAGAR KAZIPET IN WARD NO. 31 | Kumaraswamy. B | 22-12-2007 | 30 days | 11-06-2008 | 06/Oct/2008 | 113171 | 90914 | 63639.8 |
| 152 | Construction of Section I CC Drain from 10-10-50 to 10-10-58 and 1617 at Yellamma Temple, Wgl in W.No.22 | Ravi kumar.P | 03-11-2008 | 30 days | 11-06-2008 | 18/Jun/2009 | 105000 | 82332 | 57632.4 |
| 153 | CONTRUCTION OF CC DRAIN FROM 11-1-246 LI CH15 CHENNA REDDY COLONY WARANGAL IN WARD NO 6 | M/s. ASHOKA DALITHA CIVIL AND SANITATION LCWM C & S LTD., | 09-12-2007 | 30 days | 13-06-2008 | 11/Aug/2008 | 107925 | 96558 | 67590.6 |
| 154 | Laying of C.C Road from H.No.2-5-897 to 2-5-904 at Circuit House Road, HNK Ward.No.40 | Manohar.M | 15-07-2007 | 60 days | 13-06-2008 | 30/Sep/2008 | 257546 | 225541 | 157878.7 |
| 155 | Laying of WBM Road from E.P. ING 26/2 to Opp: H.No.2-8-396 at Ragavendra Nagar, HNK Div No.38 | Manohar.M | 15-02-2008 | 30 days | 13-06-2008 | 25/Feb/2009 | 116672 | 95088 | 66561.6 |
| 156 | Laying of C.C. road from H.No.2-4-335 to 2-4-422 and 2-4-4891 Hnk. | Naresh Kumar.D | 13-09-2007 | 60 days | 16-06-2008 | 12/Nov/2008 | 563720 | 496956 | 347869.2 |
| 157 | Laying of C.C. Road form Rajaiah Kumar to H.No.2-5-889 to 2-5-899 to 2-5-901 | Naresh Kumar.D | 05-10-2007 | 60 days | 16-06-2008 | 13/Nov/2008 | 356440 | 311115 | 217780.5 |
| 158 | Laying of WBM Road from H.No.2-7-1315 to 2-7-1370 at Vijpai Colony, HNK Div No.39 | Naresh Kumar.D | 10-12-2007 | 45 days | 16-06-2008 | 29/Nov/2008 | 146709 | 118880 | 83216 |
| 159 | L/o CC Road Bhavani Nagar | Sanjeev. G | 02-04-2008 | 30 days | 16-06-2008 | 25/May/2009 | 205223 | 172110 | 120477 |
| 160 | Laying of WBM Road and CC Drain from 1-8-43 to 1-8-46 & 1-8-48 at Balasamudram, HNK W.No.40 | Ravi kumar.P | 13-03-2008 | 30 days | 17-06-2008 | 23/Jun/2009 | 199220 | 150140 | 105098 |
| 161 | Formation of Gravel Road from H.No.11-25-1212 to 11-25-1217 at Kothawasda in Div.No. 52 | Ravi kumar.P | 27-05-2008 | 15 days | 17-06-2008 | | 12000 | 9701 | 6790.7 |
| 162 | Filling of Pot Holes and Partial levelling the Bhadrakali Bund from Ramannapet Burrial Ground to Gayathri Temple on Bhadrakali Bund Warangal | Ravi kumar.P | 27-03-2008 | 30 days | 17-06-2008 | | 98835 | 81151 | 56805.7 |
| 163 | Laying of WBM Road and Construction of CC Drain from 2-5-131 to 2-5-904 at HNK | Ravi kumar.P | 15-04-2008 | 45 days | 18-06-2008 | 23/Jun/2009 | 204524 | 158678 | 111074.6 |
| 164 | Laying of C.C. Road from H.No.25-4-252 to 25-4-293 at Vishnupuri, Kazipet | Naresh Kumar.D | 24-01-2008 | 30 days | 19-06-2008 | 23/Jul/2008 | 83047 | 72733 | 50913.1 |
| 165 | contruction of 300 mm size drain from 11-25-865 to 11-25-872 of kothwada in ward no 52 | Sri Venkateshwara Constructions | 08-03-2008 | 30 days | 19-06-2008 | 06/Aug/2008 | 82000 | 71471 | 50029.7 |
| 166 | Laying of 380mm size drain from H.No.11-25-1210 to 11-25-1217 at Kothawada in Wgl | Sri Venkateshwara Constructions | 01-01-2008 | 30 days | 19-06-2008 | 29/Aug/2008 | 76000 | 66889 | 46822.3 |
| 167 | formation of Gravel Road From 3-16-229 to 3-16-212 at Peddamma Gadda Warangal in Div. 51 | Sri Venkateshwara Constructions | 29-10-2007 | 30 days | 19-06-2008 | 15/Sep/2008 | 32500 | 26622 | 18635.4 |
| 168 | Restoration of Existing damaged drains by construction of C.C. Drain at Ambedkar bhavan wgl Ward No.14 | M/S SAI KRUPA ENTERPRISES | 20-12-2007 | 30 days | 19-06-2008 | 07/Feb/2009 | 100530 | 89032 | 62322.4 |
| 169 | Laying of C.C. Road from H.No.2-4-613 to 2-4-804 at Ramnagarm, HNK W.No.41 | Manohar.M | 07-03-2008 | 60 days | 19-06-2008 | 24/Mar/2009 | 235705 | 200040 | 140028 |
| 170 | Construction of Damaged Compound wall at KUC Filters HNK | Rajendra Prasad | 10-04-2008 | 30 days | 19-06-2008 | 24/Mar/2009 | 92445 | 81907 | 57334.9 |
| 171 | Construction of Section II CC Drain from H.No.2-8-691 to 2-8-688/1 at Excise Colony, HNK Div No.38 | Rajendra Prasad | 05-06-2008 | 30 days | 19-06-2008 | 26/Jun/2009 | 95754 | 82236 | 57565.2 |
| 172 | Constructed of protected, wall and laying of 1000 mm dia pipes at H.No.22-8-301 at Weavers Colony, Mangalivagu, Warangal in W.No.53 | MSR CONSTRUCTIONS | 04-04-2008 | 60 days | 20-06-2008 | 22/May/2009 | 495893 | 448489 | 313942.3 |
| 173 | L/O CC ROAD FROM EPNO. RTR 30 TO HNO. 12-8-294/14/ AT HUNTER ROAD WGL IN DIV.NO.19 | Ravi kumar.P | 03-03-2008 | 30 days | 21-06-2008 | 15/Apr/2008 | 99081 | 87815 | 61470.5 |
| 174 | laying cc road near dilip store to jpn W/ss/21 main road girmajipet warangal. | Komuraiah.S | 08-03-2008 | 30 days | 21-06-2008 | 11/Aug/2008 | 96849 | 86510 | 60557 |
| 175 | Formation of Gravel Road from EP No.PJR 18 to 12-8-278 at Hunter Road in Div No.19 | Ravi kumar.P | 03-03-2008 | 30 days | 21-06-2008 | 20/Aug/2008 | 98945 | 81266 | 56886.2 |
| 176 | L/O CC ROAD FROM EPNO. PJR 8/2 TO PJR 8/6 AT HUNTER ROAD DIV.NO.(19) | Ravi kumar.P | 03-03-2008 | 30 days | 21-06-2008 | 15/Oct/2008 | 99426 | 87715 | 61400.5 |
| 177 | C/O OF SEC 1CC DRAIN FROM HNO.12-8-172/1 TO 12-8-166 AT RAMANNAPET | Ravi kumar.P | 29-10-2007 | 30 days | 21-06-2008 | 15/Oct/2008 | 86100 | 75532 | 52872.4 |
| 178 | C/O OF SEC-I CC DRAIN 20-8-88 TO 20-8-84 AND 20-8-123 TO 20-8-91 AT HANUMAN NAGAR WGL DIV.NO.8 | Ravi kumar.P | 04-10-2008 | 30 days | 21-06-2008 | 19/Mar/2009 | 97702 | 87335 | 61134.5 |
| 179 | L/O CC ROAD DRAINS HNO 16-11-252 TO BORE AT CHINTAL WGL IN DIV.NO.7 | Ravi kumar.P | 14-03-2008 | 30 days | 21-06-2008 | 19/Mar/2009 | 98550 | 83485 | 58439.5 |
| 180 | Laying of CC Road from 16-6-158 to 16-6-149 at Perukawada, Wgl W.No.17 | Srinivas. B | 11-12-2007 | 30 days | 23-06-2008 | 07/Jan/2009 | 74095 | 63689 | 44582.3 |
| 181 | Arrestng of Leakages in various locations in Ward No.12 to 18 Wgl | M/S SAI KRUPA ENTERPRISES | 14-12-2007 | 30 days | 23-06-2008 | 07/Feb/2009 | 49736 | 46535 | 32574.5 |
| 182 | Arresting of leakages in various locations at LB Nagar Wgl. W.No.2 | M/S SAI KRUPA ENTERPRISES | 11-12-2007 | 30 days | 23-06-2008 | 04/Mar/2009 | 29612 | 27736 | 19415.2 |
| 183 | Laying of CC Road and Construction of Drain Sec-I from H.No: 20-14-114 to 20-14-118 side line and 20-14-47 to 20-14-48/1 at East fort, Warangal in Ward no. 9 | M/s ADLCMA CO-Op society. | 29-08-2007 | 45 days | 23-06-2008 | 11/Nov/2009 | 169506 | 157710 | 110397 |
| 184 | Laying of WBM Road from 2-8-324 to 2-8-316/1 at Vijaypal Colony, D.No.38 | Sanjeev. G | 11-04-2009 | 45 days | 25-06-2008 | 26/Jun/2009 | 323589 | 258333 | 180833.1 |
| 185 | Estimate for the Providing MS frame with covers at Charbouli Water Tank | Chandra Mohan.P | 06-10-2007 | 30 days | 26-06-2008 | 27/Nov/2006 | 17000 | 15897 | 11127.9 |
| 186 | Laying of CC Road from 11-1-47 to 11-1-153 at SRT Colony, Wgl W.No.56 | Sathyanarayana.B | 01-04-2008 | 45 days | 26-06-2008 | 18/Aug/2008 | 211854 | 175089 | 122562.3 |
| 187 | Laying of C.C Road from H.No.2-6-1058 to Daffodals School at KLN Reddy Colony HNK, Div No.38 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 15-02-2008 | 30 days | 26-06-2008 | 18/Sep/2008 | 63754 | 57073 | 39951.1 |
| 188 | Moderanisation of subash statue at Govindarajulagutta in Div.No.21 | Chandra Mohan.P | 20-08-2007 | 30 days | 26-06-2008 | 21/Oct/2008 | 115619 | 108056 | 75639.2 |
| 189 | C/o CC Road from H.No.2-5-781 to 2-5-790/1 in D.No.40 badi masid HNK | Amarnath Reddy. D | 22-07-2006 | 30 days | 26-06-2008 | 22/Oct/2008 | 87210 | 74958 | 52470.6 |
| 190 | Construction of Store and Watchmen room at Eye Hosptial S.R Premises at Wgl | Chandra Mohan.P | 25-01-2008 | 30 days | 26-06-2008 | 07/Jan/2009 | 98970 | 88402 | 61881.4 |
| 191 | contruction wmmo at bhadrakali sump at wgl | Chandra Mohan.P | 28-01-2008 | 30 days | 26-06-2008 | 11/May/2009 | 95591 | 88359 | 61851.3 |
| 192 | constrution and room W/M repairs at machili bazar hnk | Chandra Mohan.P | 25-01-2008 | 30 days | 26-06-2008 | 21/May/2009 | 97513 | 88066 | 61646.2 |
| 193 | L/o CC Road from H.No.4-1-263 to 4-1-257 at Kothur Hanamkonda in Div 45 | Srinivas Tallapelli | 05-01-2008 | 45 days | 27-06-2008 | 31/Oct/2008 | 261770 | 233140 | 163198 |
| 194 | DESILITING OF THE EX BOX DRAIN FROM H NO 16-5-280/512 RENTDRAIN WGL | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 24-04-2008 | 30 days | 27-06-2008 | 10/Dec/2008 | 103401 | 96749 | 67724.3 |
| 195 | DESILITING OF SILT FROM SULLAGE DRAIN FROM H NO 11-23-2019 OPP SURYA BAR AND OTHER PLACES IN LB NAGAR WGL W NO 2 | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 21-04-2008 | 30 days | 27-06-2008 | 10/Dec/2008 | 65863 | 54625 | 38237.5 |
| 196 | Laying of C.C Road at Kareemabad, Wgl in Div.No.14 | Chandra Mohan.P | 26-02-2008 | 30 days | 27-06-2008 | 11/Dec/2008 | 144801 | 127736 | 89415.2 |
| 197 | DESILITING OF SULLAGA DRAIN FROM H NO 12-8-93 TO 12 VENT AT HUNTER ROAD WGL | HLCCS-Rangampet | 04-06-2008 | 30 days | 28-06-2008 | 20/Jul/2008 | 29916 | 27272 | 19090.4 |
| 198 | L/o CC road from H.No. 2-8-559 to 2-8-561 at Indira Nagar HNK Div.No. 38 | Sampath Rao.K | 15-02-2008 | 30 days | 28-06-2008 | 21/Aug/2008 | 76812 | 69589 | 48712.3 |
| 199 | LAYING OF CC ROAD FROM 17-10-344/A TO 17-10-364 AND 17-10-318/2 AT X ROAD URUS KAREEMA BAD DIV 12 | Ajay Dalitha LCCS Warangal | 24-02-2008 | 60 days | 28-06-2008 | 25/Sep/2008 | 453978 | 404786 | 283350.2 |
| 200 | sectionof cc drainfrom 2-6-1120 epno hb24 of hb colony divisionno 38 | Sampath Rao.K | 12-02-2008 | 30 days | 28-06-2008 | 25/Dec/2008 | 90816 | 81000 | 56700 |
| 201 | C/o RCC Slab culvert and CC Drain H.No. 7-8-95 to 7-7-236 to 7-3-101 and 7-7-280 to 7-3-101 and 7-7-280 to 7-7-276/1 and 7-7-282 to 7-7-278 at Machili Bazar, HNK w.no. 27 | HLCCS-Rangampet | 22-10-2007 | 60 days | 28-06-2008 | 29/Dec/2008 | 205861 | 178155 | 124708.5 |
| 202 | Laying of CC Road from H.No.1-9-1043 to 1-9-1057 in postal colony Hanamkond in Div.No.30 | M/s M/s WLCCS Ltd., Prakash Reddypet (V. Srinivas) | 01-04-2008 | 60 days | 28-06-2008 | 09/Feb/2009 | 158991 | 142206 | 99544.2 |
| 203 | Laying of CC Road from Static Tank to Hanuman Tample and C/o Cc Drain from Hno 20-7-180 to Pipes and 20-7-165 to pipes at west fort wgl in Div.No.8 | HLCCS-Rangampet | 04-06-2008 | 60 days | 28-06-2008 | 20/Nov/2009 | 370129 | 331750 | 232225 |
| 204 | Desilting of Drain from H.no.2-6-914 to Thirumala Bar & Retaurant HNK Div.No.38 | Srinvias P | 12-04-2008 | 15 days | 01-07-2008 | 03/Oct/2008 | 29201 | 26621 | 18634.7 |
| 205 | Construction of CC Drain 300 and 380 mm size from 11-27-126 to 11-27-159 at Kothawada, Wgl in W.No.51 | Ajay Dalitha LCCS Warangal | 08-03-2008 | 45 days | 01-07-2008 | 15/Nov/2008 | 190000 | 167629 | 117340.3 |
| 206 | Laying of WBM Road from 2-7-1146 at Ram Nagar HNK | K. Raghupathi Reddy | 05-11-2007 | 45 days | 01-07-2008 | | 242575 | 197116 | 137981.2 |
| 207 | Laying of WBM Road from EP No. WPR 21/11/4 to H.No.2-7-1331 at Vijayapal Colony, HNK in Div.No.39 | K. Raghupathi Reddy | 21-11-2008 | 60 days | 01-07-2008 | 27/Jan/2009 | 318007 | 246867 | 172806.9 |
| 208 | Laying of WBM Road from H.No.2-7-1411 to 2-7-1393/1, 2-7-1419 at Vijayapal Colony, HNK in Div.No.39 | K. Raghupathi Reddy | 30-01-2008 | 45 days | 01-07-2008 | 27/Jan/2009 | 228299 | 173672 | 121570.4 |
| 209 | Laying of WBM Road from H.No.2-8-555 to 2-8-552/1 at Indiranagar, HNK and 2-8-370 to 2-8-369/1 at Ragavendra Nagar, HNK Div No.38 | K. Raghupathi Reddy | 20-11-2007 | 45 days | 01-07-2008 | 28/Mar/2009 | 172423 | 142887 | 100020.9 |
| 210 | Laying of WBM Road from H.No.2-7-406 to EP No. RES 8/6 at Excise Colony HNK, Div No.39 | K. Raghupathi Reddy | 12-02-2008 | 30 days | 01-07-2008 | 28/Mar/2009 | 124062 | 90776 | 63543.2 |
| 211 | DESI HING OF EXISTING DRAINS IN 31,33 34,35 & 36 IN AE CIRCLE KAZIPET HNK | Kumaraswamy. B | 10-04-2008 | 30 days | 01-07-2008 | 26/May/2009 | 76764 | 64730 | 45311 |
| 212 | L/o of WBM Road from H.No.2-9-995/1/6 to 2-9-166/7 at Vikas Nagar, HNk in Div.No.37 | K. Raghupathi Reddy | 15-02-2008 | 45 days | 01-07-2008 | 14/Jul/2009 | 206668 | 164534 | 115173.8 |
| 213 | Formation of Gravel Road from H.No.11-4-204 to 11-4-217 from 11-4-186 to 100 Road at Christian colony in Warangal in Ward.No.6 | DAYAKAR.G | 09-12-2007 | 30 days | 01-07-2008 | | 89580 | 75678 | 52974.6 |
| 214 | FILLING OF GRAVEL HNO 10-1-56 AND 10-1-157 & 10-1-15 AT SC AREA VIJITABLE MARKET W.NO.21 | Ravi kumar.P | 28-10-2006 | 30 days | 03-07-2008 | 28/Dec/2007 | 9938 | 8310 | 5817 |
| 215 | C/O SEC1 CC DRAIN FROM 24-6-114 TO 24-6-111 AT FATHIMANAGAR HNK | Laxmi Narayana.D | 25-02-2008 | 30 days | 04-07-2008 | 06/Aug/2008 | 29646 | 26509 | 18556.3 |
| 216 | C/O COMPOUND WALL RAITHU BAZAR AT EXCISE COLONY HNK DIV NO 29 | Laxmi Narayana.D | 10-12-2007 | 30 days | 04-07-2008 | 06/Aug/2008 | 84884 | 74866 | 52406.2 |
| 217 | LAYING OF CC ROAD FROM H NO 3-10-1/3 TO 3-10-122 AT REDDY COLONY HNK DIV 48 | Laxmi Narayana.D | 04-12-2006 | 30 days | 04-07-2008 | 08/Aug/2008 | 53900 | 48338 | 33836.6 |
| 218 | Laying of C.C Road from 11-18-1021 to 11-18-1030/1 at Kashibugga, Warangal Ward No.4 | Laxmi Narayana.D | 15-03-2008 | 30 days | 04-07-2008 | 20/Nov/2008 | 134580 | 117410 | 82187 |
| 219 | Laying of C.C Road from 11-18-153 to Chandra Mouli House at Society Colony, Wgl in Div No.4 | Laxmi Narayana.D | 15-03-2008 | 45 days | 04-07-2008 | 20/Nov/2008 | 171671 | 149771 | 104839.7 |
| 220 | C/O SECTION 2 DRAIN FROM EP NO MRM 3 TO OOP MRM 6-10-2 AT RAJARAJESWARI TEMPLE MUNICIPAL QUATERS WARANGAL WARD 26 | Laxmi Narayana.D | 19-03-2008 | 30 days | 04-07-2008 | 20/Nov/2008 | 82000 | 72866 | 51006.2 |
| 221 | C/O CC DRAIN FROM 11-23-659 TO 11-23-648/A AT LAB NAGAR WGL WARD NO 3 | Laxmi Narayana.D | 19-12-2007 | 30 days | 04-07-2008 | 20/Nov/2008 | 48288 | 43100 | 30170 |
| 222 | laying of cc road from 11-4-263 to 11-4-144 at christain colony in ward no 6 warangal | Laxmi Narayana.D | 05-10-2007 | 30 days | 04-07-2008 | 20/Nov/2008 | 132863 | 116713 | 81699.1 |
| 223 | Laying of C.C Road and WBM Road from H.No.20-9-49/1 to Pochamma Temple at Middle Fort in Ward NO.8 | Laxmi Narayana.D | 03-11-2005 | 30 days | 04-07-2008 | 30/Nov/2008 | 146377 | 130939 | 91657.3 |
| 224 | Construction of CC Drain from 2-4-215 to 2-4-255 and 2-4-273 to 2-4-243 at Ramnagar, HNK in W.No.41 | A. Ramesh | 24-04-2008 | 60 days | 06-07-2008 | 08/Jun/2009 | 424532 | 360869 | 252608.3 |
| 225 | L/o 63 mm dia HDPE pipeline from 2-1-1079 to 2-1-1042 and 2-1-732 for static tanks at Lashkar singarama in Div.42 | Chandra Mohan.P | 10-04-2008 | 30 days | 08-07-2008 | 03/Oct/2008 | 96672 | 90348 | 63243.6 |
| 226 | L/o 140 mm dia HDPE pipeline from 3-7-59 to 3-7-91 at Bangladesh qts. HNK | Chandra Mohan.P | 10-04-2008 | 30 days | 08-07-2008 | 07/Oct/2008 | 117941 | 110225 | 77157.5 |
| 227 | C/o 2 dia HDPE Pipe line from H.No. 23-6-264 to Netaji Statue at Shayampet HNK Div.No.28 | Chandra Mohan.P | 12-07-2008 | 30 days | 08-07-2008 | 12/Jan/2009 | 99006 | 90248 | 63173.6 |
| 228 | Providing of Civil and Water Supply works for water quality testing lab at Waddepally filters | Ramesh.B | 12-04-2008 | 30 days | 08-07-2008 | | 47433 | 43171 | 30219.7 |
| 229 | Desilting from Katchanala from Church to Pothana Nagar Road, Wgl | Ravi kumar.P | 15-04-2008 | 30 days | 09-07-2008 | 15/Oct/2008 | 98864 | 90124 | 63086.8 |
| 230 | DC - SILTHIS FOR KOTHAWADA FOR | Ravi kumar.P | 15-04-2008 | 30 days | 09-07-2008 | 15/Oct/2008 | 99165 | 90402 | 63281.4 |
| 231 | Desilting from Ex Box drain from 11-22-498 to Ex Box drain at Kashibugga, Wgl | Ravi kumar.P | 03-11-2008 | 15 days | 09-07-2008 | 22/Jun/2009 | 14000 | 13110 | 9177 |
| 232 | L/o CC Drain Sec-II & Sec.I from 11-22-430/1 to 11-22-409/1 and 11-22-430/1 to 11-22-409 to 11-16-1 to 11-16-4 at Kashibugga Wgl Div.5 | Shiva Constn. | 23-06-2006 | 60 days | 10-07-2008 | 05/Jul/2007 | 178819 | 134237 | 93965.9 |
| 233 | Desilting from EX box drain from Dhanalaxmi Iron Marchant at Gokul Hotel, Kashibugga. | S.SHIVASHANKAR | 03-06-2008 | 15 days | 10-07-2008 | | 20000 | 18230 | 12761 |
| 234 | Desilting of existing mala from Presidency Bridge to Managalivegu bridge under AE circle III HNK | S.SHIVASHANKAR | 05-06-2008 | 30 days | 10-07-2008 | 17/Nov/2008 | 79187 | 57151 | 40005.7 |
| 235 | desiliting of silt from cullage drain from H.No 11-23-1063, to Masid and other places in L.B Nagar Ward No 2 | Suresh Kumar.S | 21-04-2008 | 30 days | 10-07-2008 | 24/Dec/2008 | 72859 | 58296 | 40807.2 |
| 236 | desiliting at the Ex Box Drain from H.No 16-10-672 to Khammam road wgl | Suresh Kumar.S | 02-04-2008 | 30 days | 10-07-2008 | 24/Dec/2008 | 69786 | 52435 | 36704.5 |
| 237 | CC ROAD FROM 25-2-101 TO 25-2-111, 25-3-21/1 TO LANE AND EP.NO. HPK 32/11 to HPK 32/12 in ward no. 34 | Kumaraswamy. B | 22-11-2007 | 45 days | 10-07-2008 | 12/Jan/2009 | 177892 | 148634 | 104043.8 |
| 238 | Laying of WBM road from H.No. 2-8-665 to 2-8-670/4 at Excise Colony Hnk in Div.No.38 | Srinivas Tallapelli | 15-02-2008 | 30 days | 10-07-2008 | | 125372 | 104585 | 73209.5 |
| 239 | Formation of Gravel at beside of Petrol Bunk at Kashibugga Main Road, Warangal | DAYAKAR.G | 20-05-2008 | 30 days | 11-07-2008 | | 27996 | 23314 | 16319.8 |
| 240 | L/o cc road at srinagar colony at div.no.37 | Sanjeev. G | 25-02-2008 | 45 days | 14-07-2008 | 25/May/2009 | 359298 | 301044 | 210730.8 |
| 241 | Laying of C.C. Road from E.P.No.Man/4/01 to H.No.1-8-430 & H.No.1-8-431 to E.P.No.BSW 32 at Balasamudram Hnk. | Naresh Kumar.D | 06-12-2007 | 90 days | 15-07-2008 | 13/Nov/2008 | 658420 | 580657 | 406459.9 |
| 242 | Laying of CC Road from H.No.4-1-147 to 4-1-148 & 4-2-111 to 4-2-110/A at Kothuru, HNK W.No.45 | Naresh Kumar.D | 05-01-2008 | 60 days | 16-07-2008 | 03/Nov/2008 | 255944 | 227514 | 159259.8 |
| 243 | Construction of compound wall at Shanpoor gravel yeard at Ursu, Harijanawada, Wgl in W.No.11 | Sadanandam. B | 26-01-2008 | 45 days | 16-07-2008 | 26/Feb/2009 | 203751 | 182523 | 127766.1 |
| 244 | C.C drain from 2-1-653 to 2-1-695 at Gopalpuram Road, Hnk Ward No.42 | Laxmi Narayana.D | 03-03-2008 | 30 days | 21-07-2008 | 29/Nov/2008 | 0 | 103840 | 72688 |
| 245 | C/o Section ICC Drain from EP No. BNS7 to 1-9-987 at Julywada W.No.30 | Laxmi Narayana.D | 05-03-2008 | 45 days | 21-07-2008 | 12/Jan/2009 | 157017 | 124292 | 87004.4 |
| 246 | Construction of Section I CC Drain from E.P.No.40 VNN 6 to 2-9-35/5 at Vikasnagar, HNk in D.No.37 | Laxmi Narayana.D | 15-02-2008 | 30 days | 21-07-2008 | 10/Jun/2009 | 153898 | 116821 | 81774.7 |
| 247 | L/o WBM road and Const. of CC Drain from H.No. 16-3-498/3 to Ex-Culvert at Ekashila Nagar, Warangal inWard No. 15 | Ajay Dalitha LCCS Warangal | 08-08-2008 | 75 days | 25-07-2008 | 09/Apr/2009 | 649421 | 565611 | 395927.7 |
| 248 | Arresting of Leakages in Ward No.7 to 11 in Wgl | G.Sreedhar | 03-07-2008 | 15 days | 03-08-2008 | 27/Apr/2009 | 99540 | 93033 | 65123.1 |
| 249 | Laying of C.C. Road from H.No.1-7-752 to 1-7-799 at Shanthi nagar Hanamkonda in Ward No.29 | Laxmi Narayana.D | 12-02-2008 | 45 days | 05-08-2008 | 20/Nov/2008 | 277764 | 241158 | 168810.6 |
| 250 | Widening of CC Road from 5-4-87 to 5-4-104 at Ambala Road Hnk, in D.V 47 | M/s Mitra Constructions | 05-10-2007 | 60 days | 13-08-2008 | 07/Feb/2008 | 541810 | 470562 | 329393.4 |
| 251 | LAYING OF CC ROAD FROM5-9-163 TO EP NO KNR 4 AT SIKHWADA HNK DIV NO 46 | M/s Mitra Constructions | 26-10-2007 | 30 days | 13-08-2008 | 27/Sep/2008 | 114157 | 102256 | 71579.2 |
| 252 | Laying of CC Road from 5-9-105 to ICICI Bank Main Road at Kishanpura, HNK in W.No.46 | M/s Mitra Constructions | 04-09-2007 | 45 days | 13-08-2008 | 27/Sep/2008 | 268674 | 240003 | 168002.1 |
| 253 | Construction of CC Drain from H.No.11-20-590 to Burrial ground at Padmanagar, Wgl in Div.No.1 | HLCCS-Rangampet | 25-06-2009 | 30 days | 15-08-2008 | 08/Jun/2009 | 117311 | 102957 | 72069.9 |
| 254 | L/O BT ROAD FROM HNO.2-7-506 TO OPP HNO 2-7-1246 AT EXCISE COLONY HNK DIV .NO.39 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 02-02-2008 | 45 days | 20-08-2008 | 24/Jan/2009 | 498266 | 443067 | 310146.9 |
| 255 | Construction of CC Drain Pipe Line at Beside Raipura Park, HNK Ward No.50 | Manohar.M | 12-02-2008 | 30 days | 23-08-2008 | | 39036 | 34239 | 23967.3 |
| 256 | Laying of C.C Road from 2-4-11 to 2-4-13 and Construction of C.C Drain from 2-4-14 from 45 at Ramnagar | Manohar.M | 25-11-2007 | 45 days | 23-08-2008 | 31/Oct/2008 | 176845 | 157771 | 110439.7 |
| 257 | Construction of Cc Drain Section-I JPN 15/3 to JPN 15 and DSM 16/2 at Vishwakarma Street, Yellamma Bazar, Warangal | Ravi kumar.P | 28-11-2007 | 30 days | 27-08-2008 | 08/Nov/2009 | 150722 | 118383 | 82868.1 |
| 258 | C/O CC DRAIN FROM EPNO. CMS 5 TO CMS 5/1 & UPTO 2-5-410 BEHIND CHOTI MASID | Ravi kumar.P | 15-04-2008 | 30 days | 28-08-2008 | 27/Sep/2008 | 91093 | 81678 | 57174.6 |
| 259 | C/o compoundwall at Rangasaipet Grave yard opp. Raman public School Rangasaipet W.No. 10 | Shiva Constn. | 07-06-2006 | 60 days | 02-09-2008 | 03/Dec/2008 | 396999 | 318861 | 223202.7 |
| 260 | C/o of Compound Wall at Medarakunta Burrial Ground at Jakkalodi Road Rangasaipet W.No.11 | Mallaiah. A | 04-02-2008 | 75 days | 02-09-2008 | 26/Dec/2008 | 662835 | 591525 | 414067.5 |
| 261 | Construction of Section I C.C Drain from H.No.2-6-1049 to 1058 at K.L.N Reddy Colony HNK Ward No.38 | Suresh Kumar.S | 18-12-2007 | 30 days | 05-09-2008 | 18/Nov/2008 | 87175 | 76435 | 53504.5 |
| 262 | Construction of Section I CC drain from EP No. SP87/A/4 to 23-1-23/3 at Shayampet HNK in W.No.28 | Laxmi Narayana.D | 01-03-2008 | 30 days | 05-09-2008 | 20/Nov/2008 | 87755 | 76613 | 53629.1 |
| 263 | L/o WBM Road from H.No. 2-1-541 to 2-11-511 at Vidyaranyapuri, HNK in Div.No.43 | Laxmi Narayana.D | 29-12-2007 | 30 days | 05-09-2008 | 05/Dec/2008 | 44928 | 36672 | 25670.4 |
| 264 | Laying C.C.Road from Ex-C.C. Road to E.P.No.MGR - 1 at SrinivasNagar Colony, Warangal in Div.No.51 | Sri Venkateshwara Constructions | 31-03-2008 | 30 days | 06-09-2008 | 31/Oct/2008 | 81394 | 72068 | 50447.6 |
| 265 | Laying of CC Road patches contruction of RCC Slab Culvert and Construction of section I CC Drain at Ram Nagar, Ward No.22 | Venkateshwarlu P. | 29-11-2007 | 45 days | 09-09-2008 | | 166000 | 127542 | 89279.4 |
| 266 | CONSTRUCTION OF 380MM SIZE DRAIN FROM H.NO.11-25-692, TO 685 AT KOTHAWADA, WARANGAL | MSR CONSTRUCTIONS | 08-03-2008 | 30 days | 10-09-2008 | 05/Nov/2008 | 103938 | 81934 | 57353.8 |
| 267 | L/o CC Road from 22-8-162 to 165 at 148 to 151 at Doctors Colony | MSR CONSTRUCTIONS | 2-10-2007 | 30 days | 10-09-2008 | 07/Nov/2008 | 151643 | 122513 | 85759.1 |
| 268 | L/o WBM road from 11-29-60 to 11-24-135 at Prudvi Nagar Wgl | MSR CONSTRUCTIONS | 07-03-2008 | 30 days | 10-09-2008 | 07/Nov/2008 | 161479 | 123023 | 86116.1 |
| 269 | L/o CC Road from H.No. EP No. 23/8 to WPW 23/06 at Waddepally HNk | MSR CONSTRUCTIONS | 26-10-2007 | 60 days | 10-09-2008 | 07/Nov/2008 | 493087 | 429686 | 300780.2 |
| 270 | Desilting of Suvarage Drain from 11-24-116 to 80 feet Road Junctionto H.No.11-28-21/1 at Kothawada WGL | Suresh Kumar.S | 04-06-2008 | 30 days | 10-09-2008 | 15/Nov/2008 | 84963 | 79497 | 55647.9 |
| 271 | Desilting from existing box drain from 11-23-1083/1 to 11-23-214 at LB Nagar Wgl | Suresh Kumar.S | 27-06-2008 | 30 days | 10-09-2008 | 17/Nov/2008 | 19939 | 18175 | 12722.5 |
| 272 | Laying of C.C Road and Construction of C.C Drain at Laxminagar, Kareemabad Warangal in Ward No.14 | M/s ADLCMA CO-Op society. | 26-02-2008 | 75 days | 11-09-2008 | 16/Mar/2009 | 500000 | 439500 | 307650 |
| 273 | Construction of Compound Wall at H.No.11-22-768 at BN Rao Colony, Wgl | Sathyanarayana.B | 21-07-2008 | 30 days | 16-09-2008 | 16/Jun/2008 | 92567 | 80618 | 56432.6 |
| 274 | Laying of C.C. Road of from H.No.17-5-160 to Exist C.C. Road at | Venkateshwarlu P. | 18-02-2007 | 45 days | 16-09-2008 | 21/Oct/2008 | 179957 | 147293 | 103105.1 |
| 275 | Laying of C.C Road from 7-7-219 to 7-7-221 to 7-7-221 to 7-8-95 to 7-8-96 from H.No. 6-3-165 to EX C.C Road Near Machili Bazar, HNK. Ward No.27 | Suresh Kumar.S | 28-08-2006 | 30 days | 16-09-2008 | 19/Dec/2008 | 140486 | 122059 | 85441.3 |
| 276 | Laying of CC Road from 16-3-398 to Masjid at Perukawada, Wgl W.No.15 | M/s. ASHOKA DALITHA CIVIL AND SANITATION LCWM C & S LTD., | 08-02-2008 | 60 days | 16-09-2008 | 04/Feb/2009 | 446443 | 395325 | 276727.5 |
| 277 | laying of cc road and contrction of section 2 drain rccslab colvert from 10-13-122 to main and 10-13-52 to 10-13-55 at laxmipuram warangal ward 22 | S.SHIVASHANKAR | 19-08-2009 | 30 days | 16-09-2008 | 19/Mar/2009 | 150119 | 132902 | 93031.4 |
| 278 | Laying of CC Road from St. Francis School to H.No; 25-8-7 at Bhavaninagar, Kazipet, Ward No. 33 | Gidde Narsaiah | 18-08-2008 | 60 days | 16-09-2008 | | 472505 | 387856 | 271499.2 |
| 279 | Laying of CC Road from 11-1-47 to 11-1-153 at SRT Colony, Wgl W.No.56 | Sathyanarayana.B | 15-04-2008 | 30 days | 18-09-2008 | 19/Nov/2008 | 94039 | 84039 | 58827.3 |
| 280 | Laying of CC Road from 1121-101 to 11-21-196 at Kashibugga, Wgl W.No.3 | Sathyanarayana.B | 16-07-2008 | 45 days | 18-09-2008 | 19/Nov/2008 | 183750 | 160698 | 112488.6 |
| 281 | L/o WBM road at teacher Colony Hnk | M/s. P.W.L.C.Coop.Society, Laxmipuram | 28-01-2009 | 60 days | 18-09-2008 | 15/Jun/2009 | 245957 | 206403 | 144482.1 |
| 282 | Construction of Section I & II CC Drains in Shivanagar, W.No.17 | Shiva Constn. | 04-06-2006 | 60 days | 22-09-2008 | 23/Dec/2008 | 656312 | 481270 | 336889 |
| 283 | Construction of C.C Road from 5-11-1225 to 5-11-1272, 5-11-1207 and HNK 1215 at Pochamma kunta, HNK in Div.No.44 | M/s Mitra Constructions | 05-11-2007 | 45 days | 23-09-2008 | 07/Feb/2009 | 272268 | 241906 | 169334.2 |
| 284 | Laying of WBM Road from existing BT road to school of Kothagadda East Fort Wgl W.No. 09 | Laxmi Narayana.D | 26-02-2008 | 30 days | 25-09-2008 | 12/Jan/2009 | 83498 | 67455 | 47218.5 |
| 285 | C/O RR MASONARY AND COSTING OF EXCAVATED EARTH FROM EM DRESSES TO SBI WARANGAL OLD BEET BAZAR | Ravi kumar.P | 18-06-2006 | 30 days | 26-09-2008 | 19/Dec/2008 | 99500 | 89483 | 62638.1 |
| 286 | Construction of C.C Drain from H.No.16-10-1212 to 1200 at Shivanagar, Warangal Ward No.17 | Shiva Constn. | 03-06-2008 | 60 days | 30-09-2008 | 04/Nov/2008 | 336938 | 247966 | 173576.2 |
| 287 | C/o CC Drain from H.No. 2-4-355 to existing box drain and internal drains in ram nagar police colony HNK Div. 41 | Shiva Constn. | 04-04-2006 | 60 days | 30-09-2008 | 03/Dec/2008 | 514000 | 384509 | 269156.3 |
| 288 | C/O SECTION1 CC DRAIN FROM SECTIONN2 DRAINS FROM 16-4-1435 TO 1437, 16-4-1461 TO 1466 AND 16-4-823 TO 805 AT SHIVANAGAR WGL DIV 16 | Shiva Constn. | 17-06-2008 | 30 days | 30-09-2008 | 17/Dec/2008 | 205705 | 152794 | 106955.8 |
| 289 | C/O SECTION 2 CC DRIAN FROM 16-4-965 TO 16-4-980 AT SHIVANA GAR WGL DIV 16 | Shiva Constn. | 17-06-2008 | 30 days | 30-09-2008 | 17/Dec/2008 | 134213 | 98667 | 69066.9 |
| 290 | C/O SECTION1 CC DRAIN FROM 17-5-115 TO 17-5-123,AND 17-5-145 TO EPNO KWT 7/5 AT URUS AT KAREEMA BAD DIV 12 | Shiva Constn. | 04-06-2006 | 45 days | 30-09-2008 | 17/Dec/2008 | 220000 | 163637 | 114545.9 |
| 291 | C/O SECTION 2 CC DRIAN FROM 16-4-269/1 TO FORT ROAD RUDRAMABA NAGAR WGL DIV NO 16 | Shiva Constn. | 04-06-2006 | 60 days | 30-09-2008 | 17/Dec/2008 | 363304 | 266394 | 186475.8 |
| 292 | Formation of gravel Road at Mysaiah Nagar Wgl in W.No.17 | G.Sreedhar | 21-08-2008 | 15 days | 03-10-2008 | 29/Nov/2008 | 74946 | 62313 | 43619.1 |
| 293 | L/O WBM ROAD FROM HNO.2-8-329 TO 2-8-329/7 AT VIJAYAPAL COLONY HNK | M/s. P.W.L.C.Coop.Society, Laxmipuram | 05-06-2008 | 45 days | 03-10-2008 | 24/Jan/2009 | 223852 | 190921 | 133644.7 |
| 294 | L/o CC road from H.NO.2-9-583/3 to 2-09-574/1 at Sri Laxmi Nagar Colony Hnk Div.37 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 01-03-2008 | 45 days | 03-10-2008 | 15/Jun/2009 | 332563 | 290414 | 203289.8 |
| 295 | Providing of SPS to CRC Building at Nakkalagutta | Chandra Mohan.P | 03-04-2008 | 15 days | 13-10-2008 | 10/Nov/2008 | 31982 | 29156 | 20409.2 |
| 296 | Construction of Section I CC Drain from 19-9-220/1 to 19-9-224/1 and 19-9-220 to 19-9-217 at Nandikunta, Rangasaipet, in Ward No.11 | M/s ADLCMA CO-Op society. | 01-08-2008 | 30 days | 14-10-2008 | 20/Apr/2009 | 136312 | 120871 | 84609.7 |
| 297 | Gravel filling of pound of Burrial Ground Vaijpai Colony, HNK | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 12-06-2008 | 30 days | 15-10-2008 | 22/Apr/2009 | 75029 | 57428 | 40199.6 |
| 298 | Laying of WBM Road from H.No.3-9-50 to End and H.No.3-9-47/1 to End of Reddy Colony, Hanamkonda in Div No.48 | Laxmi Narayana.D | 26-10-2007 | 30 days | 16-10-2008 | 20/Nov/2008 | 59978 | 49772 | 34840.4 |
| 299 | Consturction of 300 mm size drain from 15-4-85/1 to 15-4-98 at Pothana Nagar, Wgl in W.No.26 | Laxmi Narayana.D | 08-03-208 | 30 days | 16-10-2008 | 20/Nov/2008 | 87000 | 76341 | 53438.7 |
| 300 | Laying of C.C. Road from H.No.15-2-248 to 15-2-249 at Ramgampet, Warangal. | Laxmi Narayana.D | 18-03-2008 | 30 days | 16-10-2008 | 20/Nov/2008 | 65560 | 57778 | 40444.6 |
| 301 | DESILTING OF SILT FROM DRAIN FROM H.NO.8-2-127 AT OLD BEET BAZAR FOR C/O RR MASONARY | Ravi kumar.P | 18-06-2006 | 30 days | 16-10-2008 | 19/Dec/2008 | 94700 | 84917 | 59441.9 |
| 302 | RESTOATION OF EXISTING DAMAGED DRAIN BY C/O CC DRAIN AT LAXMI NAGAR W.NO.14 | GORRE AMARNATH | 12-08-2008 | 30 days | 16-10-2008 | 17/Feb/2009 | 92000 | 82309 | 57616.3 |
| 303 | Construction of Drain and CC Road from 11-27-1 to 11-27-75 at Kothawada in Ward No.53 | Laxmi Narayana.D | 09-10-2007 | 30 days | 16-10-2008 | 26/Feb/2009 | 146819 | 115889 | 81122.3 |
| 304 | formation of gravel road of ambedkar nagar fort road warangal | Sri Venkateshwara Constructions | 21-08-2008 | 15 days | 17-10-2008 | 01/Nov/2008 | 64569 | 53710 | 37597 |
| 305 | formation gravel road of bhagath nagar SRR thota, Warangal Div.no.18 | Sri Venkateshwara Constructions | 21-08-2008 | 15 days | 17-10-2008 | 01/Nov/2008 | 44650 | 37124 | 25986.8 |
| 306 | Restoration of Existing Damaged Drain by Construction of CC Drain Wgl in Ward No.12 | Mandala Suresh | 20-08-2008 | 30 days | 30-10-2008 | 19/Mar/2009 | 100353 | 89984 | 62988.8 |
| 307 | Laying of CC Road from 5-11-793 to 5-11-789/3 at Sagara Colony, HNK W.No.44 | G. Sathyanarayana | 15-09-2008 | 45 days | 01-11-2008 | 23/Jun/2009 | 204530 | 185297 | 129707.9 |
| 308 | Attendingof petty water supply works in AE circle No.II | Chandra Mohan.P | 20-11-2007 | 30 days | 05-11-2008 | 17/Nov/2008 | 70206 | 81968 | 57377.6 |
| 309 | L/o 110 mm dia HDPE pipeline from 1-2-230 to 1-2-290 at Rahmath nagar, Kazipet | Chandra Mohan.P | 20-11-2007 | 30 days | 05-11-2008 | 17/Nov/2008 | 44946 | 41912 | 29338.4 |
| 310 | L/o 140 mm & UDPE pipeline from 25-08-6161 to 25-8-628 at Shanthi nagar Kazipet | Chandra Mohan.P | 01-07-2008 | 30 days | 05-11-2008 | 19/Nov/2008 | 76688 | 69903 | 48932.1 |
| 311 | Supply and delivery of 6 S.O.J under A.E Circle I, Kazipet | Chandra Mohan.P | 12-04-2008 | 30 days | 05-11-2008 | 19/Nov/2008 | 49565 | 45176 | 31623.2 |
| 312 | Laying of C.C Road near Pochamma Temple at Pochamma Kunta, HNK | Naresh Kumar.D | 12-06-2008 | 30 days | 05-11-2008 | 08/Dec/2008 | 98860 | 87680 | 61376 |
| 313 | Laying of c.C. Road and Section - I C.C. Drain H.No.5-11-1003 to 5-11-100 Pochammakunta, Hnk | Naresh Kumar.D | 12-06-2008 | 30 days | 05-11-2008 | 08/Dec/2008 | 37545 | 33323 | 23326.1 |
| 314 | Restoration of 200 mm dia HDPE pipeline at Opp. Solar Tailors Deshaipet Road Wgl. | Chandra Mohan.P | 15-07-2008 | 30 days | 05-11-2008 | 10/Dec/2008 | 41897 | 38222 | 26755.4 |
| 315 | Repairs to central deviders at Naidu Petrol PUmp Junction at Wgl | Chandra Mohan.P | 15-07-2008 | 30 days | 05-11-2008 | 10/Dec/2008 | 70752 | 34992 | 24494.4 |
| 316 | repairs to existing central dividers at naidu petrol pump | Chandra Mohan.P | 30-06-2008 | 30 days | 05-11-2008 | 11/Dec/2008 | 38000 | 34992 | 24494.4 |
| 317 | Arresting of Leeakeges in Various Locations in Div.No.12 to 14 and 19, 25 and 2 at Kareemabad, Wgl | Chandra Mohan.P | 25-07-2008 | 30 days | 05-11-2008 | 11/Dec/2008 | 50000 | 45571 | 31899.7 |
| 318 | Laying of 200 mm HDPE pipe Line and Filling of S.V.S at Behind REC Bus Stop | Chandra Mohan.P | 02-08-2008 | 30 days | 05-11-2008 | 11/Dec/2008 | 86703 | 79025 | 55317.5 |
| 319 | engage of lasour for alge andngrossin bhdrakali wgl | Chandra Mohan.P | 12-11-2007 | 15 days | 05-11-2008 | 07/Jan/2009 | 19925 | 18632 | 13042.4 |
| 320 | Arresting of leakages on 900 mm dia and 600 mm dia pipeline at Desaipet road Autonagar, Warangal. | Chandra Mohan.P | 05-01-2008 | 30 days | 05-11-2008 | 12/Jan/2009 | 37924 | 34645 | 24251.5 |
| 321 | GRAVEL FORMATION AND FILLING FOR POT HOLES INTERNAL ROADS AT RAHAMATH NAGAR KAZIPET | Kumaraswamy. B | 25-07-2008 | 30 days | 05-11-2008 | 12/Jan/2009 | 39893 | 33151 | 23205.7 |
| 322 | filling of fut holds with gravel and awary dust at somidi village on he occationof pochamma festivals | Kumaraswamy. B | 23-08-2008 | 30 days | 05-11-2008 | 12/Jan/2009 | 39000 | 31666 | 22166.2 |
| 323 | Restoration of damaged existing road by formation of gravel road from H.no.12-8-213/4 to road end of Santhoshmatha Wgl in ward no. 19 | M/S SAI KRUPA ENTERPRISES | 20-08-2008 | 30 days | 05-11-2008 | 04/Mar/2009 | 69732 | 57932 | 40552.4 |
| 324 | Gravel formation from H.No.1-1-123 to E.P.Ro TCK 12/6 at Kapornaik thanda Kzp in Ward (36) | Kumaraswamy. B | 02-08-2008 | 30 days | 05-11-2008 | 23/Mar/2009 | 83419 | 69320 | 48524 |
| 325 | Removal of Alge and Race from Bhadra Kali SS Tank at Wgl | Chandra Mohan.P | 19-05-2008 | 30 days | 05-11-2008 | 11/Jun/2009 | 75540 | 70754 | 49527.8 |
| 326 | Providing and placing of syntax tanks at Mini Municipal Corporation, Kazipet | Kumaraswamy. B | 20-08-2008 | 30 days | 05-11-2008 | | 57675 | 52301 | 36610.7 |
| 327 | Laing of WBM Road from H.No.2-10-284 to H.No.2-10-361 at Teachers Colony Phase-II Hanamkonda in Div.No. 37 | VCR ASSOCIATES | 21-04-2008 | 30 days | 05-11-2008 | | 250300 | 179905 | 125933.5 |
| 328 | Construction of Compound wall and room at Rangasaipet Reservoir Rangasaipet Warangal in Ward No.10 | P. Lavakusha Reddy | 24-08-2006 | 60 days | 05-11-2008 | 09/Nov/2009 | 399210 | 344590 | 241213 |
| 329 | C/o Sec-I & II CC drains in Shivanagar W.No.17 | Mallaiah. A | 26-02-2008 | 30 days | 06-11-2008 | 27/Dec/2008 | 656312 | 481270 | 336889 |
| 330 | Construction of CC Drain and Laying of CC Road at Kareemabad Wgl in Ward No.13 | Mallaiah. A | 28-02-2008 | 75 days | 06-11-2008 | 28/Mar/2009 | 615847 | 552356 | 386649.2 |
| 331 | Laying of C.C. Road from 1123 - 2383/1 to 11-23-2388 at Navayuga Colony, Warangal In Ward No.2 | DAYAKAR.G | 19-08-2008 | 30 days | 06-11-2008 | 09/Apr/2009 | 138826 | 124259 | 86981.3 |
| 332 | L/o WBM Road from Annapurna complex to Anganwadi Drain V.Nagar Colony Kareembad Wgl in W.No. 15 | Mallaiah. A | 28-02-2008 | 30 days | 06-11-2008 | 21/May/2009 | 154138 | 130546 | 91382.2 |
| 333 | L/o CC road from EP.No.65 to H.No. 10-13-33 at laxmipuram, Warangal ward. 22 | Komuraiah.S | 26-08-2008 | 30 days | 10-11-2008 | 31/Dec/2008 | 99478 | 87766 | 61436.2 |
| 334 | Construction of CC Road from Opp: 11-3-79 to 11-1-289 and WBM Road and Construction of CC Drain in SRT Colony, Wgl D.No.6 | Komuraiah.S | 12-03-2008 | 60 days | 10-11-2008 | 14/May/2009 | 492220 | 434827 | 304378.9 |
| 335 | PROCURMENT OF TREE GUARDS IN WGL COPPORATION LIMIT | Sadanandam. B | 28-08-2008 | | 11-11-2008 | 24/Jul/2008 | 137500 | 128577 | 90003.9 |
| 336 | Laying of C.C. Road from Rangaiah Taddy shop to Railway gate at Kareembad, wgl | Sri Venkateshwara Constructions | 11-10-2007 | 60 days | 12-11-2008 | 10/Dec/2008 | 279644 | 242017 | 169411.9 |
| 337 | laying of cc road from H no 16-1-670/1 at srr thota wgl ward no 18 | Sri Venkateshwara Constructions | 17-09-2008 | 75 days | 12-11-2008 | 10/Dec/2008 | 564534 | 479231 | 335461.7 |
| 338 | Laying of WBM Road and C.C Road from 16-3-461 to 498 and 16-3-504 to 511 and 16-3-985 to Landry Shop and 16-3-1052 to 1048 and Div.No.15 | Preethi Const. | 20-08-2008 | 90 days | 12-11-2008 | 31/Dec/2008 | 758291 | 631300 | 441910 |
| 339 | Laying of CC Road from 11-19-142 to 11-19-128 at Kashibugga, Wgl W.No.3 | Sri Venkateshwara Constructions | 26-08-2008 | 60 days | 12-11-2008 | 15/Jan/2009 | 338499 | 290145 | 203101.5 |
| 340 | contrution of section1 cc drain from H. NO 14-6-26 to 14-6-191 and 14-6-42 to 14-6-185 opp 14-6-20 to 14-6-137 at nizam pura warangal ward no 23 | Sri Venkateshwara Constructions | 19-08-2008 | 45 days | 12-11-2008 | 07/Mar/2009 | 205248 | 167915 | 117540.5 |
| 341 | C/o of SEC- 1 and II CC Drain from 16-4-1290 to Ex-Transformer at other placer Bhupesh Nagar Warangal in Ward No. 16 | Preethi Const. | 16-07-2008 | 75 days | 12-11-2008 | 27/Apr/2009 | 500720 | 385913 | 270139.1 |
| 342 | Construction of CC Drain and Laying of CC Roads at Kareemabad, W.No.14 | Sri Venkateshwara Constructions | 20-08-2008 | 75 days | 12-11-2008 | 24/Jul/2009 | 536359 | 429291 | 300503.7 |
| 343 | CONSTRUCTIONOF 300 MM SIZE DRAINGES FROM H.NO.11-25-517 TO 11-25-433 AT KOTHAWADA, WGL WARD NO.52 | Sri Venkateshwara Constructions | 28-07-2008 | 45 days | 13-11-2008 | 21/Dec/2008 | 165000 | 131702 | 92191.4 |
| 344 | Construction of CC Drain 300 mm size from EP No. P KM 14/1 to 11-26-167 at Kothawada, Wgl W.No.51 | Sri Venkateshwara Constructions | 28-07-2008 | 45 days | 13-11-2008 | 24/Dec/2008 | 185000 | 148055 | 103638.5 |
| 345 | Laying of C.C Drain from H.No.25-6-358 to 25-6-363 at Vishnupuram | Naresh Kumar.D | 02-11-2007 | 30 days | 14-11-2008 | 29/Nov/2008 | 126277 | 102798 | 71958.6 |
| 346 | Laying of C.C Road from 5-11-743 to Static Tank at HNK | Naresh Kumar.D | 05-11-2007 | 45 days | 14-11-2008 | 31/Dec/2008 | 270804 | 233276 | 163293.2 |
| 347 | Restoration of Existing damaged drain by construction of CC drain of Bakshima halla W.No.13 | Srinivas. B | 12-08-2008 | 30 days | 14-11-2008 | 04/Mar/2009 | 97000 | 85106 | 59574.2 |
| 348 | Restoration of Existing Damaged Road by formation of gravel road at 18-3-51 to 255 at Harijanawada Ward.No.13 | Srinivas. B | 20-08-2008 | 30 days | 14-11-2008 | 04/Mar/2009 | 97781 | 81243 | 56870.1 |
| 349 | Construction of C.C Drain from H.No.2-1-493 to 4-1-495/1 at 100 feet road | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 02-08-2008 | 30 days | 14-11-2008 | 22/Apr/2009 | 52594 | 46985 | 32889.5 |
| 350 | Laying of CC Road and Drain from 2-1-788 to 2-1-789/1and 2-1-794 to 2-1-801 at Laskhar Singara, Hanamkonda | Ramesh.B | 07-03-2008 | 75 days | 14-11-2008 | | 169958 | 147073 | 102951.1 |
| 351 | Laying of C.C Road from H.No.2-12-310/2 to 2-12-315/1 at Vidyaranyapuri, HNk in Div.No.43 | Naresh Kumar.D | 21-01-2008 | 65 days | 14-11-2008 | 03/Dec/2009 | 262615 | 229858 | 160900.6 |
| 352 | Construction of Section -II CC Drain from 3-5-44 to 3-5-66 at Gudi Bandal, Hanamkonda in Division no.47 | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 28-08-2008 | 30 days | 14-11-2008 | 10/Dec/2009 | 47937 | 43069 | 30148.3 |
| 353 | impervious coatto the 300 hp and 75 hp pump houses roof slab at kuc filter bed, HNK. | M/S SAI KRUPA ENTERPRISES | 29-03-2008 | 30 days | 15-11-2008 | 07/Jan/2009 | 67297 | 60875 | 42612.5 |
| 354 | filling of potholder with gravel at bhavani nagar on shanthi nagar on occation of pochamma festival ward no 33 | Kumaraswamy. B | 20-08-2008 | 30 days | 15-11-2008 | 12/Jan/2009 | 40571 | 33713 | 23599.1 |
| 355 | Laying of HDPE Pipe Line from 19-1-146 to Kapuwada at Rangasaipet, Wgl in W.No.11 | Suresh Kumar.S | 18-10-2008 | 60 days | 15-11-2008 | 24/Jan/2009 | 381000 | 325504 | 227852.8 |
| 356 | C/O SEC I & II CC DRAINS AND F/O GRAVEL ROAD FROM 19-6-10 TO KMM MAIN ROAD AT RANGASHIPET W.NO.10 | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 20-08-2008 | 30 days | 15-11-2008 | 24/Mar/2009 | 80495 | 70518 | 49362.6 |
| 357 | Uprooting the Ex-160mm dia HDPE pipe line and laying and jointing at Rudramamba Nagar Warangal in Ward No.16 | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 20-08-2008 | 15 days | 15-11-2008 | | 15000 | 12517 | 8761.9 |
| 358 | RESTOR ACTION OF EXISTING DAMAGED DRAIN BY C/O OF CC DRAINS BAKKIWADA WGL | MAHATMA JYOTHI RAO PULE ( KUMARASWAMY.P) | 20-08-2008 | 30 days | 15-11-2008 | 31/Aug/2009 | 99148 | 88975 | 62282.5 |
| 359 | Development of Burrial Ground in Ward No.6 at Labour Colony, Warangal | SATISH KUMAR . N | 20-08-2008 | 75 days | 17-11-2008 | | 547485 | 484319 | 339023.3 |
| 360 | Formation of Gravel Road and WBM Roads at W.No.13 | P. Lavakusha Reddy | 28-07-2008 | 30 days | 19-11-2008 | | 453515 | 362565 | 253795.5 |
| 361 | C/O CC DRAIN FROM HNO 5-11-1362 TO 5-11-1395 AT SAGAR COLONY WARD NO 44 | Srinivas. B | 30-08-2006 | 45 days | 20-11-2008 | 31/Dec/2008 | 218712 | 179180 | 125426 |
| 362 | Construction of Section II CC Drain from 2-7-1009 to 2-7-1008/2 at Kanakadurga Colony, HNK, D.No.39 | Sampath Rao.K | 28-06-2008 | 30 days | 21-11-2008 | 12/Jun/2009 | 26988 | 23710 | 16597 |
| 363 | Construction of Compound wall and burning plat form arround the burrial ground at For Warangal petrol pump, Warangal in Ward No. 10 ( General Budget) | MSR CONSTRUCTIONS | 24-08-2007 | 75 days | 21-11-2008 | 07/Jul/2009 | 441385 | 369255 | 258478.5 |
| 364 | Laying of CC Road and construction of Section-I CC Drain from H.No. 19-11-46 to 19-11-73 and 19-11-33 to SPK 24/4 at Shambunipet, Warangal in Div.No.10 | MSR CONSTRUCTIONS | 29-08-2007 | 75 days | 21-11-2008 | 20/Nov/2009 | 311355 | 283364 | 198354.8 |
| 365 | Laying of CC Road from Opp: 2-7-1233 to 2-7-1238 at Excise Colony, Hanamkonda in Div. no. 39 | Sanjeev. G | 08-06-2008 | 45 days | 22-11-2008 | | 255589 | 209278 | 146494.6 |
| 366 | Laying of CC & WBM Road from H.No. 2-6-1070/1 to 2-6-1099/2, 2-6-1075, 2-6-1076 at KLN Reddy colony Hanamkonda in Div.No.38 | Sanjeev. G | 05-06-2008 | 31 days | 22-11-2008 | | 661120 | 552136 | 386495.2 |
| 367 | C/o Section II CC Drain at Vambay Scheme Houses Kashikunta Wgl W.No.11-13-15 | MSR CONSTRUCTIONS | 28-07-2007 | 75 days | 25-11-2008 | 12/Jan/2009 | 745047 | 585759 | 410031.3 |
| 368 | Laying of CC Road from 16-10-14 to 16-10-72 at Shivanagar, Wgl W.No.17 | P. Jagadeeshwr Rao | 13-04-2006 | 60 days | 25-11-2008 | 25/Apr/2009 | 583890 | 498904 | 349232.8 |
| 369 | C/O SECTION - I CC DRAIN FROM HNO. 1- 7-753 TO 1-7-654 AT SHANTHI NAGAR HNK DIV.NO.29 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 20-08-2008 | 45 days | 27-11-2008 | 13/Mar/2009 | 158141 | 137107 | 95974.9 |
| 370 | 40 CC ROAD FROM HNO.2-5-340 TO HNO 2-5-242 AT NAKKALA GUTTA BEHIND CULVER ROAD HNK W.NO. | M/s. P.W.L.C.Coop.Society, Laxmipuram | 20-09-2008 | 60 days | 27-11-2008 | 13/Mar/2009 | 258727 | 231164 | 161814.8 |
| 371 | L/O WBM ROAD FROM HNO. 23-6-111 TO 23-6-129/40 AT DARGA COLONY HNK DIV.NO.28 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 12-08-2008 | 60 days | 27-11-2008 | 13/Mar/2009 | 579960 | 463749 | 324624.3 |
| 372 | L/O CC ROAD FROM HNO.1-8-143 TO APNO 29 BSMQ90 AT BALASAMUDRAM HNK W.NO.40 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 15-10-2008 | 60 days | 27-11-2008 | 13/Mar/2009 | 407875 | 364464 | 255124.8 |
| 373 | Laying of WBM Road from H.No.1-7-885/4 to 1-7-885/9 at Nandi Hills, HNK Div No.29 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 20-08-2008 | 60 days | 27-11-2008 | 13/Mar/2009 | 388764 | 310106 | 217074.2 |
| 374 | Laying of CC Road from H.No. 10-10-126 to 14-8-209/1 and Construction of RCC culvert in various places in Ward.No.22 | Komuraiah.S | 27-08-2008 | 60 days | 27-11-2008 | | 404932 | 361478 | 253034.6 |
| 375 | Laying of WBM Road from H.No. 2-8-573/1/3 to EP.No.ING 13/10/6, H.No. 2-8-688 to 2-8-689 at Indira Nagar, Hanamkonda in Div.No. 38 | Sanjeev. G | 15-07-2008 | 60 days | 27-11-2008 | | 248389 | 198936 | 139255.2 |
| 376 | C/o CC DRAIN from 11-29-233 to 11-29-227 at Rammanthapuri Wgl W.No.53 | Shiva Constn. | 04-06-2008 | 30 days | 28-11-2008 | 21/May/2009 | 154992 | 115644 | 80950.8 |
| 377 | Construction of Pipe Culverts and 300mm size CC Drain from 11-28-251/1 to 246 and 11-28-263 to 267 at Thummalakunta, Warangal W.No.53 | M/s Dalitha Labour Contract Co-operatice Society, Wgl | 28-07-2008 | 60 days | 01-12-2008 | 07/Sep/2009 | 341198 | 300015 | 210010.5 |
| 378 | Laying of WBM Road from EP no. LSP 26/1 to 2-2-31 and 2-2-32 to 471 at Rajaji Nagar, Hanamkonda in Ward.No. 42 | M/s Dalitha Labour Contract Co-operatice Society, Wgl | 17-09-2008 | 60 days | 01-12-2008 | | 328772 | 277290 | 194103 |
| 379 | Laying of WBM Road from Opp: 2-8-328 to 2-8-320/2 at Vijaypal Colony, HNK | Sanjeev. G | 20-09-2008 | 30 days | 03-12-2008 | 16/Jun/2009 | 210641 | 169709 | 118796.3 |
| 380 | Construction of CC Drain from EP No. BES 6/12 to 2-8-573/1/3 at Indiranagar, HNK D.No.38 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 03-08-2008 | 60 days | 03-12-2008 | 30/Jun/2009 | 459992 | 400532 | 280372.4 |
| 381 | sleeping of puthold work at duga shivar on occaction of ramzan festival ward no 31 | Kumaraswamy. B | 29-09-2008 | 30 days | 11-12-2008 | 12/Jan/2009 | 20509 | 17062 | 11943.4 |
| 382 | Gravel filling on the occasion of bathukamma festival at bodagutta kazipet W.No. 32 | Kumaraswamy. B | 07-11-2008 | 30 days | 11-12-2008 | 19/Mar/2009 | 43077 | 35836 | 25085.2 |
| 383 | Filling pot house with gravel at Edgah Kazipet on Occassion of Ramzan festival in W.No.35 | Kumaraswamy. B | 30-09-2008 | 30 days | 12-12-2008 | 05/Jan/2009 | 14853 | 12357 | 8649.9 |
| 384 | Construction of 300 mm and 380 mm side CC Drain from 11-24-285 to 494 & 11-24-229 to 374 at Pochamma maindan, Harijanawada, Wgl | HLCCS-Rangampet | 28-07-2008 | 60 days | 17-12-2008 | 24/Feb/2009 | 329609 | 276059 | 193241.3 |
| 385 | Construction of Section I and II CC Drain from 17-10-62 to 17-10-68, 17-10-78 and other places Ursu, Kareemabad, Wgl in Ward No.12 | Mandala Suresh | 20-08-2008 | 60 days | 17-12-2008 | 19/Mar/2009 | 425000 | 326684 | 228678.8 |
| 386 | Construction of Section I CC Drain at Fort Wgl East Fort, Wgl in Ward No.9 | Mandala Suresh | 20-08-2008 | 60 days | 17-12-2008 | 06/Apr/2009 | 303201 | 238195 | 166736.5 |
| 387 | Dismentalling of collapsed old building at beside Municipal Office, Warangal | Naga Raju T | 20-10-2008 | 30 days | 17-12-2008 | 11/Apr/2009 | 85000 | 75388 | 52771.6 |
| 388 | Laying of WBM Road and Construction of Section I CC drain from 16-3-1088/1 to 16-3-1057 at Ambedkar Nagar, W.No.15 | M/s Sri Nagamaiah WLCPSSS LTD | 20-08-2008 | 60 days | 17-12-2008 | 06/May/2009 | 311961 | 271880 | 190316 |
| 389 | L/o cc Road from 16-1-147 to 138 and 16-1-430 existing culvert and 16-1-33 to 16-1-26/1/19 SRR Thota Wgl Div.No.18 | M/s Sri Nagamaiah WLCPSSS LTD | 20-08-2008 | 75 days | 17-12-2008 | 21/May/2009 | 545702 | 488129 | 341690.3 |
| 390 | C/o CC Drain from 2-7-976 to 2-7-669 on Excise colony main Road at Hanamkonda in Div.No.39 | Sampath Rao.K | 16-07-2008 | 75 days | 17-12-2008 | 12/Jun/2009 | 988408 | 705534 | 493873.8 |
| 391 | Laying of CC Road and C/o of CC Culvert at Karimabad. | M/s Sri Nagamaiah WLCPSSS LTD | 20-08-2008 | 60 days | 17-12-2008 | | 532761 | 469988 | 328991.6 |
| 392 | Construction of RCC Slab Culvert at Pochamma temple, Sakarasikunta, Warangal in Ward no.18 | Komuraiah.S | 23-08-2008 | 75 days | 18-12-2008 | 08/Jun/2009 | 657317 | 588392 | 411874.4 |
| 393 | Leveling of Ground at Various Locations in Div No.30 for the accession of Bathukamma Festival | Ravinder Rao A | 09-10-2008 | 30 days | 23-12-2008 | 06/Oct/2009 | 34000 | 28023 | 19616.1 |
| 394 | GRAVELWBM ROAD FROMSDM LHS 26/1 | Chandra Mohan.P | 13-08-2008 | 30 days | 24-12-2008 | 21/Apr/2009 | 94232 | 79839 | 55887.3 |
| 395 | Levelling the ground at various locations in Div.No.37 for the Occassion of Bathukamma Festival | Ravinder Rao A | 05-10-2008 | 30 days | 24-12-2008 | 26/May/2009 | 29104 | 24212 | 16948.4 |
| 396 | Laying of CC Road from 5-11-1362 to 5-11-1395 at Pochammakunta Hanamkonda in Ward.No.44 | Srinvias P | 28-08-2008 | 45 days | 24-12-2008 | 15/Sep/2009 | 253000 | 224039 | 156827.3 |
| 397 | Construction of Boundary pillars from Warangal Municipal Corporation open places in Warangal at Shivangar, Ursu and Kareemabad Ward No. 12,17 and 18 (10% open spaces Budget) | Ravi kumar.P | 05-11-2007 | 60 days | 24-12-2008 | | 50147 | 45749 | 32024.3 |
| 398 | CONTRUCTION OF DETAINING WALL AT LGHLSH 26/1 AT RAJALINGAM HNK | Chandra Mohan.P | 13-08-2008 | 30 days | 29-12-2008 | 21/Apr/2009 | 86383 | 76618 | 53632.6 |
| 399 | L/o CC Road from H.No. 11-22-822/13 to & 21 and 11-22-823 at Madinaveedi Wgl Div.No.3 | Sathyanarayana.B | 20-08-2009 | 75 days | 02-01-2009 | 13/Apr/2009 | 467907 | 400569 | 280398.3 |
| 400 | Laying of CC Road from K & M 50/2/3 to 11-22-821 and 11-21-99 at Kashibugga, Wgl in Div No.3 | Sathyanarayana.B | 30-10-2008 | 60 days | 12-01-2009 | 28/Feb/2009 | 414827 | 355135 | 248594.5 |
| 401 | Laying of CC Road from H.No.1-8-452 to 1-8-450 at Balasamudram Hanamkonda in Ward.No.40 | Chandra Mohan.P | 30-07-2008 | 30 days | 12-01-2009 | | 136613 | 118265 | 82785.5 |
| 402 | Laying of CC Road from H.No. 2-8-582 to EP No. ING 13/8/1 and H.No.2-8-493 to EP No. ENG 15 at Indira Nagar, Hanamkkonda in Div.No.38 | Chandra Mohan.P | 27-10-2008 | 45 days | 12-01-2009 | | 179372 | 158429 | 110900.3 |
| 403 | L/o of CC Road and WBM Road from 7-2-17 to 95 Machilibazar, HNK | Rajendra Prasad | 29-07-2008 | 105 days | 16-01-2009 | | 983690 | 847136 | 592995.2 |
| 404 | L/o of CC Road and WBM Road from 6-4-135 to 127 at Machilibazar, HNK | Rajendra Prasad | 29-07-2008 | 105 days | 16-01-2009 | | 945652 | 815275 | 570692.5 |
| 405 | Laying of Metal Road Chinthal W.No.7 | MSR CONSTRUCTIONS | 17-10-2008 | 60 days | 17-01-2009 | 10/Jun/2009 | 476000 | 373938 | 261756.6 |
| 406 | Construction of Section -I and II CC Drain and Laying of CC Road at Kareemabad, Warangal in Ward.No.14 | V. Yadagiri | 08-11-2009 | 60 days | 17-01-2009 | 29/Sep/2009 | 483992 | 430841 | 301588.7 |
| 407 | Laying of CC Road from H.No.1-9-957 to 1-9-1080/1 at Postal Colony Hanamkonda in Div.No.30 | M/s M/s WLCCS Ltd., Prakash Reddypet (V. Srinivas) | 09-01-2009 | 45 days | 21-01-2009 | 09/Feb/2009 | 243993 | 217678 | 152374.6 |
| 408 | Laying of RCC slab on existing box drain at H.No. 11-23-602 at LB Nagar Warangal in Ward.No.3 | DAYAKAR.G | 28-11-2008 | 30 days | 23-01-2009 | | 97552 | 87859 | 61501.3 |
| 409 | L/o CC road from 11-23-1997 l3 to Jyothi Balamandir School at Lb Nagar Warangal ward (2) | MSR CONSTRUCTIONS | 12-08-2008 | 60 days | 24-01-2009 | 25/Apr/2009 | 493522 | 430320 | 301224 |
| 410 | L/o CC Road from 11-23-1306 to 1364 and 11-23-1516 to 1509 at Lb nagar warangal ward (2) | MSR CONSTRUCTIONS | 12-08-2008 | 25 days | 24-01-2009 | 25/Apr/2009 | 658008 | 573540 | 401478 |
| 411 | Filling of gravel road and leveling the ground at Sahnthi Nagar in W.No.1 Warangal | DAYAKAR.G | 28-11-2008 | 45 days | 25-01-2009 | | 22676 | 18864 | 13204.8 |
| 412 | laying of CC Road from EP No.TBS 36 TO H.No.2-6-96 at Shanthi Nagar, Hanamkonda in division no.38 | Ch. Ramapathi Rao | 20-08-2008 | 45 days | 27-01-2009 | 11/Apr/2009 | 185553 | 160333 | 112233.1 |
| 413 | C/o of Brick Mansonary and C/o of Section I CC Drain at 15-6-2005 Static Tank Papaiahpet Wgl in Ward No.25 | S.SHIVASHANKAR | 12-02-2009 | 30 days | 27-01-2009 | | 172000 | 153745 | 107621.5 |
| 414 | Laying of CC Road from 5-4-107 to 5-4-33 at Bommathiwada, Hanamkonda in Ward No. 47 | MSR CONSTRUCTIONS | 30-09-2008 | 45 days | 27-01-2009 | 09/Oct/2009 | 168373 | 150579 | 105405.3 |
| 415 | Laying of WBM Road from H.No. 2-8-31/2 to 2-8-255 at Waddepally, Hanamkonda in Div.No.38 | Ch. Ramapathi Rao | 20-08-2008 | 45 days | 27-01-2009 | | 152583 | 122475 | 85732.5 |
| 416 | laying of cc road from H. 11-22-531 to 98 at kashibugga warangal in div no 5 | Sathyanarayana.B | 28-08-2008 | 5 days | 28-01-2009 | 25/Feb/2009 | 508487 | 435319 | 304723.3 |
| 417 | Laying of C.C. Road from Opp Kazipet SR to H.No.25-4-391 at Vishnupuri Kazipet in Ward No.35 | Kumaraswamy. B | 09-01-2009 | 30 days | 28-01-2009 | 20/Mar/2009 | 91854 | 81913 | 57339.1 |
| 418 | Gravel filling on the occassion of Bathukamma festival at bund kazipet | Kumaraswamy. B | 07-10-2008 | 30 days | 28-01-2009 | 20/Mar/2009 | 48850 | 40640 | 28448 |
| 419 | Laying WBM road from H.no.24-7-289 to 24-07-269 at Ramakrishna Colony Kazipet | Kumaraswamy. B | 20-08-2008 | 45 days | 28-01-2009 | 20/Mar/2009 | 147000 | 112236 | 78565.2 |
| 420 | Laying of WBM Road from Punnami Guest house to H.No.1-1-76 at Chaitanyapuri Kazipet Div.No.36. | Kumaraswamy. B | 28-07-2008 | 45 days | 28-01-2009 | 31/Mar/2009 | 149734 | 112623 | 78836.1 |
| 421 | L/O C.C ROAD CD C/O CC DRAIN FROM 25-6-225 TO 25-6-223 AND 238 AND 25-6-265 TO END OF LANE AT VIDYA NAGAR KAZIPET DIV.NO.35 | Kumaraswamy. B | 20-08-2008 | 45 days | 28-01-2009 | 23/May/2009 | 274000 | 231551 | 162085.7 |
| 422 | LAY OF CC ROAD FROM 1-6 -2 TO 25-6-266 AND 25-6-295 AT ARYA NAGAR KAZIPET,DIV. NO.35 | Kumaraswamy. B | 28-08-2008 | 60 days | 28-01-2009 | 23/May/2009 | 346000 | 291771 | 204239.7 |
| 423 | ARRESTING OF LEAVINGS IN VARIOUS OCCATION UNDER AE CIRCLE NO.I KAZIPET IN WARD NO.31 TO 36 | Kumaraswamy. B | 22-11-2008 | 30 days | 28-01-2009 | 23/May/2009 | 59287 | 54049 | 37834.3 |
| 424 | Laying of WBM Road from H.No.23-6-124/2 to E.P.No.HRS/8/10/S at Durga Colony, HNK | M/s. P.W.L.C.Coop.Society, Laxmipuram | 02-07-2008 | 60 days | 28-01-2009 | 15/Jun/2009 | 241482 | 204148 | 142903.6 |
| 425 | Laying of WBM Road at Bank Colony Hanamkonda | M/s. P.W.L.C.Coop.Society, Laxmipuram | 03-07-2008 | 60 days | 28-01-2009 | 15/Jun/2009 | 161932 | 137806 | 96464.2 |
| 426 | Laying of CC Road and construction of CC Drain from 25-4-445 to 534 and construction of CC Drain from 25-4-346 to Somidi Road, Kazipet in Div.No.35 | Kumaraswamy. B | 20-08-2008 | 30 days | 28-01-2009 | | 420701 | 372867 | 261006.9 |
| 427 | Laying of WBM Road from 25-8-686 to Pochamma Temple and 25-8-630/2 to 25-8-23/2 at Bhavani Nagar, Kazipet in Div.No.33 | Kumaraswamy. B | 20-08-2008 | 30 days | 28-01-2009 | | 220003 | 182998 | 128098.6 |
| 428 | Laying of WBM Road and Construction of CC Drain from H.No. 1-2-227 to 1-2-290 at Rahmath Nagar, Hanamkonda in Ward.No.36 | Kumaraswamy. B | 25-07-2008 | 45 days | 28-01-2009 | | 151686 | 129249 | 90474.3 |
| 429 | Laying of CC Road from 25-8-346 to 25-9-7 and 25-8-175 to 25-8-156 at Bapuji Nagar (South), Kazipet in Div.No.33 | Kumaraswamy. B | 20-08-2008 | 45 days | 28-01-2009 | | 155698 | 137599 | 96319.3 |
| 430 | Laying of CC road from 25-8-616/1 to 628 and 25-8-623 to 680 at Shanthinagar, Kazipet in Div.No.33 | Kumaraswamy. B | 20-08-2008 | 30 days | 28-01-2009 | | 167037 | 147143 | 103000.1 |
| 431 | Laying of CC Roads and Construction of CC Drains in internal lanes at Somidi, Kazipet in Ward.No.34 | Kumaraswamy. B | 03-10-2008 | 60 days | 28-01-2009 | | 244779 | 209288 | 146501.6 |
| 432 | Laying of CC Road and Construction of Section-I CC Drain from H.No.24-4-98 to 24-4-92 at Beem Nagar, Darga Kazipet in Div.No.31 | Kumaraswamy. B | 20-08-2008 | 30 days | 28-01-2009 | | 135912 | 114364 | 80054.8 |
| 433 | Laying of WBM Road and CC Road at Balasanthawada Internal Lanes Darga Kazipet in Div.No.31 | Kumaraswamy. B | 20-08-2008 | 75 days | 28-01-2009 | | 419390 | 342329 | 239630.3 |
| 434 | Dismantling and re-laying of RCC bed blok on suplus wear gap portion at Kapuwada side, HNK | Chandra Mohan.P | 25-02-2009 | 30 days | 28-01-2009 | | 38000 | 34382 | 24067.4 |
| 435 | Laying of 200 mm dia HDPE Pipe Line from Balanjaneyaswamy Temple to H.No.7-1-389, Div No.28, Hnk | Ravinder Rao A | 10-09-2007 | 30 days | 04-02-2009 | 08/May/2008 | 98308 | 87583 | 61308.1 |
| 436 | L/o CC Road from Poola Rangaiah Taddy Shop to Railway GAte at Kareembad Wgl | Sri Venkateshwara Constructions | 09-01-2007 | 45 days | 04-02-2009 | 17/Mar/2009 | 259663 | 232967 | 163076.9 |
| 437 | L/O OF CC ROAD GRAVEL 16-1-262 TO 373, 16-1-380 TO 386AND 17-2-291/3 AT SRR THOTA WGL | Sri Venkateshwara Constructions | 16-07-2008 | 60 days | 04-02-2009 | 31/Mar/2009 | 508434 | 438487 | 306940.9 |
| 438 | ENGAGE THE JAB ON THE BASIS IS FOR EXCAVTION AT 80'FT ROAD LIST DISMENTALED BEDSIS 80 ROAD AT LAXMI PURAM | Suresh Kumar.S | 05-12-2008 | 15 days | 04-02-2009 | 31/Mar/2009 | 42050 | 39321 | 27524.7 |
| 439 | TRANSPORTATION OF DISMENTALLED DEFRIS AND EX CULVERTS SOCIETY ON 80"ROAD AT LAXMI NAGAR | Suresh Kumar.S | 05-12-2008 | 15 days | 04-02-2009 | 31/Mar/2009 | 35930 | 33598 | 23518.6 |
| 440 | L/O CC ROAD FROM 16-3-1030/2 TO 16-3-1030/10 AT KAREEMABAD ROAD W.NO.15 | Sri Venkateshwara Constructions | 16-07-2008 | 60 days | 04-02-2009 | 06/Apr/2009 | 153085 | 137090 | 95963 |
| 441 | Laying of granite stone to the exesting shubhas chandrabose statue g r gutta wgl | Chandra Mohan.P | 17-07-2008 | 30 days | 04-02-2009 | 19/May/2009 | 66845 | 60939 | 42657.3 |
| 442 | Laying of CC. Road from 11-22-254 at Kashibugga, Wgl | Suresh Kumar.S | 04-06-2009 | 45 days | 04-02-2009 | 04/Jun/2009 | 407896 | 364647 | 255252.9 |
| 443 | Laying of CC Road from EP No. SNG 4 to 2-9-490 at Sri Nagar Colony, HNK | Ravinder Rao A | 19-01-2008 | 45 days | 04-02-2009 | 16/Jun/2009 | 141242 | 123126 | 86188.2 |
| 444 | Laying of CC Road from 22-8-192 to 144 at Ward No.53 | M. Anjaneyulu | 28-07-2008 | 60 days | 04-02-2009 | | 26200 | 23686 | 16580.2 |
| 445 | C/o of CC Road from H.No.10-13-345 to Weight Bridge at Laxmipuram in Ward No.22 | Komuraiah.S | 25-07-2008 | 90 days | 04-02-2009 | 06/Dec/2009 | 920000 | 796925 | 557847.5 |
| 446 | Laying of CC Road from H.No.2-9-176/2 to 2-9-166/3 at Vikas Nagar, HNK D.No.37 | Ravinder Rao A | 13-03-2008 | 45 days | 05-02-2009 | 26/May/2009 | 158498 | 138415 | 96890.5 |
| 447 | L/o CC Road from EPNO.SN 58 to 1-9-1182 at Sahakar Nagar Hnk Div.No.30 | Naresh Kumar.D | 20-12-2007 | 45 days | 05-02-2009 | 04/Jun/2009 | 295472 | 257278 | 180094.6 |
| 448 | L/o of CC Drain at Venkatrao Nagar, Ram Nagar | K. Raghupathi Reddy | 05-10-2008 | 30 days | 05-02-2009 | 14/Jul/2009 | 100000 | 98526 | 68968.2 |
| 449 | Laying of 140mm dia HDPE pipeline from 3-8-95 to EPNO.4 at Kumarpally near Mandivada, Hnk in Div.No.47 | Govardhan Reddy.G | 15-10-2008 | 45 days | 05-02-2009 | 24/Sep/2009 | 166297 | 151871 | 106309.7 |
| 450 | Construction of 900mm box drain from H.No.2-1-25 to Sammaiah Nagar, cause way to Saraswathi Nagar HNK in W.NO.42 | Chandra Mohan.P | 01-09-2008 | 75 days | 05-02-2009 | | 490657 | 435896 | 305127.2 |
| 451 | Construction of Section -II CC Drain from Bhavani Tent House to H.No.16-3-874 at Khammam Road Warangal inWArd.No.15 | Ajay Dalitha LCCS Warangal | 08-11-2008 | 45 days | 05-02-2009 | | 360432 | 322252 | 225576.4 |
| 452 | L/o 200mm dia HDPE Pipe line at Div.No.28 | Chandra Mohan.P | -09-2008 | 75 days | 05-02-2009 | | 573485 | 508020 | 355614 |
| 453 | blindage to existing gurbage at rangaleela maidanam dasara festival kareemabad | Sadanandam. B | 18-09-2008 | 30 days | 07-02-2009 | 18/Apr/2009 | 78065 | 98065 | 68645.5 |
| 454 | leveling teh ravane vadha plot from rangaleela maidan kareema bad | Sadanandam. B | 18-09-2008 | 30 days | 07-02-2009 | 18/Apr/2009 | 84632 | 66668 | 46667.6 |
| 455 | Building for existing WBM Road at Dasara Festival | Sadanandam. B | 18-09-2008 | 30 days | 07-02-2009 | 05/Jun/2009 | 64280 | 53477 | 37433.9 |
| 456 | Repairs to existing drains at H.No.17-3-51/2 and at other places at Kareemabad, Warangal in W.No.12 | G.Sreedhar | 16-10-2008 | 30 days | 08-02-2009 | 20/Nov/2009 | 78462 | 69846 | 48892.2 |
| 457 | Arrestings leakages on 6 dia to 24 dia pipe linein various locations in Ward (W.No.43) (45) to (49) AE Circle IV HNK | Venkateshwarlu. Ch | 25-09-2008 | 30 days | 13-02-2009 | 04/May/2009 | 98370 | 89679 | 62775.3 |
| 458 | C/O COMPOUND WALL AT MUSLIM GIRLS HOSTAL AT BOKKALAGADDA LASKHAR BAZAR HNK WARD NO 45 | Suresh Kumar.S | 24-01-2009 | 30 days | 14-02-2009 | 06/Apr/2009 | 249548 | 221599 | 155119.3 |
| 459 | Arresting of leakages on 6 dia to 24 dia pipeline in varous location in Ward No.43,45 to 49 AE Circle HNK | Venkateshwarlu. Ch | 16-09-2008 | 30 days | 14-02-2009 | 04/May/2009 | 98879 | 90146 | 63102.2 |
| 460 | Supply of Msclomp sets and improvement of H2o Supply etc in HNK Area | Venkateshwarlu. Ch | 30-12-2008 | 15 days | 16-02-2009 | 18/Apr/2009 | 58966 | 53756 | 37629.2 |
| 461 | Laying of Cc Road patches from WMC complex to susheela devi school 8/8/12,8/9/12 SRW 24 at Axis bank and EM Dress to JPRN 55/11 JPN 8/55 ED 14/5/1 and SBI to SRN 33/PV 8/4/86 8/4/96 in Div.No.21 | Ravi kumar.P | 30-08-2008 | 30 days | 17-02-2009 | | 657500 | 574289 | 402002.3 |
| 462 | Formation of Gravel Road at Jyothi Colony, Warangal in Ward No.18 | M/S SAI KRUPA ENTERPRISES | 26-09-2008 | 15 days | 18-02-2009 | 19/Oct/2009 | 47255 | 39578 | 27704.6 |
| 463 | Laying of Gravel Road from 19-9-317 to 19-9-346/C at Nagendra Nagar, Warangal in Ward.No.11 | Srinivas. B | 17-09-2008 | 30 days | 18-02-2009 | 20/Nov/2009 | 102368 | 85686 | 59980.2 |
| 464 | Construction of Section I Drain from 2-12-65 to Ramaiah Plot and 2-12-63 to 2-12-64 at Vayuputra Colony, Hanamkonda in Ward.No.43 | M/S SAI KRUPA ENTERPRISES | 17-09-2008 | 30 days | 20-02-2009 | | 94640 | 83038 | 58126.6 |
| 465 | Laying of CC Road from Main Road to End of the Lane at Puppalagutta, Wgl W.No.7 | M/S SAI KRUPA ENTERPRISES | 17-02-2009 | 30 days | 21-02-2009 | 07/Feb/2009 | 161933 | 144293 | 101005.1 |
| 466 | Restoration of Existing Damaged Drains by construction of CC Drains at Ursu, Prathapa Nagar, W.No.12 | M/S SAI KRUPA ENTERPRISES | 25-02-2009 | 30 days | 21-02-2009 | 07/Feb/2009 | 97233 | 86946 | 60862.2 |
| 467 | Construction of RCC Stair Case at Camp Office, Public Garden, HNK | Srinivas. B | 10-11-2008 | 30 days | 21-02-2009 | 14/Mar/2009 | 99750 | 90680 | 63476 |
| 468 | Appling of Potty inside of rooms of Commissioner Residence at Camp Office, Public Garden, HNK | Srinivas. B | 24-10-2008 | 30 days | 21-02-2009 | 14/May/2009 | 99844 | 91204 | 63842.8 |
| 469 | Filling of Big Pot holes and side berms with hard gravel from Govt. Junior College Junction to bus stand Jonc due to CM Programme | Srinivas. B | 13-08-2008 | 30 days | 21-02-2009 | 14/May/2009 | 89902 | 75296 | 52707.2 |
| 470 | Providing of pointing commissioner quarters situated at Public Garden HNK | Srinivas. B | 20-12-2008 | 30 days | 21-02-2009 | 08/Jun/2009 | 99620 | 91000 | 63700 |
| 471 | laying of cc road from EP.No SRT 7/11/2 to 17/2/336/1 jyothi nagar warangal ward no 18 | Sri Venkateshwara Constructions | 19-01-2009 | 45 days | 23-02-2009 | 06/Apr/2009 | 204508 | 183221 | 128254.7 |
| 472 | C/o of CC Road from H.No.11-28-241/1/1 to 272 at Thummalakunta, Ward No.53 | Sri Venkateshwara Constructions | 19-01-2009 | 60 days | 25-02-2009 | | 520000 | 471614 | 330129.8 |
| 473 | C/o CC Drain from H.No. 2-4-1535 to EP No. ASC 15 at Ashok Colony HNK in Div. (41) | Srinvias P | 17-02-2009 | 15 days | 26-02-2009 | 27/Feb/2009 | 225983 | 198281 | 138796.7 |
| 474 | Laying of C.C Road at Tejaswi School at Naimnagar, HNK in Ward No.44 | Srinvias P | 17-02-2009 | 30 days | 26-02-2009 | 28/Feb/2009 | 55992 | 49960 | 34972 |
| 475 | Construction of 300mm size drain from H.No.11-28-260 to FBC 55 and 22-8-210 to 276 and internal lanes at Thummalakunta and Mainarity Colony, Warangal in W.No.53 | Sanjeev. G | 19-01-2009 | 60 days | 26-02-2009 | 08/Apr/2009 | 414848 | 366693 | 256685.1 |
| 476 | C/o 300 mm size drain from H.No. 11-30-58 to 11-30-64 and 11-28-233/B at thumalakunta, Warangal in w.No.53 | Sri Venkateshwara Constructions | 03-02-2009 | 30 days | 26-02-2009 | 08/Apr/2009 | 90000 | 79633 | 55743.1 |
| 477 | GRAVELFORMATION AND LAYING OF 450 PIPES AT VIDYANAGAR HNK | Chandra Mohan.P | 18-10-2008 | 30 days | 26-02-2009 | 21/Apr/2009 | 62868 | 52617 | 36831.9 |
| 478 | GRAVEL FORMATION L2J OF CROSS PIPES FROM 80`ROAD VIJAYACOLONY AT HNK | Chandra Mohan.P | 18-10-2008 | 30 days | 26-02-2009 | 21/Apr/2009 | 44310 | 38875 | 27212.5 |
| 479 | providing of blindage to damaged approch roads to rangaleela maidanam kareema bad warangal | Sadanandam. B | 18-09-2008 | 15 days | 26-02-2009 | 01/May/2009 | 60000 | 50680 | 35476 |
| 480 | LAYING OF CC ROAD 16-6-94 TO 16-5-67 AT PERUKAWADA | Chandra Mohan.P | 30-11-2008 | 30 days | 26-02-2009 | 02/May/2009 | 99341 | 89029 | 62320.3 |
| 481 | LAYING OC CC ROAD 16-6-193 TO EPPKW2AT PERUKAWADA WGL | Chandra Mohan.P | 09-12-2008 | 30 days | 26-02-2009 | 02/May/2009 | 102449 | 91259 | 63881.3 |
| 482 | Laying of CC Road from 16-6-195 to Opp: Masjid at Perukawada, Wgl W.No.17 | Chandra Mohan.P | 08-12-2008 | 30 days | 26-02-2009 | 02/May/2009 | 101466 | 90752 | 63526.4 |
| 483 | Laying of CC Road from 16-6-185 to 16-5-83 at Perukawada, W.No.17 | Chandra Mohan.P | 09-12-2008 | 30 days | 26-02-2009 | 02/May/2009 | 101487 | 90868 | 63607.6 |
| 484 | Supply and filling of Sand at Childrens park equipments in Public Garden, Hnk in ward no 46 | Venkateshwarlu. Ch | 17-02-2009 | 30 days | 26-02-2009 | 08/May/2009 | 69069 | 56557 | 39589.9 |
| 485 | s & d of doors at beside wmc wgl | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/May/2009 | 101976 | 93148 | 65203.6 |
| 486 | interpainting to the to the newly sheeds at wmc | Chandra Mohan.P | 30-12-2008 | 15 days | 26-02-2009 | 11/May/2009 | 44609 | 40747 | 28522.9 |
| 487 | contruction ceramic tiles fooling in rooms at wmc | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/May/2009 | 95325 | 87296 | 61107.2 |
| 488 | scd of windows at nely proposed sheds at wmc | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/May/2009 | 90420 | 85735 | 60014.5 |
| 489 | contruction 110mm hdpe pipe line 14-7-72 WP34/1/2 to 14-7-65 to 14-7-62 at Nizarpuram.wgl | Chandra Mohan.P | 01-01-2009 | 30 days | 26-02-2009 | 11/May/2009 | 45291 | 41369 | 28958.3 |
| 490 | contructionof RRmasom & G/Gat newly constration wmc | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/May/2009 | 103506 | 89697 | 62787.9 |
| 491 | contructioncbs in rooms and dobby at new construction at wmc | Chandra Mohan.P | 30-12-2008 | 30 days | 26-02-2009 | 11/May/2009 | 94477 | 87327 | 61128.9 |
| 492 | Shiftting Modifications to colouring and replacement of Gandhi Statue Perukawada | Chandra Mohan.P | 21-01-2009 | 30 days | 26-02-2009 | | 103314 | 92698 | 64888.6 |
| 493 | contruction of parking tiles to subash statue junctionat govindrajula gutta wgl | Chandra Mohan.P | 03-01-2009 | 30 days | 26-02-2009 | 19/May/2009 | 89723 | 81367 | 56956.9 |
| 494 | D/o of 75 mm HDPE Pipe Line from H.No.25-11-27 Community Hall Bapuji Nagar, Kzpt | Chandra Mohan.P | 09-09-2008 | 30 days | 26-02-2009 | | 35358 | 32297 | 22607.9 |
| 495 | Construction of C.c. Road from H.No.1-9-992 to E.P.No.PCS13/11, 1-9-1016 at postal colony, Hnk, Div.No.36 | Laxmi Narayana.D | 18-08-2008 | 75 days | 26-02-2009 | 02/Jun/2009 | 552135 | 481694 | 337185.8 |
| 496 | Constructionof CC Road from H.No.1-7-124 to 1-7-117, 1-7-95 to 1-7-85 at Widows Colony, HNK Div No.29 | Laxmi Narayana.D | 12-02-2008 | 45 days | 26-02-2009 | 02/Jun/2009 | 247952 | 222108 | 155475.6 |
| 497 | Construction of Section - I and II C.C. Drain from Static Tank to Maternity at ST area, Warangal Ward No.9 | Laxmi Narayana.D | 12-02-2008 | 60 days | 26-02-2009 | 02/Jun/2009 | 501229 | 437821 | 306474.7 |
| 498 | Laying of CC Road from 2-7-485 to Opp: 2-7-1246 at Excise Colony, HNK D.No.39 | M/s. P.W.L.C.Coop.Society, Laxmipuram | 22-10-2008 | 60 days | 26-02-2009 | 30/Jun/2009 | 260310 | 227670 | 159369 |
| 499 | Laying of CC patch work from H.No 6-2-329 to H.No NBH 16 at New Bus stand Road, and Govt. Junior College Road,Hnk Ward No.46 | Venkateshwarlu. Ch | 17-02-2009 | 30 days | 26-02-2009 | 07/Aug/2009 | 82660 | 73586 | 51510.2 |
| 500 | Formation of Gravel Road at Muslim Grave Yard, Khammam Road, Warangal in Ward.No. 15 | Chandra Mohan.P | 17-09-2008 | 30 days | 26-02-2009 | | 90447 | 75742 | 53019.4 |
| 501 | Laying of 110mm dia HDPE pipe line from EP No. KN 55 II 5/8 to H.No. 5-11-47/3 at Jagruthi Colony Hanamkonda in Ward No.44 | Chandra Mohan.P | 17-09-2008 | 30 days | 26-02-2009 | | 43298 | 39536 | 27675.2 |
| 502 | Construction of Sec-I Drain from 2-4-1312 to 1321 at Gandhi Nagar, Hanamkonda in Ward.No.41 | Chandra Mohan.P | 06-09-2008 | 30 days | 26-02-2009 | | 102565 | 91876 | 64313.2 |
| 503 | Laying of CC Road from H.No.2-6-1248 to
2-6-1198 on subedari police station to St. peter's school Road, Hanamkonda in Ward No.38 | M/s Waddera Labour Contract Co-operative Society, Rampur. | 07-04-2008 | 90 days | 26-02-2009 | 22/Sep/2009 | 1040060 | 932424 | 652696.8 |
| 504 | Laying of WBM Road from H.No. 22-7-1 to 66 and 22-7-75 to Temple at Doctor's Colony Phase-II, Warangal In.Ward.No.53 | Sanjeev. G | 19-01-2009 | 60 days | 26-02-2009 | | 477591 | 381607 | 267124.9 |
| 505 | Cleaning of filteration sump wall and servicing sluice walls and spanners at filterbed at KUC,Hnk under AE Cirlce- IV | Venkateshwarlu. Ch | 25-09-2008 | 30 days | 26-02-2009 | 08/Oct/2009 | 84668 | 77186 | 54030.2 |
| 506 | Repirs to Drains at Shiva Nagar, Warangal in Ward.No. 16 | Sri Venkateshwara Constructions | 11-11-2008 | 30 days | 26-02-2009 | | 49973 | 44760 | 31332 |
| 507 | Repairs to Drains at SRR Thota, Warangal in Ward No. 18 | Sri Venkateshwara Constructions | 17-02-2009 | 30 days | 26-02-2009 | | 50000 | 44716 | 31301.2 |
| 508 | Laying of 110mm dia HDPE pipes KUDA Gate to Bus Stand Road and Construction of Section-II Drain from JNS Compound to Busstand Road Hanamkonda in Ward.No.46 | G. Sathyanarayana | 12-12-2009 | 30 days | 26-02-2009 | | 98357 | 88295 | 61806.5 |
| 509 | Construction of Section-I CC Drain from 19-10-209 to 19-10-203 at Gavicherla Road Shambunipet Warangal in Ward.No.10 | Mandala Suresh | 17-09-2009 | 30 days | 26-02-2009 | | 92576 | 86145 | 60301.5 |
| 510 | Laying of 110mm dia HDPipe at West fort Warangal | Suresh Kumar.S | 25-02-2009 | 30 days | 27-02-2009 | 28/May/2008 | 101655 | 92855 | 64998.5 |
| 511 | Laying of CC Road from 22-8-22 to 22-8-72 Doctors Colony - II Wgl W.No.53 | Niranjan .V | 01-12-2009 | 60 days | 27-02-2009 | 31/Oct/2008 | 498669 | 404151 | 282905.7 |
| 512 | Formation of Gravel Road at Shiva Nagar Sub Station, Shivanagar, Wgl W.No.17 | G.Sreedhar | 22-09-2008 | 30 days | 27-02-2009 | 07/Apr/2009 | 44660 | 36996 | 25897.2 |
| 513 | LEVELLING OF ROAD WITH GRAVEL FOR DAMAGED PORTION FROM 11-28-270 TO 275 & 11-30-472 TO 11-28-289 AT THUMMALAKUNTA WGL | G.Sreedhar | 22-08-2008 | 30 days | 27-02-2009 | 13/Apr/2009 | 43000 | 35657 | 24959.9 |
| 514 | leveling the road gravel for damage portion from 22-8-152 at weavers colony | G.Sreedhar | 28-08-2008 | 30 days | 27-02-2009 | 13/Apr/2009 | 47500 | 39304 | 27512.8 |
| 515 | desilting of emisting cc drain vent 16-4-1517 to at shivanagar | Chandra Mohan.P | 07-09-2008 | 15 days | 27-02-2009 | 18/Apr/2009 | 73000 | 68397 | 47877.9 |
| 516 | Formation of Gravel roads at Lenin Nagar Wgl Ward No. 10 | GORRE AMARNATH | 28-01-2009 | 45 days | 27-02-2009 | 05/May/2009 | 199723 | 150746 | 105522.2 |
| 517 | Laying of CC Road from 20-12-177 to Gold Smith Hall at Mudirajwada, East Fort, Warangal in Ward NO. 9 | S.SHIVASHANKAR | 17-02-2009 | 45 days | 27-02-2009 | 10/Jun/2009 | 167391 | 149995 | 104996.5 |
| 518 | Laying of 110mm dia HDPE pipe line from H.no. 20-8-99 to 20-9-109 at West Fort, Warangal in Ward.No. 8 | Suresh Kumar.S | 29-02-2009 | 30 days | 27-02-2009 | 10/Jun/2009 | 99666 | 90055 | 63038.5 |
| 519 | Formation of Gravel Road from 2-8-573/1/3 to Opp:2-8-682 at Bhavani Nagar, HNK in Div.No.38 | Sampath Rao.K | 25-03-2008 | 45 days | 27-02-2009 | 12/Jun/2009 | 193861 | 138586 | 97010.2 |
| 520 | L/o CC road from H.No 2-10-755/2 on opp H.NO. 2-10-933 at teacher Colony Hnk | M/s. P.W.L.C.Coop.Society, Laxmipuram | 18-01-2009 | 60 days | 27-02-2009 | 15/Jun/2009 | 324387 | 289210 | 202447 |
| 521 | Construction of CC Drain from 5-11-14 to 5-11-32/1 at Jagruthicolony, HNK W.No.44 | Ravi kumar.P | 30-07-2008 | 30 days | 27-02-2009 | 23/Jun/2009 | 72000 | 64420 | 45094 |
| 522 | Formation of Gravel Road and Filling for Bathukamma and Dasara Festival at Bestham Chruvu, Rangasaipet, Warangal in Ward No.11 | Ravi kumar.P | 18-09-2008 | 15 days | 27-02-2009 | | 29922 | 24894 | 17425.8 |
| 523 | Arresting of Leakages in AE Circle -I Area Warangal | Govardhan Reddy.G | 27-01-2009 | 30 days | 27-02-2009 | 21/Aug/2009 | 74896 | 70150 | 49105 |
| 524 | Construcytion of CC drain from H.No. 11-23-762 to 11-23-784 at LB Nagar Warangal in Ward.No.03 | M/s. ASHOKA DALITHA CIVIL AND SANITATION LCWM C & S LTD., | 15-12-2008 | 60 days | 27-02-2009 | | 462487 | 415238 | 290666.6 |
| 525 | Layig of WBM Road at Santoshimatha Colony & Sai Nagar Colony at Hunter Road, Wgl. | Laxmi Narayana.D | 15-10-2008 | 90 days | 27-02-2009 | 19/Sep/2009 | 837302 | 667052 | 466936.4 |
| 526 | Construction of compound wall to Burrial ground located at Kashibugga society colony, warangal in ward.no.04 | Preethi Const. | 29-07-2008 | 90 days | 27-02-2009 | 24/Sep/2009 | 970000 | 860323 | 602226.1 |
| 527 | Constructionof Section -I Cc Drain at Chintal and Puppalagutta, Warangal in Ward. No.07 | Preethi Const. | 20-08-2008 | 75 days | 27-02-2009 | 29/Sep/2009 | 503284 | 442954 | 310067.8 |
| 528 | Laying of CC Road from 01-07-253 to 1-7-328 at Pragathi Nagar Revenue Colony, Hanamkonda | Rajendra Prasad | 07-08-2008 | 90 days | 27-02-2009 | | 497716 | 434617 | 304231.9 |
| 529 | Laying of CC Road in Teachers Colony Ph-II Hnk in W.No. 37 | Kumaraswamy. B | 27-02-2009 | 30 days | 27-02-2009 | | 149113 | 133345 | 93341.5 |
| 530 | Laying of WBM road from 24-4-32 to 24-4-43 and 24-4-59 and L/o of CC Road 24-4-73 to 24-4-63 Ambedhakar Nagar Kazipet Ward No. 31 | Kumaraswamy. B | 27-02-2009 | 30 days | 27-02-2009 | | 102550 | 86661 | 60662.7 |
| 531 | Construction of 900mm vent CC Drain from Burial Ground to Ep.No.12at Pochammakunta Hanamkonda in Ward.No.44 | Manohar.M | 13-08-2008 | 90 days | 27-02-2009 | | 957697 | 803900 | 562730 |
| 532 | Formation of gravel road at abbanikunta, Warangal | Suresh Kumar.S | 17-01-2008 | 15 days | 28-02-2009 | 04/Jun/2008 | 58901 | 48996 | 34297.2 |
| 533 | Laying of C.C. Road from E.P.No.WPR 13/8 to H.No.2-7-1167/2 at Kanakadurga Colony | Rajendra Prasad | 07-11-2009 | 30 days | 28-02-2009 | 23/Apr/2009 | 47317 | 42093 | 29465.1 |
| 534 | Laying of CC Road from 2-9-896 to EP No. NGO C16/6, 2-9-904 to 2-9-907 at Indiranagar, Waddepally, HNK Div No.37 | Rajendra Prasad | 09-01-2009 | 60 days | 28-02-2009 | 27/Apr/2009 | 193253 | 168287 | 117800.9 |
| 535 | Laying of WBM Road from 2-8-445/3 to EP No. WPR 21/12, 2-8-455/4 to 2-8-464/5 at Vijayapal Colony, HNK in Div.No.38 | Sampath Rao.K | 15-02-2008 | 60 days | 28-02-2009 | 12/Jun/2009 | 495286 | 396263 | 277384.1 |